Empowering Pavapuri Village with Solar Energy Solution

Slide Note
Embed
Share

The journey of realizing and implementing a solar station in Pavapuri, Rajasthan, highlights the challenges faced by the village due to frequent electricity issues. Despite budget constraints and technical training needs for villagers, a solution was formulated with the support of a charitable group, leading to the selection of the best supplier and initiating the construction process for the solar station. The project aims to provide a constant source of reliable electricity while reducing pollution and lowering electricity costs for the village.


Uploaded on Sep 16, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. Solar Station in Pavapuri By: Shanay Sanghvi

  2. The Realization of a Problem Pavapuri is a small village in the state of Rajasthan Population of 200 300 people Frequent electricity issues Covid really highlighted the problem on my visit this winter I sat down with the senator to discuss the problem I suggested a solution of implementing a solar station

  3. Potential Obstacles Budget problems Village has low funds Need to look for alternatives Technical Training Villagers are not educated on solar energy Need seminars and workshops for villagers

  4. Finances and Funding Senator connected me to a religious charitable group called K.P.Sanghvi K.P.Sanghvi has helped several villages with Water issues Electricity Schools and Collages They connected me to Mr. Parikh, a mechanical engineer who has worked in the energy industry for 25 years We drew out a rough plan with estimated for energy capacity, plant size, panel requirements K.P.Sanghvi agreed to sponsor the entire project

  5. Identifying and Evaluating Solar Panel Supplier We listed 3 primary suppliers based on Mr. Parikh s experience: Adani : Industry leaders PV Powertech : Growing company Evvo : British company, great industry position Khanak systems, a broker provided us with a bundle which included: Solar panels from each of these companies Construction equipment Labor Insurance

  6. Choosing the Best Supplier Evvo s delivery period was very high which did not align with our schedule We chose to go with Adani for a few reasons: Industry Leaders Great post purchase customer service Affordable price High quality panels Yearly maintenance

  7. Conclusion Once we placed the order, the expected delivery time was 2-3 weeks We started with the construction process of the base of the station Used aluminum for lower costs yet great stability Once we receive the panels, we will begin installing them The journey has been humbling for me as I have realized the importance of basic things in life that most people live without This station will help them for many years to come by: Lowering electricity costs Constant source of reliable electricity Reduced pollution

Related


More Related Content