Developments in Far West Texas Energy Hub

Far West
Texas Hub
CMWG Meeting
February 3, 2020
Far West Texas Changes
Dramatic Load Growth
Expansion of Oil and Gas Production.
Natural Gas Pipeline construction to Gulf Coast
Electric Grid
Nodal prices that move dramatically different from the West Hub
Extensive Transmission Upgrades underway
Expansive Inverter Based Generation Development
Volatility
Lubbock joining ERCOT
ERCOT’s  New hubs
Panhandle
Provides transparency into congestion and generation activity
versus West and North Hub
Valley Hub NPRR
20-month schedule
Need to start Far West Hub
development
ERCOT Market needs price transparency in Far West Texas
Forward Curve needed to support investment
Identify Potential Nodes
Refine design after 2020 transmission upgrades are operational
Slide Note
Embed
Share

The CMWG meeting in Far West Texas on February 3, 2020 discussed the significant changes in the region, including dramatic load growth, oil and gas production expansion, and natural gas pipeline constructions. The presentation highlighted the need for price transparency, forward curve development, identification of potential nodes, and refinement post-2020 transmission upgrades.

  • Energy Hub
  • Texas
  • ERCOT
  • Transmission Upgrades
  • Price Transparency

Uploaded on Sep 18, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. CMWG Meeting February 3, 2020 Far West Texas Hub

  2. Far West Texas Changes Dramatic Load Growth Expansion of Oil and Gas Production. Natural Gas Pipeline construction to Gulf Coast Electric Grid Nodal prices that move dramatically different from the West Hub Extensive Transmission Upgrades underway Expansive Inverter Based Generation Development Volatility Lubbock joining ERCOT

  3. ERCOT s New hubs Panhandle Provides transparency into congestion and generation activity versus West and North Hub Valley Hub NPRR 20-month schedule

  4. Need to start Far West Hub development ERCOT Market needs price transparency in Far West Texas Forward Curve needed to support investment Identify Potential Nodes Refine design after 2020 transmission upgrades are operational

More Related Content

giItT1WQy@!-/#giItT1WQy@!-/#