Overview of PIP-II Partnership and Mission
PIP-II is a partnership involving various international institutions such as US-DOE, India-DAE, Italy-INFN, UK-STFC-UKRI, France-CEA, and more. The mission of PIP-II is to upgrade Fermilab's accelerator complex to enable the world's most intense beam of neutrinos and sustain a broad physics program
0 views • 18 slides
Enhancing Project Management for General Plant Projects at Fermilab
Improving documentation flow and eliminating bottlenecks in general plant projects at Fermilab can lead to successful project execution, enhancing credibility, reputation, and access to future funding. The Infrastructure Service Division (ISD) plays a crucial role in efficiently managing real and pe
1 views • 15 slides
Exploring Dark Sector Particles at Fermilab PIP-II and Beyond
The DAMSA experiment at Fermilab PIP-II aims to search for Dark Sector Particles (DSP) using a high-intensity proton beam facility. By focusing on Axion-like particles and employing specific physics strategies, DAMSA seeks to penetrate the low mass regime and discover rare particles in unexplored ki
6 views • 22 slides
A Concurrency Framework for Priority-Aware Intercomponent Requests in CAmkES on seL4
This research work proposes a concurrency framework designed to handle priority-based intercomponent requests efficiently in CAmkES on seL4. The framework supports reentrant execution, locked critical sections over shared state using IPCP, NPCS, and PIP protocols. It requires minimal changes to comp
0 views • 8 slides
Managing Python Virtual Environments on WRDS
Understanding and creating virtual environments on WHARTON RESEARCH DATA SERVICES (WRDS) allows users to isolate Python packages for different projects, ensuring compatibility and preventing conflicts. This guide covers creating, activating, deactivating, and using pip to install Python packages wit
0 views • 13 slides
Understanding Personal Independence Payment (PIP) and Welfare Benefits
Personal Independence Payment (PIP) is a crucial support for individuals with health conditions or disabilities. This article delves into the components, eligibility criteria, assessment process, and claimant journey of PIP, shedding light on the valuable welfare benefits and additional support avai
0 views • 20 slides
Employee Assistance Program at Fermilab
Fermilab's Employee/Users Assistance Program offers comprehensive online, telephone, and virtual services for employees, household members, and users at the lab. Services include counseling, legal and financial consultations, work/life referrals, and new offerings like life coaching and personal ass
0 views • 5 slides
Initiating and Planning Systems Development Projects
The lecture covers the key steps involved in initiating and planning systems development projects, such as assessing project feasibility, building project plans, and structured walkthroughs. It delves into the decision-making process between project initiation and planning, the effort required for t
2 views • 56 slides
Understanding Society and Culture through Personal Interest Projects
Explore the significance of Personal Interest Projects (PIPs) in the HSC curriculum, focusing on research skills development, independent learning, and cross-cultural perspectives. Discover the steps involved in creating a fantastic PIP, from topic selection to project completion, and understand the
0 views • 13 slides
European Patients Academy on Therapeutic Innovation: Paediatric Investigation Plan (PIP)
The Paediatric Investigation Plan (PIP) is essential in ensuring the quality, safety, and efficacy of medicine development for children. It involves meticulous planning to ethically and scientifically gather necessary data for a medicine's use in children. The PIP covers various aspects, such as the
0 views • 18 slides
HR Updates - Remote Work Policy Overview
This HR update discusses the Remote Work Policy at Fermilab, outlining the procedures and requirements for employees to work remotely, including regular and occasional telecommuting. It also addresses long-distance telework approvals and highlights precautions against fraudulent unemployment claims
0 views • 6 slides
Analysis and Decision-Making for MEBT Kicker Technology in PIP-II Project
The final design and procurement readiness review for the PIP-II MEBT kickers involved evaluating alternatives, costs, and schedules, with a focus on 200-Ohm kicker technology. Developments in kicker design, testing, and decision-making points, such as choosing the 200-Ohm system over the 50-Ohm con
0 views • 13 slides
Slow Extraction Operations at Fermilab Main Injector
Overview of slow extraction operations at Fermilab Main Injector, covering beam transport, low to medium energy user test beams, Drell-Yan experimental beam, and spill procedures. Details on beam targets, production, and observation of high-energy positrons. Also, insights on spill regulation techni
0 views • 12 slides
Planning for Independence Program (PIP) - Empowering Students for Success
