Ferc requirements - PowerPoint PPT Presentation


INDIAN ARMY AGNIVEER MEDICAL REQUIREMENTS

INDIAN ARMY AGNIVEER MEDICAL REQUIREMENTS#indianarmy #AgniveerMedicalRequirements#trending\n\nLooking to join the Indian Army? Look no further than the Agniveer medical requirements provided by Manasa Defence Academy. With years of experience in providing the best training, Manasa Defence Academy en

2 views • 1 slides


IBRWG Meeting Update: FERC Order 901 Standards Prioritization

Detailed progress update on FERC Order 901 standards prioritization, NERC milestones, and high-priority projects. Includes response milestones, meeting outcomes, and completion projections. Stay informed on critical industry developments.

1 views • 7 slides



MRES Transmission Update: Projects, Rates, and Regulatory Changes - August 25, 2023

Explore the latest updates on MRES transmission projects, rate adjustments, and regulatory developments discussed during the meeting on August 25, 2023. Details include MRES member rate information, specific rate adjustments for MMU and WMU, transmission project energization, true-up information, an

1 views • 15 slides


Comprehensive Guide to FERC Order 676j Managed Encumbrance Process

This comprehensive guide provides step-by-step instructions on managing encumbrances under FERC Order 676j. Learn about creating new encumbrances, untagged pseudo-ties using PTP or NITS TSR, and accessing dynamic notifications within the system. Detailed images and clear explanations make this guide

1 views • 25 slides


Writing Effective Technical Requirements for Product Development

Understanding the importance of technical requirements is crucial for successful product development. This guide covers why requirements are needed, the types of requirements, how to formulate them effectively, and the benefits of having clear requirements throughout the development process. By foll

4 views • 30 slides


MRES Transmission Project Updates and Regulatory Overview

John Weber, Senior Transmission Engineer, presents key updates on MRES transmission projects, including the energization of the Lorain Substation and recent restoration efforts post-tornado strike at Elbow Lake Substation. The meeting agenda covers MRES member rate information, regulatory changes, a

1 views • 15 slides


Overview of PED Compliance Requirements for RFD Crab Cavities Fabrication at FNAL

The process of ensuring PED compliance for RFD crab cavities fabricated by FNAL involves a review of EN and ASME Codes, with additional requirements set by CERN HSE. A formal agreement is being finalized, with a document defining essential safety requirements, risk assessment, and more. Additional r

5 views • 13 slides


Federal Energy Regulatory Commission Transmission Update - Nov. 3, 2023

FERC, led by Director Rob Thormeyer, regulates natural gas wholesale facilities, interstate pipelines, onshore LNG facilities, wholesale electric market rates, and more. The Commission consists of five appointed Commissioners overseeing key initiatives like transmission planning proposals and interc

0 views • 14 slides


Software Requirement Analysis and Documentation Process

The requirement analysis and specification process involves gathering information from customers, identifying the problem, solutions, data requirements, complexities, and potential interfaces. Key components of a Software Requirements Specification (SRS) document include functional requirements, non

0 views • 23 slides


Improvements to Generator Interconnection Procedures: ISO New England Response

FERC's Notice of Proposed Rulemaking seeks to enhance generator interconnection procedures to address queue backlogs and promote fairness. ISO New England outlines expansive changes, including a first-ready, first-served process, and discusses trade-offs in project viability and completion expectati

0 views • 36 slides


FERC Order No. 841 Compliance Details for Electric Storage Participation in Markets

The content discusses FERC Order No. 841 compliance requirements for electric storage resources in RTO/ISO markets. It covers the additional compliance requirements, such as metering rules, retail service provision, transmission charges, and market participation rules. ISO New England's proposed res

0 views • 15 slides


Understanding Software Requirements and Design Principles

Software requirements play a crucial role in defining what a system should do, while the design describes how it achieves those goals. This lecture series covers the concepts of user and system requirements, techniques for describing system requirements, organizing software requirements in a documen

1 views • 30 slides


Incorporating Solar Assets into Do-Not-Exceed Dispatch: Project Update

This update covers the approval and timeline of incorporating solar assets into the Do-Not-Exceed (DNE) dispatch by ISO New England. The NEPOOL Participants Committee approved the project on September 1, 2022. Tariff changes were filed with FERC on November 30, 2022, and were accepted with an effect

1 views • 10 slides


Understanding Requirements Determination in Systems Development

The process of requirements determination is crucial in transforming existing systems into proposed ones, with changes easily made in this stage. It involves converting high-level business requirements into detailed ones, including functional and non-functional types, which define the scope of the s

