Supplemental Signs and Costs in Minnesota: A Guide

Slide Note
Embed
Share

Explore the guidelines and costs associated with supplemental signs in Minnesota, including information on sign clutter, funding responsibilities, signing programs, and relevant manuals. Learn about MnDOT's criteria for selecting and installing signs based on roadway type, facility characteristics, visibility considerations, and more.


Uploaded on Sep 14, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. Supplemental Signs & Costs Supplemental Signs & Costs Heather Lott, PE State Signing Engineer Minnesota Department of Transportation Heather Lott, PE State Signing Engineer Minnesota Department of Transportation

  2. Sign Clutter

  3. Supplemental

  4. Supplemental Guide Signing Programs MnDOT MnDOT pays: General Motorist Service pays: Requester pays: Requester pays: Airports Casino Educational Institutions (post LOGO Sign Franchise Program Major Traffic Generators Minor Traffic Generators National Monuments National Parks Regional Shopping Centers Specific Services State Parks Tourist Information Trail Access General Motorist Service Hospital Airports Casino Educational Institutions (post- -secondary) LOGO Sign Franchise Program Major Traffic Generators Minor Traffic Generators National Monuments National Parks Regional Shopping Centers Specific Services State Parks Tourist Information Trail Access Hospital secondary) Fabrication & Installation Costs requester covers the life of the sign (~15 monthly cost Fabrication & Installation Costs One fee paid for by requester covers the life of the sign (~15 yr Logo signs have a monthly cost One fee paid for by yr) ) Logo signs have a

  5. Signing Manuals Minnesota Manual on Uniform Traffic Control Devices (MN MUTCD) AASHTO Guidelines for Selection of Supplemental Signs Traffic Engineering Manual (TEM) MNDOT Standard Signs Manual MnDOT Guide Design Manual At Freeway Signing Manual Minnesota Manual on Uniform Traffic Control Devices (MN MUTCD) AASHTO Guidelines for Selection of Supplemental Signs - - Freeways Traffic Engineering Manual (TEM) MNDOT Standard Signs Manual MnDOT Standard Signs Summary Guide Design Manual At- -Grade Signing Manual Freeway Signing Manual Freeways Standard Signs Summary Grade Signing Manual

  6. MnDOT General Criteria Roadway type Urban versus rural Facility type Hours of operation Licensing Distance from intersection/interchange Visibility Trailblazing Roadway type Urban versus rural Facility type Hours of operation Licensing Distance from intersection/interchange Visibility Trailblazing

  7. Facility Specific Criteria Townships Townships Shall hold monthly meetings that are open to the public. Township halls are not required to be open eight hours per day, five days per week. Shall be primarily intended for use as a town hall. Should provide adequate on immediate area. Shall post contact information that is visible from the exterior of the building. Shall hold monthly meetings that are open to the public. Township halls are not required to be open eight hours per day, five days per week. Shall be primarily intended for use as a town hall. Should provide adequate on- -site parking or parking in the immediate area. Shall post contact information that is visible from the exterior of the building. site parking or parking in the

  8. Facility Specific Criteria Golf Courses Golf Courses Have at least nine holes. Be open to the public. Have at least nine holes. Be open to the public. Disc Golf Courses Be its own entity located on its own property (not located on or in another facility that can be signed as a minor traffic generator). Have at least 18 holes. Be a member of the Professional Disc Golf Association (PDGA). Disc Golf Courses Be its own entity located on its own property (not located on or in another facility that can be signed as a minor traffic generator). Have at least 18 holes. Be a member of the Professional Disc Golf Association (PDGA).

  9. Ineligible Facilities

  10. Where are they allowed? Conventional Single Lane Highways Conventional Multilane Highways Expressways Freeways & Interstates Conventional Single Lane Highways Conventional Multilane Highways Expressways Freeways & Interstates Not all programs are allowed on every class of roadway Not all programs are allowed on every class of roadway

  11. What do they cost? Requester Memo No. 12 http://dotapp7.dot.state.mn.us/edms/d ownload?docId=1142431 Includes labor, equipment & materials Standard Designs Requester - - Pay Signing Costs Tech Memo No. 12- -02 http://dotapp7.dot.state.mn.us/edms/d ownload?docId=1142431 Includes labor, equipment & materials Standard Designs vs Pay Signing Costs Tech 02- -T T- -01 01 vs special designs special designs

  12. Standard Designs 2 Lane Highways Expressways 2 Lane Highways 36 x 30 Expressways 54 x 48 36 x 30 54 x 48 Cost is approx. = $825 Cost is approx. = $825 - - $1100 $1100

  13. Special Designs Vary in size depending on class of highway Vary in size depending on class of highway Cost is approx. = $1,000 s Cost is approx. = $1,000 s

  14. Logo Signs http://www.minnesota.interstatelogos.com

  15. Logo Sign Costs Monthly cost per sign is $45/$10 Mainline Ramp Monthly cost per sign is $45/$10 Mainline Ramp

  16. What if were wrong? External Sign Variance Committee Representatives from tourism, chamber of commerce, local government, city planning, AAA Hear appeal and policy, advise MnDOT External Sign Variance Committee Representatives from tourism, chamber of commerce, local government, city planning, AAA Hear appeal and policy, advise MnDOT Commissioner Commissioner

  17. Who do I contact? District Traffic Engineer For Contact List: http://www.dot.state.mn.us/trafficeng/contacts.html District Traffic Engineer For Contact List: http://www.dot.state.mn.us/trafficeng/contacts.html

  18. Contact Information: Heather Lott Heather Lott 1500 West County Road B2 Roseville, MN 55113 1500 West County Road B2 Roseville, MN 55113 Heather.Lott@state.mn.us 651 Heather.Lott@state.mn.us 651- -234 234- -7371 7371

Related


More Related Content