Our Planning for Independence Program (PIP) offers a 7-year alternative program to students with Intellectual Developmental Exceptionality. Through individualized education programs, students develop necessary skills for independence, including transit training, social skills, literacy, and numeracy
0 views • 9 slides
Overview of Fermilab's Tevatron Accelerator Facility
The Fermilab Tevatron was once a powerful particle accelerator in the US, known for significant discoveries such as the Top Quark. Currently, the Tevatron is effectively mothballed for safety reasons, with measures taken to secure the facility. This includes removing cryogens, disconnecting power su
0 views • 7 slides
Transformation and Conflict in Great Expectations
Pip's journey from an orphan living with his sister and her husband to a young man yearning for gentility and love is marked by evolving relationships with characters like Joe, Miss Havisham, and Estella, challenging his perceptions and ambitions. Dickens weaves a narrative exploring themes of socia
0 views • 11 slides
Understanding Personal Injury Protection (PIP) Coverage in Pennsylvania
In Pennsylvania, individuals involved in accidents must seek medical care within 14 days to be eligible for PIP coverage. Receiving initial treatment from various healthcare professionals is crucial, and follow-up care must align with the initial diagnosis. The presence or absence of an Emergency Me
0 views • 31 slides
Understanding PIP Benefits and Medical Care Requirements
In order to receive PIP benefits after a motor vehicle accident, seeking initial services within 14 days is crucial. This care may be provided by specific healthcare providers and facilities, and failure to do so can result in forfeiture of benefits. Referrals and treatment consistency play signific
0 views • 31 slides
Enhancing Particle Acceleration in Booster with Permanent Magnet Accumulator Ring
A permanent magnet accumulator ring could revolutionize the Booster facility, benefiting PIP-II/DUNE programs and advancing FNAL toward a large-scale DS program. By integrating the new 1 GeV line within the existing Booster to BNB enclosure, costs and timelines are significantly reduced. The proposa
1 views • 4 slides
Financial Overview of Fermilab - Insights from Fiscal Year 2015
Fermilab, operated by Fermi Research Alliance LLC, receives over 99% of its funding from the Federal Government, mainly through the Office of High Energy Physics. The FY2015 financial results show total revenue of $382,272,583 with expenses covering various categories like salaries, subcontracts, an
0 views • 7 slides
Development of 650 MHz RF Power Systems for PIP-II Linac
The project involves designing and fabricating 325 MHz and 650 MHz RF power systems for PIP-II Linac. Various milestones, including the development of 40 kW RF systems, testing prototypes, and collaboration between RRCAT and Fermilab, are outlined. The high-level goal is to achieve specific power le
0 views • 16 slides
Journey of Pip in "Great Expectations
Pip's journey in "Great Expectations" takes him from helping a convict and being granted a fortune to becoming a snobbish gentleman chasing after the unattainable Estella. However, a revelation about his mysterious benefactor and the loss of his wealth lead him to reassess his values. Through strugg
0 views • 20 slides
Collaboration Between Indian Institutions and Fermilab for Magnet Production
Collaboration between Indian institutions and Fermilab for the production of various magnets for the Medium Energy Beam Transport line, including warm and superconducting magnets. Updates on the progress, deliverables, recommendations for series production, and key milestones discussed during the 1s
0 views • 12 slides
Novel Clean Assembly Techniques and In-Situ Mitigation Processes at TTC2023 Fermilab
Explore innovative clean assembly techniques, in-situ mitigation strategies, and recovery processes at the TTC2023 Fermilab event, focusing on preventing dust particle contaminations, maintaining on-line performance, understanding field emissions, and mitigating contaminations in cavities and cryomo
0 views • 4 slides
Risk Assessment of Rotating Coil System at Fermilab
This document provides a comprehensive risk assessment of the rotating coil system at Fermilab, outlining risks associated with design, operation, cable spooler, probe motion system, and software development. It discusses hardware components, measurement systems, backup plans, and safety measures fo
0 views • 7 slides
Evolution of ESH&Q Organization at Fermilab
The ESH&Q organization at Fermilab, led by Chief Safety Officer Martha Michels, has undergone evolution to establish clear roles, efficient processes, and sustainable programs. With a focus on lower costs and enhanced programs, the organization has centralized its operations and set strategic goals
0 views • 14 slides
Evolution of ESH&Q at Fermilab: A Comprehensive Overview