0 views • 13 slides


Way Forward on Ultra-Low BLER Requirements and Open Issues Discussion

Discussions have been held regarding ultra-low BLER requirements for UE and BS, with agreements reached in the first and second rounds. Extra margin considerations and test requirements were emphasized, along with proposals for CQI reporting and FR2 requirements. Open issues include CQI requirements

3 views • 9 slides


Updates on Generator Interconnection Procedures and Agreements Reform

ISO-NE is implementing further compliance reforms in response to FERC Order No. 845 regarding Generator Interconnection Procedures and Agreements. This includes proposed tariff language updates and discussions on surplus interconnection services. The changes aim to enhance the efficiency and effecti

0 views • 14 slides


Insights on Distributed Energy Resources and FERC Order 2222

Understand the growth of Distributed Energy Resources (DERs) and the impact of FERC Order 2222 on electricity systems. Explore drivers of customer adoption, benefits, challenges, and the role of DERs in decarbonization and resilience. Gain valuable insights into the evolving landscape of energy gene

0 views • 22 slides


FERC Order 844 Compliance: Uplift Cost Allocation and Transparency

FERC Order 844, issued in April 2018, mandates reporting on uplift payments and unit commitments, along with revising tariff language for compliance. ISO-NE is proposing new reports and tariff revisions to adhere to the Order, enhancing transparency in operational practices. The Order aims to improv

1 views • 30 slides


Update on Transmission System Performance Standard TPL-007-1 for Geomagnetic Disturbance Events

The status update covers the evolution of Reliability Standard TPL-007-1, focusing on the approval process, modifications required by FERC, and directives for NERC to enhance the standard. TPL-007-1 aims to assess vulnerability to geomagnetic disturbances and mandates corrective actions for non-comp

1 views • 11 slides


Project 2009-01 Event Reporting Updates

The Project 2009-01 Event Reporting process underwent revisions to address industry comments and incorporate FERC directives. Changes included updating reporting standards, addressing double jeopardy concerns, and aligning with FERC Order 706. Despite multiple comment rounds, challenges such as conf

0 views • 19 slides


gNB Positioning Measurement Requirements Discussion at 3GPP TSG-RAN WG4 Meeting

Discussion at the 3GPP TSG-RAN WG4 meeting #98bis-e focused on gNB positioning measurement requirements, including beam sweeping, gNB accuracy requirements, samples for gNB accuracy, RoAoA side conditions, and SRS-RSRP measurement accuracy requirements. The meeting addressed various candidate option

1 views • 14 slides


Rochester Public Utilities Presentation on True-up of Attachment O Transmission Revenue Requirements

Rochester Public Utilities (RPU) holds annual meetings to discuss and provide information on the calculation of the True-up of RPU's 2016 Annual Transmission Revenue Requirements. The presentation also covers the True-up Adjustment applied to the 2018 Forward-Looking Rate. RPU uses a FERC-approved F

0 views • 14 slides


Safety Measures at Alaska LNG Liquefaction Facility

This document highlights the safety procedures and measures implemented at the Alaska LNG Liquefaction Facility and Marine Terminal. It covers topics such as hazard analysis, emergency response plans, flares, noise, seismic design, and more. The facility overview includes details on the modularized

2 views • 50 slides


State Implications of FERC Order 2222: Overview and Actions

This content delves into the state implications and actions stemming from FERC Order 2222, focusing on RTO/ISO stakeholder engagement, development of tariffs, coordination frameworks, interconnection rules, data sharing requirements, dispute resolution, and more. It outlines the key roles states pla

0 views • 11 slides


Energy Regulatory Conference Highlights and Updates 2013

The MEPAV 2013 Conference report discusses key issues like demand response, renewable generation, and transmission planning at FERC. Updates on FERC commissioners, new DOE appointees, and challenges like Court Appeals of Order No. 1000 are included, shedding light on important regulatory matters in

0 views • 46 slides


Technical Integration Meeting: DUNE Requirements Overview

Detailed overview of proposed changes and requirements discussed in a technical integration meeting for the DUNE project. The meeting covered outlined changes to owned requirements, proposed alterations to TDR requirements, and consortia requirements. Specific details include changes to EB requireme

1 views • 12 slides


Great River Energy 2013 Annual True-Up Meeting Summary

The Great River Energy 2013 Annual True-Up Meeting held on August 7, 2014, aimed to discuss the Regulatory Timeline, compare actual 2013 values to projections, review the Annual True-Up results, and address next steps. The meeting centered around the revised Formula Rate Protocols and the Annual Tru

