Energy Strategy and Projects in R.nad Szavou City

 
Energy strategy of the City of
Žďár nad Sázavou
 
The current state and the perspective
 
Briefly about Žďár nad Sázavou
 
Wien 25. 4. 2023
 
 
I
nhabitants
: 
20 000
 
B
udget: 
2
5
 mio.
 
E
nergy consumption:
13 473 MWh
/year
 
The 
energy review of 
Žďár n. S.
 
The heating consumption is relatively low
The electric energy consumption can be reduced
The distric heating system owned by the City
The energy management system certified by ISO
50001
Low portion of RES
The energy management covers water management
as well
 
 
Wien 25. 4. 2023
 
EnMS certified by ISO 50 001
 
The EnMS in Žďár covers:
211 electric delivery points (43 public lighting)
62 heat delivery points
19 gas delivery points
97 water meters
Energy consumption and expenditures are recorded
in database
The data are used for energy stock purchasing
EnMS was proved by certification body
Certifikate was revealed in March 2023
 
Wien 25. 4. 2023
 
EnMS certified by ISO 50 001
 
Wien 25. 4. 2023
 
SECAP: CO
2 
reduction
 
 
Wien 25. 4. 2023
 
Finished and prepared energy projects
 
 
Wien 25. 4. 2023
 
The total area of municipal buildings roofs exceeds 45 000 m
2
How to use this potential?
 
Finished and prepared energy projects
 
 
Wien 25. 4. 2023
 
Biosolar green roof combines PV panels and low plants;
First instalation in the Czech-Moratian Highland
Coopeeration with the university reseach centre UCEEB
 
Finished and prepared energy projects
 
 
Wien 25. 4. 2023
 
Hybrid colectors combine PV panels and solar heating surface;
92 colectros will be installed on the swimming pool roof during 2024
Slide Note

Rozvoj konceptu Smart City ve Žďáře nad Sázavou

text

Embed
Share

"Explore the energy strategy and projects in the city of R.nad Szavou, focusing on reducing CO2 emissions, energy consumption, and utilizing renewable energy sources. Discover innovative initiatives like biosolar green roofs and hybrid collectors to maximize energy potential in municipal buildings."

  • Energy
  • Strategy
  • Projects
  • CO2 Emissions
  • Renewable Energy

Uploaded on Mar 01, 2025 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. Energy strategy of the City of r nad S zavou The current state and the perspective

  2. Briefly about r nad Szavou Inhabitants: 20 000 Budget: 25 mio. Energy consumption: 13 473 MWh/year Wien 25. 4. 2023

  3. The energy review of r n. S. The heating consumption is relatively low The electric energy consumption can be reduced The distric heating system owned by the City The energy management system certified by ISO 50001 Low portion of RES The energy management covers water management as well Wien 25. 4. 2023

  4. EnMS certified by ISO 50 001 The EnMS in r covers: 211 electric delivery points (43 public lighting) 62 heat delivery points 19 gas delivery points 97 water meters Energy consumption and expenditures are recorded in database The data are used for energy stock purchasing EnMS was proved by certification body Certifikate was revealed in March 2023 Wien 25. 4. 2023

  5. EnMS certified by ISO 50 001 Wien 25. 4. 2023

  6. SECAP: CO2 reduction year 2000 2005 2010 2015 2019 2030 GWh 223 217 198 185 183 ~ 155 CO2 [t] ~ 56 816 107 681 100 766 91 644 70 135 66 804 Pokles emis CO2 v i roku 2000 100.0% 100.0% 90.0% 93.6% 80.0% 85.1% 70.0% spory CO2 v % 60.0% 65.1% 62.0% 50.0% 40.0% 30.0% 20.0% 10.0% 0.0% 2000 2005 2010 2015 2019 Wien 25. 4. 2023

  7. Finished and prepared energy projects The total area of municipal buildings roofs exceeds 45 000 m2 How to use this potential? Wien 25. 4. 2023

  8. Finished and prepared energy projects Biosolar green roof combines PV panels and low plants; First instalation in the Czech-Moratian Highland Coopeeration with the university reseach centre UCEEB Wien 25. 4. 2023

  9. Finished and prepared energy projects Hybrid colectors combine PV panels and solar heating surface; 92 colectros will be installed on the swimming pool roof during 2024 Wien 25. 4. 2023

More Related Content

giItT1WQy@!-/#giItT1WQy@!-/#giItT1WQy@!-/#