Experimental Setup at IP5 for Inelastic Events and Particle Detection

Slide Note
Embed
Share

Experimental setup at IP5 involves inelastic telescopes for charged particle detection and vertex reconstruction. The setup includes T1 and T2 telescopes, HF and CASTOR detectors, as well as Roman Pots for measuring elastic and diffractive protons. The TOTEM experiment focuses on proton-proton interactions, such as elastic scattering and total cross-section at LHC energies. Various publications detail these measurements, including the forward charged particle pseudorapidity density and pseudorapidity distributions. The research also encompasses luminosity-independent measurements and the performance evaluation of TOTEM detectors.


Uploaded on Sep 25, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. Experimental Setup @ IP5 Inelastic telescopes: charged particle & vertex reconstruction in inelastic events T1: 3.1 < < 4.7 T2: 5.3 < < 6.5 HF (CMS) IP5 ~ 10 m ~ 14 m T1 CASTOR (CMS) T2 Roman Pots: measure elastic & diffractive protons close to outgoing beam IP5 RP147 RP220

  2. TOTEM Detectors RP (Si) RP (Si) T2 (GEM) T1 (CSC)

  3. TOTEM Publications Proton-proton elastic scattering at the LHC energy of s = 7 TeV , EPL 95 (2011) 41001 First measurement of the total proton-proton cross section at the LHC energy of s = 7 TeV EPL 96 (2011) 21002 Measurement of the forward charged particle pseudorapidity density in pp collisions at s = 7 TeV with the TOTEM experiment, EPL 98 (2012) 31002 Measurement of proton-proton elastic scattering and total cross-section at s = 7 TeV, EPL 101 (2013) 21002 Measurement of proton-proton inelastic scattering cross-section at s = 7 TeV, EPL 101 (2013) 21003 Luminosity-independent measurements of total, elastic and inelastic cross-sections at s = 7 TeV, EPL 101 (2013) 21004 A luminosity-independent measurement of the proton-proton total cross-section at s = 8 TeV, Phys. Rev. Lett. 111, 012001 (2013) Double diffractive cross-section measurement in the forward region at LHC, Phys. Rev. Lett. 111 (2013) 262001 . Measurement of pseudorapidity distributions of charged particles in proton-proton collisions at s = 8 TeV by the CMS and TOTEM experiments CERN-PH-EP-2014-063, submitted to EPJ The TOTEM Experiment at the CERN Large Hadron Collider JINST 3 (2008) S08007 Performance of the Totem Detectors at the LHC, Int. J. Mod. Phys. A LHC optics determination with proton tracks measured in the Roman Pots detectors of the TOTEM experiment CERN-PH-EP-TOTEM-2014-002, submitted to New J. Phys

  4. Elastic, Inelastic, Total Cross-Sections [8TeV]

  5. CMS-TOTEM Forward Charged Multiplicity Joint CMS-TOTEM data taking / trigger 1st common paper CMS-TOTEM [EPJ]

  6. Extended- Forward Charged Multiplicity

  7. Measurement of low-t Elastic Scattering Data with b* 90m optics Extrapolation to t = 0 and integration of elastic cross section: 25.4 1.1 mb (> 90% of cross-section visible, <10% extrapolated)

  8. Consolidation/upgrade & misure future Miglioramento delle performance, in preparazione della ripetizione di tutte le misure a energia maggiore. Upgrades totem-only Evoluzione verso un progetto comune con upgrades insieme a CMS

  9. RPs Consolidation & Upgrade LS1 overview (schematic) Existing TOTEM RP-220 m (near-far) Relocated stations from 147 m New RP stations New Si pixel tracking detectors in horizontal RPs + RP - RF shield New timing detectors New LHC component New LHC component Far 2 vertical RP 1 horizontal RP TRACKING Detector Near 2 vertical RP 1 horizontal RP TRACKING Detector 1 horizontal RP TIMING Detector 1 horizontal RP TIMING Detector 2 vertical RP top/bottom 1 horizontal RP 2 vertical RP top/bottom 1 horizontal RP outgoing beam shielding TCL-4 TCL-6 Q6 ~ 5-10 m ~ 5 m All RPs can be operated simultaneously ! CMS ip5 ~ 220 m