1 views • 16 slides


Report on ISO/RTO Governance & Practices in FERC Jurisdiction

A recent report on the governance and practices of six ISOs/RTOs under FERC jurisdiction - CAISO, ISO-NE, NYISO, MISO, PJM, and SPP - compares stakeholder structures, Section 205 filing rights, board structures, and roles of state utility commissions. The report details stakeholder processes, board

0 views • 9 slides


HiLumi-LHC MQXF Conceptual Specifications and Requirements Overview

The HiLumi-LHC project collaborated with various institutions to develop conceptual specifications and requirements for the MQXF, with contributions from experts in the field. The project focused on design study and received funding from the European Commission and the US LHC Accelerator Research Pr

0 views • 11 slides


NAESB 2021 API-7 Standards for Battery and DER Kickoff Meeting Overview

Overview of the kickoff meeting discussing the development of NAESB 2021 API-7 standards to support battery and distributed energy resources. The meeting emphasized consensus-based standards development following the ANSI SDO process. Key topics included mission objectives, industry guidance, and fo

0 views • 15 slides


FERC Update and Key Developments in Energy Regulation

Highlights from the FERC Update meeting at the NASUCA Mid-Year Meeting in Portland, covering topics such as base returns on equity, transmission rate incentives, and natural gas act reform. Discusses FERC opinions, recent court rulings, and ongoing regulatory inquiries related to determining and adj

0 views • 9 slides


FERC Update: National Association of State Utility Consumer Advocates Annual Meeting Highlights

Highlighting key discussions and updates from the FERC Update at the National Association of State Utility Consumer Advocates Annual Meeting in Louisville, Kentucky, including new FERC lineup, regulatory worldviews, policy initiatives, and ongoing proceedings like Docket No. RM21-17.

0 views • 8 slides


Transmission Engineer Meeting Summary - August 23, 2024

John Weber, Senior Transmission Engineer, led a meeting discussing MRES true-up for 2023 historical rate information, regulatory changes, and transmission projects. The meeting covered MRES member rate information and highlighted MRES transmission facilities, FERC background, and recent projects inc

0 views • 15 slides


SMMPA Annual Meeting Transmission Rate Update 2018

SMMPA, a not-for-profit political subdivision in Minnesota, updated its transmission rate formula in August 2018. The Attachment O timeline outlines crucial dates for stakeholders, including the annual meeting on formula rate updates. SMMPA, as a Transmission Owner in MISO, follows FERC-approved tem

0 views • 8 slides


Rochester Public Utilities - Forward-Looking Transmission Revenue Update

Rochester Public Utilities (RPU) presents an update on the forward-looking transmission revenue requirements for calendar year 2021. The presentation covers the regulatory background, rate calculations, and adjustments for the upcoming year. Key topics include the FERC-approved formula rate, true-up

0 views • 13 slides


Transmission Engineer Meeting Agenda for MRES, MMU, and WMU - October 27, 2023

John Weber, Senior Transmission Engineer, leads a meeting discussing regulatory changes, specific rate information for MRES, MMU, and WMU in 2024, true-up details on attachments, and incorporation of 2024 FLTYs into rates effective January 1, 2024. The meeting also covers the background of MRES, FER

0 views • 14 slides


Transmission Services Meeting Overview

Manager of Transmission Services, Terry Wolf, leads a meeting discussing MRES profile, true-up for 2015, member rate information, regulatory changes, and transmission projects. The meeting covers important details such as member served, generation capacity, renewable energy sources, FERC background,

0 views • 14 slides


Great River Energy 2015 Annual Projected Rate Meeting Details

Great River Energy held its annual projected rate meeting on October 31, 2014, to discuss the projected net revenue requirement and associated network rate for 2015. The meeting included disclosures, a corporate profile overview, Attachment O details, and forward rate requirements. FERC requirements

0 views • 22 slides


FERC Update Mid-Year Meeting Highlights - Indianapolis 2022

Highlights from the FERC Update Mid-Year Meeting in Indianapolis, showcasing updates on Return on Equity, Cost Allocation, Transmission NOPR, and Generator Interconnection Planning. Important discussions on ROE methodology, MISO Appeals, Cost Allocation Proposals, and Long-Term Regional Transmission

0 views • 12 slides


SMMPA Annual Meeting - Transmission Rate Update Summary

SMMPA, a not-for-profit serving Minnesota municipal utilities, provides power through its transmission assets. The organization annually establishes rates for open access use of its assets. The Attachment O historical template, approved by FERC, utilizes data from EIA 412 for this purpose. Key dates

0 views • 8 slides