2024 RA Guide and Templates Workshop Logistics

 
2024 RA Guide and Templates Workshop
 
 
August 3, 2023
1:00 p.m. – 3:00 p.m.
 
Logistics
 
 Online only​
Audio through computer or phone
Toll-free 855-282-6330 or 415-655-0002
Access code: 
2494 568 3861
 
  Type password : 
pdJVw3cdP63
 
 Hosts (Energy Division Staff)​
 Lily Chow
Jaime Rose Gannon
 
The workshop is being recorded
 
Safety
Note surroundings
and emergency exits
Ergonomic check
 
 
Workshop Logistics
 
3
 
Mute/ Unmute
 
Participant List
 
Chat
 
Audio Options
 
All attendees have been muted
Panelist that are presenting have been identified and will be
identified as panelist when their issue/topic is being addressed
To ask questions please use the Q&A function (send "To All Panelists")
or raise your hand
Questions will be read aloud by staff; attendees may be unmuted to
respond to the answer. (Reminder: Mute back!)
 
On the bottom right of screen:
click "3 dots" for Q&A
 
Ground Rules
 
 
Workshop is structured to facilitate understanding of the 2024 RA
compliance process.
 
Keep comments friendly and respectful.
 
Please use Q&A feature only for questions, or technical issues.
 
Do NOT start or respond to sidebar conversations in the Chat.
 
 
 
 
Agenda
 
1:00 
pm
 – 1:15 pm –
 
 Introduction and Overview of Agenda
Today’s Objective
o
To demonstrate new features of the RA templates and guide for 2024 compliance year
1:15 pm – 1:30 pm - 
 
Central Procurement Entity Implementation
 
1:30 pm – 2:00 pm
 
2024 RA Guide
Changes in D.23-06-029
Other Modifications to the RA Guide
2:00
 pm – 2:30 pm - 
 
General Demonstration of RA templates
Revised Local and Flexible Template
o
Changes to the Local and Flexible template - CPE
o
Practice entering resource into template for both Local and Flexible compliance
o
Practice verifying compliance
o
Go through advisory monthly flexible tables
Month Ahead Load Forecast Template
o
Demonstration of entering load migration
o
Demonstration of how the load migration values flow into the RA System
System Template
o
Changes to the System template
o
Practice entering load and resource information for both System and Flexible compliance, including CAM/RMR
o
Practice verifying compliance
2:30 pm – 2:45 pm
 
Wrap Up and Next Steps
Informal comments due on 
August 11, 2023
Finalize Guide and Templates 
late September 2023
Overview of Year Ahead allocation and compliance schedule
 
5
 
Central Procurement Entity Implementation
 
For the 2024 Year Ahead Compliance Process
LSEs in PG&E and SCE TAC areas will not receive local requirements for 2024-
2026
The CPE will receive local requirement for 2024, 2025, and 2026 in PG&E and
SCE’s TAC area
LSEs in SDG&E’s TAC area will receive local requirements for 2024, 2025, and
2026
 
6
 
Central Procurement Entity Implementation
 
LSEs may self-show local resources in PG&E and SCE’s TAC area for 2024,
2025, and 2026 to the CPE.
CPEs make local showing to CPUC on August 18, 2023 with LSEs
attestations
LSEs will receive CAM credits for system and flexible capacity from the
CPE procurement in 2024, 2025, and 2026 by the end of August, 2023.
This credit will be updated in September 2023 for the 2024 final YA
allocation based on the revised load ratio shares.
CPE Annual Compliance Report due September 19, 2023
 
7
 
2024 RA Guide
 
Added Ordering Paragraphs from D.23-06-029
Updated MCC bucket table
Changed PRM to 17%
Removed transmission loss factor and PRM adder for DR
Permits LSEs to update their load migration once in February for May to
December
Updated
 dates 
to
 2024
 
8
 
2024 Local/Flexible Template
 
Removed transmission loss factor adder for DR in the Summary tabs
 
9
 
2024 System Template
 
Changed PRM from 16% to 17% in the Year Ahead Summary and Month Ahead
Summary tab
Removed transmission loss factor adder for DR in the Demand Response tab and PRM
for DR in the 
Year Ahead Summary and Month Ahead Summary tab
Changed the Compliance check in the 
Year Ahead Summary and Month Ahead
Summary tab to be only compliant if both system requirements and 24X7 minimum
requirements are met
 
10
 
2024 Multiyear Capacity Documentation
Summary
 
For LSEs that show local resources in 2024, 2025, and 2026 in the San
Diego/IV local area
 
11
 
Import Checklist Template
 
For LSEs that show specified or unspecified import resources in the MA
filings.
 
