Hardware Demonstration and Improvements of the Stellar Positioning System
The Hardware Demonstration and Improvements of the Stellar Positioning System (SPS) involve utilizing ancient celestial navigation techniques for lunar exploration. SPS combines central-body-relative observation with star-field observation to determine absolute position, reducing mass/power impacts
5 views • 14 slides
Improving Heat Rate Efficiency at Illinois Coal-Fired Power Plants
Heat rate improvements at coal-fired power plants in Illinois are crucial for enhancing energy conversion efficiency, reducing carbon intensity, and minimizing pollution. By increasing the heat rate/efficiency by 6%, these plants can generate more electricity while burning the same amount of coal. T
2 views • 11 slides
Improvements for Energy Storage State of Charge Awareness
Updates made to NPRR1186 prior to the RTC+B project aim at enhancing awareness, accounting, and monitoring of Energy Storage Resources (ESRs). ERCOT reviewed and revised constraints related to Ancillary Service awards for ESRs, considering different scenarios. Changes were also implemented to addres
0 views • 35 slides
Public Meeting for S.D. Highway 63 Improvement Project in Dewey County
Public meeting scheduled for Thursday, Jan. 11, 2023, at 5:30 p.m. MST to involve the community in planning and designing improvements for S.D. Highway 63 in Dewey County. The meeting aims to gather input on the proposed project, project limits, background information, traffic data, crash history, h
0 views • 23 slides
Overview of RF Architecture and Waveform Assumptions for NR V2X Intra-Band Operation
In the electronic meeting of 3GPP TSG-RAN-WG4, discussions were held on the RF architecture and waveform assumptions for NR V2X intra-band operation in band n79. Various options and recommendations were presented regarding RF architecture, antenna architecture, and waveform definitions for efficient
1 views • 7 slides
Audit of Ward-based IT Infrastructure at University Hospital of Limerick
In response to a cyber-attack on the HSE in 2021, an audit was conducted at University Hospital of Limerick to assess the accessibility of key healthcare-related computer programs. The audit revealed issues such as JavaScript errors, missing plug-ins, outdated software, and internet access issues. I
0 views • 4 slides
Resource Capacity Accreditation in Forward Capacity Market Discussions
Discussion on the conceptual design for Resource Capacity Accreditation in the Forward Capacity Market, focusing on improvements to accreditation processes to support a reliable transition to clean energy. The presentation outlines methodologies to accredit resource contributions, commitments to pro
0 views • 34 slides
Exploring ZeroMQ: Features, Mismatches, and Improvements
ZeroMQ is a popular asynchronous sockets library used in AI and enterprise applications. This discussion delves into its requirements, identifies mismatches between ZeroMQ and Libfabric, and suggests improvements. It explains ZeroMQ's unique features like multiple connections per socket, async commu
0 views • 42 slides
Evaluating Ideko Acquisition and Growth Strategies
KKP Investments is considering acquiring Ideko Corporation and implementing operational and financial improvements to maximize value. The acquisition price of $150 million seems reasonable based on financial ratios. By focusing on operational enhancements such as cost-cutting, product development, a
0 views • 35 slides
Proposal for Resource Capacity Accreditation in Forward Capacity Market
The ISO-NE has proposed improvements to the accreditation processes in the Forward Capacity Market (FCM) through the Resource Capacity Accreditation (RCA) project. The aim is to enhance the accreditation of resource contributions to ensure reliability during the transition to a cleaner energy mix. T
0 views • 59 slides
Highlights from 3GPP TSG-RAN WG4 Meeting #97-e - November 2020
Various companies presented contributions for AMPR and REFSENS for 35MHz and 45MHz channel bandwidths at the electronic meeting of 3GPP TSG-RAN WG4. Discussions included agreements, issues related to n8, n25, and n71 45MHz REFSENS, UL configurations for different regions and carriers, A-MPR agreemen
0 views • 8 slides
Education and Human Resource Development Statistics August 2018
In August 2018, statistics from the Ministry of Education and Human Resource Development showed improvements in candidate performance for CSEC exams. Overall percentage passing rates increased, with notable improvements in specific subjects and schools. The data also highlighted the distribution of
0 views • 17 slides
Effectiveness of Conflict Resolution Education in Schools
Conflict resolution education plays a crucial role in transforming school environments by reducing violence and promoting win-win outcomes. Various successful programs have shown significant improvements in school settings, such as reduced suspensions and conflicts among students. Conflict resolutio
7 views • 6 slides
Contiguous UL CA Architecture Overview
