Activity-Based Costing for Cost Analysis

undefined
 
Activity Based Costing
 
 
Product Cost
 
Direct Materials
Direct Labor
Overhead
 
Plant Wide Overhead
 
Estimated Overhead dollars – annual/
Estimated Driver = Predetermined Overhead Rate
 
Drivers
Direct Labor Hours
Direct Labor $
Machine Hours
 
Activites
 
Additional Activites
     
Activity Measure
Machine Set up
      
Direct Labor Hour
Production Orders
     
# of POs
Shipments or customer deliveries
   
#shipments
General Factory
      
Machine hours
Engineering Design Time
    
Engineering Hrs
Board Etching
      
#boards
Parts Management
     
#parts
 
Determine Activity Rate
 
Estimate the cost pool Activity $/Estimated Driver
 
Do Exercise 3-2 on page 142
 
Apply overhead
 
Traditional
Actual Driver X predetermined OH rate
 
Activity Based Costing
 
Actual Driver x activity rate
 
Problem 3-3 pg143
 
Problem 3-10 Trad vs ABC
 
ABC
Slide Note
Embed
Share

Activity-Based Costing (ABC) is a method used to allocate costs accurately by identifying activities that drive costs. It involves assigning costs to products based on the activities required to produce them. This approach provides a more precise reflection of the resources consumed by each product, leading to better decision-making in cost management.

  • Cost analysis
  • Activity-Based Costing
  • ABC method
  • Cost allocation
  • Decision-making

Uploaded on Sep 11, 2024 | 1 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. Activity Based Costing

  2. Product Cost Direct Materials Direct Labor Overhead

  3. Plant Wide Overhead Estimated Overhead dollars annual/ Estimated Driver = Predetermined Overhead Rate Drivers Direct Labor Hours Direct Labor $ Machine Hours

  4. Activites Additional Activites Machine Set up Production Orders Shipments or customer deliveries General Factory Engineering Design Time Board Etching Parts Management Activity Measure Direct Labor Hour # of POs #shipments Machine hours Engineering Hrs #boards #parts

  5. Determine Activity Rate Estimate the cost pool Activity $/Estimated Driver Do Exercise 3-2 on page 142

  6. Apply overhead Traditional Actual Driver X predetermined OH rate Activity Based Costing Actual Driver x activity rate Problem 3-3 pg143

  7. Problem 3-10 Trad vs ABC Direct materials $1,620,000 $3,825,000 Direct labor 455,000 975,000 Manufacturing overhead applied @ $20.00 per direct labor- hour 700,000 1,500,000 Total manufacturing cost (a) $2,775,000 $6,300,000 Number of units (b) 25,000 75,000 Unit product cost (a) (b) $111.00 $84.00

  8. ABC Direct materials $1,620,000 $3,825,000 Direct labor 455,000 975,000 Supporting direct labor 253,750 543,750 Batch setups 425,000 255,000 Product sustaining 325,000 325,000 General factory 18,125 54,375 Total cost (a) $3,096,875 $5,978,125 Number of units (b) 25,000 75,000 Unit product cost (a) (b) $123.88 $79.71