NERC IBR Alert Summary
NERC IBR Alert Summary highlights the issued Level 2 Alert pertaining to disturbances in BES-connected solar PV resources, focusing on data collection for possible BPS performance risks. The summary also covers insights on ERCOT Region inverter manufacturers, fault ride-through behavior, and phase p
0 views • 17 slides
Boston Public Schools Autonomous Schools Overview
Boston Public Schools (BPS) offer various autonomous schools, including Innovation Schools, Pilot Schools, Turnaround Schools, and Horace Mann Charter Schools. The 2015-16 school year saw an increase in overall enrollment in autonomous schools, with 32% of BPS students attending them. Families are m
1 views • 16 slides
Redispatch Cost Posting for Third-Party Planning Offers
Requirement to modify OASIS for posting third-party offers for planning redispatch services without obligation to incorporate bids. BPS to determine information to be posted, including Generating Unit(s) Identification, Capacity over time, Flowgate(s) congestion relief, Cost, and more. OASIS subcomm
0 views • 10 slides
Business Practices Subcommittee Update and Status Overview
The Business Practices Subcommittee (BPS) provides an update on its recent activities, including meetings, drafts of standards, and proposed solutions. The subcommittee focuses on Parallel Flow Visualization, Draft Standards, and addressing Annual Plan Items related to transmission loading relief. T
0 views • 22 slides
Confirmation Levels Working Example for BPS Discussion
This detailed content discusses levels of confirmation and working examples for business process discussion. It covers topics such as confirmation points of view, upstream and downstream pipes, base examples with sample data, and the interaction between parties in the confirmation process. The conte
0 views • 19 slides
Analysis of Consumer and User Satisfaction Surveys in Indonesia
This report analyzes consumer and user satisfaction surveys conducted by BPS-Statistics Indonesia, focusing on data segmentation, satisfaction levels, and recommendations for data and services improvement. The surveys cover a wide range of institutions and provide valuable insights into the changing
0 views • 13 slides
Confirmation Levels and Data Examples for BPS Discussion
This content provides detailed information on levels of confirmation and working examples for discussions related to Business Process Solutions (BPS). It includes examples of base data sets, upstream and downstream pipe locations, and parties involved in the confirmation process. The explanation cov
0 views • 19 slides
Improving Behavioral Health and Developmental Disabilities Outcomes Conference Summary
The focus of the conference was on new indicators introduced in Q3 2020, such as time to completion of BPS, time to first service SUD, and time to completion of BPS to first service. The need for revising indicators was highlighted to enhance performance measurement and quality improvement, aligning
0 views • 25 slides
Evolution of UL Tx Power Management in 3GPP Standards
The document discusses enhancements in UL Tx power management for FR2 spectrum bands, focusing on gap calibration prioritization, P-MPR reporting for BPS-based management, and RRM aspects of UL gap configurations. The agreements and decisions made by RAN4 are outlined, along with considerations for
0 views • 7 slides
Highlights from ECC Academic Senate Meeting - October 18th, 2016
The ECC Academic Senate Meeting on October 18th, 2016 covered various agenda items such as welcoming a new member, discussions on the development and revision of BPs and APs, and reviews of Educational Policies including Administrative Procedure 5070 and more. The meeting also focused on the Educati
0 views • 21 slides
Enhancing Grid Resilience through Generator Ride-Through Standards
This project, led by Xiaoyu (Shawn) Wang and Husam Al-Hadidi, aims to modify PRC-024 and PRC-029 standards to improve reliability and resilience in the power generation sector. The revisions focus on addressing performance issues with generating resources during disturbances, such as solar PV, wind,
0 views • 19 slides