12
 
2024 RA Compliance Materials
 
2024 RA Compliance Materials have been posted, including 2024-2026
IOU DR LIP, 2024 YA Initial CAM Lists.
 
Resource Adequacy Compliance Materials (ca.gov)
 
13
 
Upcoming 2023 RA Compliance Timeline
 
Comments on 2024 Draft RA Guide and Templates due August 11, 2023
Final 2024 YA Load Forecast due August 14, 2023
CPE make local showing for 2024-2026 to CPUC, along with LSE attestations
due August 18, 2023
LSEs receive CAM credits for system and flexible capacity procured by the CPE
for 2024-2026 by August 2023 by end of August, 2023
CPE Annual Compliance Report due September 19, 2023
LSEs receive 2024 final YA allocations the week of September 18, 2023
Finalize 2024 RA Guide and Templates the week of September 18, 2023
LSEs’ 2024 YA RA filings due October 31, 2023
CPEs and LSEs that committed to self-show make year-ahead showing to
CAISO by October 31, 2023
 
 
Thank you for attending 2024 RA Guide and Templates
workshop.
Feedback welcome.
 
Hosts contact:
Lily Chow- lily.chow@cpuc.ca.gov
Jaime Gannon – jaimerose.gannon@cpuc.ca.gov
Slide Note
Embed
Share

This workshop by the California Public Utilities Commission aims to guide participants through the 2024 RA compliance process. Attendees are advised on safety measures, how to participate, and are introduced to new features and changes in the RA templates and guide. The agenda covers essential topics such as Central Procurement Entity Implementation, RA Guide modifications, and RA template demonstrations. Participants are reminded to use the Q&A feature for questions and discussions and uphold respectful communication during the session.

  • Workshop
  • California Public Utilities Commission
  • RA Compliance
  • Templates
  • Logistics

Uploaded on Sep 19, 2024 | 1 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. 2024 RA Guide and Templates Workshop August 3, 2023 1:00 p.m. 3:00 p.m. California Public Utilities Commission

  2. Logistics Online only Safety Note surroundings and emergency exits Ergonomic check Audio through computer or phone Toll-free 855-282-6330 or 415-655-0002 Access code: 2494 568 3861 Type password : pdJVw3cdP63 Hosts (Energy Division Staff) Lily Chow Jaime Rose Gannon The workshop is being recorded California Public Utilities Commission

  3. Workshop Logistics All attendees have been muted Panelist that are presenting have been identified and will be identified as panelist when their issue/topic is being addressed To ask questions please use the Q&A function (send "To All Panelists") or raise your hand Questions will be read aloud by staff; attendees may be unmuted to respond to the answer. (Reminder: Mute back!) On the bottom right of screen: click "3 dots" for Q&A Chat Audio Options Participant List Mute/ Unmute California Public Utilities Commission 3

  4. Ground Rules Workshop is structured to facilitate understanding of the 2024 RA compliance process. Keep comments friendly and respectful. Please use Q&A feature only for questions, or technical issues. Do NOT start or respond to sidebar conversations in the Chat. California Public Utilities Commission

  5. Agenda 1:00 pm 1:15 pm Introduction and Overview of Agenda Today s Objective o To demonstrate new features of the RA templates and guide for 2024 compliance year 1:15 pm 1:30 pm - Central Procurement Entity Implementation 1:30 pm 2:00 pm 2024 RA Guide Changes in D.23-06-029 Other Modifications to the RA Guide 2:00 pm 2:30 pm - General Demonstration of RA templates Revised Local and Flexible Template o Changes to the Local and Flexible template - CPE o Practice entering resource into template for both Local and Flexible compliance o Practice verifying compliance o Go through advisory monthly flexible tables Month Ahead Load Forecast Template o Demonstration of entering load migration o Demonstration of how the load migration values flow into the RA System System Template o Changes to the System template o Practice entering load and resource information for both System and Flexible compliance, including CAM/RMR o Practice verifying compliance 2:30 pm 2:45 pm Wrap Up and Next Steps Informal comments due on August 11, 2023 Finalize Guide and Templates late September 2023 Overview of Year Ahead allocation and compliance schedule California Public Utilities Commission 5

