Cost-Benefit Study of Regional Technical Cooperation Project RLA/99/901

Slide Note
Embed
Share

Regional Technical Cooperation Project RLA/99/901 focused on the Cost-Benefit Study of the SRVSOP system for safety oversight in various Latin American countries. The project included training, assistance, and certification to improve safety standards in the aviation sector. Quantitative analysis revealed significant cost savings and benefits amounting to USD 13.7 million from 2001 to 2008. The conclusion highlighted the importance of updated regulations, top savings, and support for aviation professionals.


Uploaded on Sep 13, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. Organizacin de Aviacin Civil Internacional SRVSOP COST-BENEFIT STUDY Mr. Lorenzo Sepulveda Director of Flight Safety, Chile DGAC October 2011 Santiago, oct. 2011 1

  2. Summary REGIONAL TECHNICAL COOPERATION PROJECT RLA/99/901 COST-BENEFIT STUDY CONCLUSION Santiago, oct. 2011 2

  3. REGIONAL TECHNICAL COOPERATION PROJECT RLA/99/901 Regional Cooperation System for Safety oversight (SRVSOP). Argentina Venezuela Bolivia Observers: Uruguay Brasil SRVSOP Per Chile Paraguay Colombia Panam Cuba Ecuador Santiago, oct. 2011 3

  4. Date/Team: 2008 4 Specialists from the Member States. Scenarios: Without the project With the project Santiago, oct. 2011 4

  5. SRVSOP Products Training Assistance to States LARs AMOs Multinational Certification Santiago, oct. 2011 5

  6. Cost-benefit study Quantitative analysis COST WITHOUT SRVSOP COSTO WITH SRVSOP PRODUCT BENEFIT Training Assistance to States 2.060.570 927.985 1.132.585 260.000 119.350 140.650 LARs Production OMAs Certification 15.137.333 2.236.732 11.806.406 881.870 244.481 637.389 13.717.030 TOTALS 18.339.773 3.528.548 Summary of costs and benefits (cost savings) valued at USD between 2001 to 2008: Santiago, oct. 2011 6

  7. Benefit SRVSOP has registered in the period 2001 - 2008 a benefit of: US$13.717.030 Santiago, oct. 2011 7

  8. Conclusions Regulation updated Top Savings Support professionals Santiago, oct. 2011 8

  9. MUCHAS GRACIAS THANK YOU VERY MUCH Santiago, oct. 2011 9