Discover the evolution of Environment, Safety, Health, and Quality (ESH&Q) practices at Fermilab under the leadership of John Anderson Jr. Learn about the establishment of clear goals, roles, and responsibilities, the implementation of efficient processes, and the development of sustainable programs
0 views • 14 slides
Evolution of RCS Design and Upgrade Process at Fermilab
The Fermilab accelerators have undergone significant upgrades over the years, with developments such as the 2 GeV Linac, RCS design improvements, and the Snowmass 2.4 MW upgrade with RCS. Key advancements include enhanced beam intensity, better orbit control, and reliability. Various parameter varia
0 views • 32 slides
Workshop on Maintaining PIP-II within the Accelerator Complex - Operational Requirements and Interfaces
This workshop, held on July 15, 2021, focuses on maintaining the PIP-II within the Accelerator Complex through discussions on uptime, availability, maintainability, and operability requirements. The event covers various presentations on system interfaces, maintenance strategies, and operational expe
0 views • 4 slides
Overview of Mu2e Slow Extraction Workshop at Fermilab by Vladimir Nagaslaev
This content discusses the Mu2e project at Fermilab, focusing on slow extraction techniques for beam delivery. It covers beam facilities, characteristics of Muon Campus, design requirements, beam losses, new MARS simulations, and losses in the extraction beam line. Details include beam kinetics, spi
0 views • 17 slides
Future Prospects in Dark Matter Research at Fermilab
Exploring new avenues in the realm of dark matter research, Fermilab stands at the forefront with potential upgrades to their detectors, such as the LZ and PICO-X. The presentation delves into the scientific criteria influencing the choice of detectors, the pursuit of understanding dark matter and d
0 views • 6 slides
Evaluation of Linux Distribution Options by CERN and Fermilab
CERN and Fermilab are evaluating Linux distribution options and have decided to target CentOS Stream 8 as the standard distribution for experiments. Red Hat has proposed an academic licensing scheme, but concerns exist about its applicability. CentOS Stream 8 is considered low risk and has been runn
0 views • 6 slides
Snowmass 2022 Meeting - PIP-II Accumulator Ring (PAR)
Snowmass 2022 Meeting presentation discusses an opportunity for a storage ring utilizing PIP-II capabilities to support DUNE power ramp up and FNAL physics program. The talk outlines the potential benefits and implications of this proposal in the field of particle physics.
0 views • 25 slides
Strategic Planning Process at Fermilab: Overview and Goals
Strategic planning at Fermilab involves aligning with the P5 plan for the U.S. particle physics community, engaging more people in the process, and communicating lab strategies effectively. The plan focuses on six key themes, including Neutrino Science, with specific goals and objectives to support
0 views • 20 slides
Understanding Access Changes and Community Relations at Fermilab
Access to Fermilab has become more complicated due to changing DOE guidance and security posture. Efforts are being made to streamline access while addressing security gaps. Public access to outdoor areas of the Fermilab campus is still encouraged, but communication regarding access changes needs im
0 views • 12 slides
PIP-II High Power RF Distribution System Overview
The PIP-II High Power RF Distribution System is a collaborative project involving various countries and institutions to develop a sophisticated system capable of efficiently distributing RF power to superconducting cavities. The system consists of multiple distribution lines and components designed
0 views • 28 slides
Troubleshooting CM02 Cold Gate Valves at Fermilab
Issues have arisen with the CM02 cold gate valves at Fermilab, affecting the operation and reliability of the valves. Problems include leakage, improper sealing, and unexpected pressure differentials during installation, leading to the introduction of gases into the cavity string. Detailed descripti
0 views • 8 slides
Workforce Services Support at Fermilab
Workforce Services at Fermilab provide comprehensive support to users, assisting with ID badge requests, computing privileges, visa information, and more. They offer guidance on lab procedures, local resources, and communication channels through designated points of contact. The Visa Office aids wit
0 views • 9 slides
Activation Products Analysis at Fermilab Main Injector
Explore the study on activation products from copper and steel samples exposed to showers produced by 8 GeV protons at Fermilab Main Injector Collimation System. Delve into radiation issues, maintenance planning, and fitting formulas to analyze residual radiation using half-life weighted beam loss.
0 views • 22 slides
Boosting Beam Power in the PIP-II Era: A Comprehensive Overview
Detailed analysis of upgrading injection parameters in the PIP-II era, discussing existing and future booster injection techniques, beam losses, operational parameters, physical layout, current geometry, ideal design features, and options for new design chicane geometry.
0 views • 22 slides