  6. Central Procurement Entity Implementation For the 2024 Year Ahead Compliance Process LSEs in PG&E and SCE TAC areas will not receive local requirements for 2024- 2026 The CPE will receive local requirement for 2024, 2025, and 2026 in PG&E and SCE s TAC area LSEs in SDG&E s TAC area will receive local requirements for 2024, 2025, and 2026 California Public Utilities Commission 6

  7. Central Procurement Entity Implementation LSEs may self-show local resources in PG&E and SCE s TAC area for 2024, 2025, and 2026 to the CPE. CPEs make local showing to CPUC on August 18, 2023 with LSEs attestations LSEs will receive CAM credits for system and flexible capacity from the CPE procurement in 2024, 2025, and 2026 by the end of August, 2023. This credit will be updated in September 2023 for the 2024 final YA allocation based on the revised load ratio shares. CPE Annual Compliance Report due September 19, 2023 California Public Utilities Commission 7

  8. 2024 RA Guide Added Ordering Paragraphs from D.23-06-029 Updated MCC bucket table Changed PRM to 17% Removed transmission loss factor and PRM adder for DR Permits LSEs to update their load migration once in February for May to December Updated dates to 2024 California Public Utilities Commission 8

  9. 2024 Local/Flexible Template Removed transmission loss factor adder for DR in the Summary tabs California Public Utilities Commission 9

  10. 2024 System Template Changed PRM from 16% to 17% in the Year Ahead Summary and Month Ahead Summary tab Removed transmission loss factor adder for DR in the Demand Response tab and PRM for DR in the Year Ahead Summary and Month Ahead Summary tab Changed the Compliance check in the Year Ahead Summary and Month Ahead Summary tab to be only compliant if both system requirements and 24X7 minimum requirements are met California Public Utilities Commission 10

  11. 2024 Multiyear Capacity Documentation Summary For LSEs that show local resources in 2024, 2025, and 2026 in the San Diego/IV local area California Public Utilities Commission 11

  12. Import Checklist Template For LSEs that show specified or unspecified import resources in the MA filings. California Public Utilities Commission 12

  13. 2024 RA Compliance Materials 2024 RA Compliance Materials have been posted, including 2024-2026 IOU DR LIP, 2024 YA Initial CAM Lists. Resource Adequacy Compliance Materials (ca.gov) California Public Utilities Commission 13

  14. Upcoming 2023 RA Compliance Timeline Comments on 2024 Draft RA Guide and Templates due August 11, 2023 Final 2024 YA Load Forecast due August 14, 2023 CPE make local showing for 2024-2026 to CPUC, along with LSE attestations due August 18, 2023 LSEs receive CAM credits for system and flexible capacity procured by the CPE for 2024-2026 by August 2023 by end of August, 2023 CPE Annual Compliance Report due September 19, 2023 LSEs receive 2024 final YA allocations the week of September 18, 2023 Finalize 2024 RA Guide and Templates the week of September 18, 2023 LSEs 2024 YA RA filings due October 31, 2023 CPEs and LSEs that committed to self-show make year-ahead showing to CAISO by October 31, 2023 California Public Utilities Commission

  15. Thank you for attending 2024 RA Guide and Templates workshop. Feedback welcome. Hosts contact: Lily Chow- lily.chow@cpuc.ca.gov Jaime Gannon jaimerose.gannon@cpuc.ca.gov California Public Utilities Commission

Related


More Related Content

giItT1WQy@!-/#giItT1WQy@!-/#giItT1WQy@!-/#giItT1WQy@!-/#giItT1WQy@!-/#giItT1WQy@!-/#giItT1WQy@!-/#giItT1WQy@!-/#giItT1WQy@!-/#