This document discusses the architecture and capabilities of intra-band contiguous UL carrier aggregation, focusing on issues related to multiple transmit chains, MIMO support, and potential MPR improvements. It also covers topics like ACLR MBW position, inner and outer contiguous allocation definit
4 views • 15 slides
Follow-up on UWB Channel Usage Coordination for Improved Coexistence
This document provides additional details on UWB channel usage coordination to enhance coexistence, interference mitigation, and various improvements in wireless personal area networks. It discusses safeguards for data use cases, interference mitigation techniques, coexistence improvements, backward
0 views • 13 slides
Kingwood Traffic Signals Overview and Updates
Traffic operations in Kingwood, managed by Johana E. Clark, P.E., include signal system improvements and updates. Recent changes involve signal removal studies, new signal installations, and upgrades at key intersections to enhance traffic flow and safety. The system's capacity and daily traffic vol
1 views • 11 slides
Discussion on A-MPR Requirements for PSSCH/PSCCH Transmission in 3GPP TSG-RAN-WG4#95-e Meeting
In the 3GPP TSG-RAN-WG4#95-e meeting, discussions revolved around defining A-MPR requirements for PSSCH/PSCCH transmission for NR V2X UE. The meeting focused on identifying the worst A-MPR values from companies, defining regulatory requirements, and outlining tentative agreements for incorporating n
0 views • 9 slides
Progress Update on NR V2X Working Items in 3GPP Meeting
Discussions in the recent 3GPP TSG-RAN-WG4#95-e Meeting focused on resolving open issues related to NR V2X in TS38.101-1 and TS38.101-3. Key topics included A-MPR decisions, RF requirements specification, and general part considerations. The meeting aimed to finalize the NR V2X WI for ITU submission
0 views • 10 slides
SAGE Compliance Improvements Release 2 Update Summary
May 10th, 2018 marked the launch of the SAGE Compliance Improvements Release 2 Update, led by Chris Carlson, Technology Project Manager at ORIS. The update aimed to enhance compliance clarity and workflow efficiency by revising questions, providing direct access to the Non-Fiscal Compliance page for
0 views • 11 slides
Green Energy Money $aver (GEM$) Financing Programs in Hawaii
Green Energy Money $aver (GEM$) offers innovative financing programs for residential and commercial properties in Hawaii, allowing homeowners and renters to access energy improvements with no upfront costs and immediate bill savings. Participants need to meet eligibility criteria based on utility bi
0 views • 17 slides
Analysis of Florida Keys Canal Remediation Diel Results
The analysis focuses on the diel results of a canal remediation project in the Florida Keys as of 11/01/2016. It includes measurements of %DO saturation above 42% and the average %DO saturation over a full day, with data points on control and remediated surfaces. Significant improvements are observe
0 views • 18 slides
Enhancing State Assessments in New Jersey: Training, Security, and Improvements
The New Jersey Department of Education focuses on providing equitable access to high-quality education for its 1.4 million students through rigorous state assessment programs. District Test Coordinators play a crucial role in ensuring proper training, security measures, and data accuracy. The assess
0 views • 108 slides
WOU Summer Projects 2019: Capital Improvements and Allocation Breakdown
The WOU Board of Trustees' Finance & Administration Committee oversees significant summer projects for 2019, including capital improvements in HVAC, asphalt, sidewalks, boiler modifications, roofs, elevators, and more. The detailed breakdown shows the allocation percentages for each project, reveali
0 views • 5 slides
Sitka Sawmill Creek Road Resurfacing and Pedestrian Improvements Project
Alaska DOT&PF is working on the Sitka Sawmill Creek Road Resurfacing and Pedestrian Improvements Project to enhance the road infrastructure. The project includes reconstructing pavement, redesigning intersections, installing a new storm drain system, and improving pedestrian facilities. Proposed opt
0 views • 19 slides
New Features in Silverlight 5 by Jeff Prosise
Explore the latest enhancements in Silverlight 5, including text improvements, character spacing control, media enhancements like low-latency sound and variable-rate playback, as well as threading improvements. Learn about RichTextBoxOverflow, enhanced OpenType support, hardware decoding of H.264 vi
0 views • 47 slides
ATF Facility Updates and Enhancements Meeting Summary
Updates and improvements at the ATF Facility as discussed in a meeting include re-polishing of gun cathode, enhanced vacuum systems, reconfiguration of the experimental hall, improvements in beamlines for LWFA and ICS experiments, and new shielding configurations. Beamline enhancements allow for bet
0 views • 16 slides
2022 Street and Utility Improvements Project Overview
The 2022 Street and Utility Improvements Project involves various enhancements in infrastructure, including street improvements, pedestrian facilities, arena drop-off, water system upgrades, and sanitary sewer replacements. The project background covers the planning process, data collection, and con
