Don Jones provided an update on the status of equipment upgrades and cable management tasks for June 6, 2024. The tech team removed enclosures with Simona's help, worked on soldering connectors, discussed cable layout with colleagues, and had undergraduates assisting on site. Initiatives included de-installing a prototype for further examination and organizing cable trays for various equipment connections. Specific details were shared about the types and quantities of cables, as well as the arrangement of detectors and FADCs in crates.


Uploaded on Jul 01, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. ECal General Status Update June 6, 2024 Don Jones

  2. Update Techs removed enclosure with Simona s help on Monday I am working with Lars who is going to solder on connectors to the heater power supplies so they can easily connect to Marc s chassis boxes I now have 1100 BNC-LEMO RG58 cables from Alex. He says he will order another 600 if we need them Tiger, the company that made the RG 174 BNC-LEMO cables that had so much noise, wants more information on what the issues are. How many were tested? What is the noise spectrum? Are they all bad? I met with Simona and Jimmy in the Hall to discuss layout of the DAQ and cables Is the best place for the extra cables alongside the equipment container? We now have 2 undergraduates onsite from VT, Ryan and Keagan, working along with Mahmoud. I plan to de-install the prototype today and get it moved to physics storage where I can take it apart and examine the crystals for clarity.

  3. Cable tray BNC to BNC PP 3m BNC-LEMO cables to FADC 256 channels BNC to BNC PP 3m BNC-LEMO cables to FADC 256 channels BNC to BNC PP 3m BNC-LEMO cables to FADC 256 channels BNC to BNC PP 3m BNC-LEMO cables to FADC 256 channels U14 17 U14 17 U14 17 U14 17 NIM crate 1656 Channels VME FADCs VME VME VME VME Cable tray FADC crate FADC crate FADC crate FADC crate BNC to ? PP 3m BNC-LEMO cables to FADC 256 channels BNC to ? PP 3m BNC-LEMO cables to FADC 256 channels BNC to ? PP 3m BNC-LEMO cables to FADC 256 channels VXS Scaler crate VME Trigger electronics crate VME VME VME FADC crate FADC crate FADC crate

  4. Cabletrays HCAL Could go here HCAL GEMS Or here GEMS Rack power supply Power supply Ceiling panel edge 28 2 Power supplies

  5. Detector Left 828 crystals 54 FADCs Detector Right 828 crystals 54 FADCs Detector Left 828 crystals 54 FADCs Detector Right 828 crystals 54 FADCs VXS Crate 7: 16 FADCs and NIM amps 252 PMTs (108L,144R) 4 empty FADC channels VXS Crate 7: 16 FADCs and NIM amps 252 PMTs (108L,144R) 4 empty FADC channels VXS Crate 6: 15 FADCs and NIM amps 234 PMTs (144L,90R) 6 empty FADC channels VXS Crate 6: 15 FADCs and NIM amps 234 PMTs (144L,90R) 6 empty FADC channels VXS Crate 5: 16 FADCs and NIM amps 243 PMTs (135L,108R) 13 empty FADC channels VXS Crate 5: 16 FADCs and NIM amps 243 PMTs (135L,108R) 13 empty FADC channels VXS Crate 4: 16 FADCs and NIM amps 243 PMTs (135L,108R) 13 empty FADC channels VXS Crate 4: 16 FADCs and NIM amps 243 PMTs (135L,108R) 13 empty FADC channels VXS Crate 3: 16 FADCs and NIM amps 243 PMTs (135L,108R) 13 empty FADC channels VXS Crate 3: 16 FADCs and NIM amps 243 PMTs (135L,108R) 13 empty FADC channels VXS Crate 2: 15 FADCs and NIM amps 225 PMTs (113L, 112R) 15 empty FADC channels VXS Crate 2: 15 FADCs and NIM amps 225 PMTs (113L, 112R) 15 empty FADC channels VXS Crate 1: 14 FADCs and NIM amps 216 PMTs (60L, 156R) 8 empty FADC channels. VXS Crate 1: 14 FADCs and NIM amps 216 PMTs (60L, 156R) 7 empty FADC channels.