  10. RPs Performance

  11. RPs Safety RF studies (impact on machine), RF shield for square pots of Run I, New ferrites to control induced RF, New Pots cylindrical with thin window 50 ns IB=0.6 A

  12. DAQ & Trigger DTC (Data, Timing, Commands) to merge more than a FEC CMS DAQ interface UDP link for standalone DAQ Consolidated DAQ Full compatibility with LHC Trigger Timing and Control (TTC) Higher L1 trigger rate (20kHz trigger rate, ~20x w.r.t. previous DAQ system) measured on 1 FEC with 1 OptoRx through a standard PC. Replacement of the VME back-end with Ethernet 1Gb/10Gb links Full TTC commands set, L1A and TTC clock distribution integrated in the system. Hardware resources (FPGA) at different level enables real-time data filtering. Full compatibility with CMS DAQ [goal: exploit CMS HLT online in common runs]

  13. Vertical RPs Timing Detectors m

  14. Clock distribution system 21 5th May 2014 F.S. Cafagna, TOTEM Technical Board

  15. MoU Title CMS-TOTEM : full diffractive physics programme and related new physics searches O(fb) at standard high LHC luminosity. CMS-TOTEM joint-upgrade MoU signed Institution Board & Management Team Tracking detectors Si pixels in RPs Timing detectors in new horizontal RPs 10 ps requirement for high pile-up LHC TDR

  16. Cylindrical Housing (316LN) 0.2 -0.3 mm 2mm 2mm 2mm 0.3mm 0.3mm 2mm The design and technology were created with help of D. Perini and F. Bertinelli (CERN). J. Baechler TOTEM STATUS OF THE CONSOLIDATION WORK LHCC Referee Meeting June 3, 2014 9/25/2024 23

  17. Attivit di sviluppo per il prossimo anno DAQ Fine procurement (EVB/storage e SRS) Ridisegno ottimizzato e produzione Opto-FEC Integrazione e test Sistema di distribuzione del clock a basso jitter: procurement, tests, setup, misure di controllo Partecipazione ai test-beam e sviluppo rivelatori per il timing Probabile necessit di supporto per piccola meccanica ed elettronica di front-end.

  18. Responsabilit del gruppo Responsabilita DAQ/online (Francesco) SRS firmware (Adrian & Michele) chairman Editorial Board (Gabriella) Distribuzione trigger/timing (Michele) e sua evoluzione per timing di precisione (Francesco) Studi di ottimizzazione RF per le Roman Pots (N. Minafra) Sviluppo e test rivelatori per timing (diamanti, silici ) (N. Minafra) Resource coordinator & MB (Emilio)

  19. RD51 2014-2015 MOU (2014-2018) Sviluppo Firmware per SRS (in sinergia con TOTEM) Attivita Laboratorio Infrastrutture: Sostituzione del sistema di condizionamento Piano per l eventuale montaggio/smontaggio (lavori del vallo) Spostamento attrazzeture non utilizzate al momento (recupero spazi) Misure in corso Set-up cameretta 10x10, fori conici, elettronica di readout Gastone Misure di efficenza ( scintillatori + sorgente) ) (RD51,Amidhera) Sviluppi DAQ (DATE) per lettura ADC CAEN V785 (TDC ?) Secondo set-up Misure con miscele di argon puro o quasi puro, con varie disposizioni interne dei piani e delle tensioni (misure criogenicheMisure di tempo di drift (in sinergia con CMS) Misure con nuove miscele (RD51,Amidhera) Cannoncino a raggi X (CMS -> capannone) Richieste 2015 => in linea con 2014 Richieste personale tecnico => come 2014

  20. Anagrafica e richieste servizi

Related


More Related Content