0 views • 19 slides
Requirements for S-SSB Transmission in 3GPP NR Working Group Meeting
This document discusses MPR and A-MPR requirements for S-SSB transmission in the 3GPP NR Working Group Meeting, covering proposals, specifications, and tables on allowed MPR levels for S-SSB in various scenarios. It also outlines the definition and compromise of MPR based on different options, along
0 views • 6 slides
Exploring Home Energy Improvements and Smart Technology for Energy Efficiency
Discover how home improvements and energy technology can significantly reduce energy bills. Join the Smart Home Energy Improvements Workshop in Zero Carbon Rugeley to explore approaches for sustainable energy production and usage at home. Learn about retrofitting, smart energy systems, and meet char
0 views • 20 slides
Community Feedback on Proposed Active Travel Improvements in Hill Lane
Community feedback was gathered regarding proposed active travel improvements in Hill Lane, including segregated on-road cycle lanes and new zebra crossing points. The majority of respondents expressed support for the initiatives, citing increased safety, encouragement for more cycling and walking,
0 views • 29 slides
Understanding Marketing Public Relations (MPR) in Environmental Communication
Explore the intersection of marketing strategies with public relations in environmental communication. Learn how MPR builds organization identity, shapes public opinion, and maintains a positive image through effective communication strategies. Discover the basic rules of MPR for maximum impact and
0 views • 6 slides
Elevator Modernization Program and Capital Improvements in Permanent Supportive Housing
The Elevator Modernization Program (EMP) and Capital Improvements initiative aims to address unreliable and antiquated elevators in privately owned Permanent Supportive Housing (PSH) buildings. With total funds available and a maximum award amount specified, the program has eligibility requirements
0 views • 9 slides
NR V2X Working Group Meeting Summary
Companies participating in the 3GPP.TSG-RAN.WG4#95-e meeting discussed open issues related to NR V2X features for ITU submission. Key topics included RF requirements, A-MPR decisions, and resolving technical challenges. The meeting aimed to address remaining issues in TS38.101-1 and TS38.101-3 to fi
0 views • 10 slides
3GPP TSG-RAN WG4 #99-e Meeting Document Summary
Approval agenda items discussed in the 3GPP TSG-RAN WG4 #99-e meeting included enhancements for UL gap for FR2, issues related to Tx power management, recommendations on RAN configurations, and coherent UL MIMO. The documents and images shared highlight key agreements and discussions on various topi
0 views • 7 slides
Evolution of UL Tx Power Management in 3GPP Standards
The document discusses enhancements in UL Tx power management for FR2 spectrum bands, focusing on gap calibration prioritization, P-MPR reporting for BPS-based management, and RRM aspects of UL gap configurations. The agreements and decisions made by RAN4 are outlined, along with considerations for
0 views • 7 slides
Regulatory Requirements in TS38.101-2 and Impact on RAN4 Specifications
Common understanding of the regulatory requirements outlined in TS38.101-2 for bands n258, n257, n260, and n259, including issues related to NS values, A-MPR, connectivity, and transitional periods. Agreements and solutions discussed in RAN4#94-e-bis meeting to address NS mapping, A-MPR issues, and
0 views • 10 slides
ICAO SIP 2012 - ASBU Workshops Overview
The ICAO SIP 2012 - ASBU Workshops focused on operational improvements in global air navigation systems to address environmental concerns, including noise and emissions. Assembly resolutions outlined goals for fuel efficiency improvements and requested the development of tools for assessing benefits
0 views • 18 slides
Improvements to Stockton Street and Joseph Street in Hightstown
The public outreach meeting held on March 6, 2017, in Hightstown discussed the improvements planned for Stockton Street and Joseph Street. The project, funded through the Safe Routes to School Infrastructure Program, aims to enhance safety and accessibility for pedestrians and cyclists, especially s
0 views • 8 slides
Advancements in Volumetric Presentation State Standardization
The Supplement 190 defines the second Volumetric Presentation State (VPS) IOD, enhancing volume rendering specifications and leveraging concepts from Planar MPR VPS. Public comments are solicited to ensure the draft standard meets industry needs. The scope of VPS, layout considerations, the importan
0 views • 41 slides
Industry Performance Rejection Analysis Summary
This update provides a detailed analysis of read rejections related to PAC actions from July 2020. It includes information on rejections analyzed, comparisons made against different tolerance levels, AQ Corrections Reporting, unique MPRs, and top rejection trends by shippers. The summary also highli
0 views • 5 slides