The assessment report for XXX Park includes evaluations on design, landscape, user comfort, and more. Criteria such as biodiversity conservation, maintenance, and community engagement were measured and scored. Recommendations for enhancements and improvements were provided based on the assessment results.


Uploaded on Sep 21, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. <Park Name> Prepared by: XXX Co. Assessment Date: 01 January 2021 existing parks updated 12 Jan 2023 1

  2. Project Name: XXX Development Owner: XXX Type: New/Existing/Regional/Nature /Town Park Landscape Architect: XXX Architect: XXX Address: XXX Site Area: XXX Completion Date: XXX existing parks updated 12 Jan 2023 2

  3. SCORES SUMMARY TOTAL APPLICABLE SCORE SELF-ASSESSED SCORE ASSESSORS SCORE S/N CRITERIA 1 DESIGN & LANDSCAPE 17 X 2 ACCESSIBILITY 13 X 3 COMMUNITY WELLBEING & ENGAGEMENT 27 X 4 ENVIRONMENTAL SUSTAINABILITY 28 X 5 BIODIVERSITY CONSERVATION 20 X 6 MAINTENANCE 33 X 7 BONUS 5 X TOTAL XXX XXX Certified/Silver/ Gold/Platinum (XX%) existing parks updated 12 Jan 2023 3

  4. Part 1: Design & Landscape 1.1 Overall Landscape Concept 1.1a Enhancement of existing site Score Assessors Fair Implemented some basic changes e.g. once every few years 1 Good Demonstrated moderate efforts to enhance or improve site for purposeful objectives 3 Demonstrated strong efforts to frequently enhance or improve site for purposeful objectives. e.g. refresh tired plots, construct dragonfly pond to area with ponding issue Excellent 5 Please include explanations, photos, documentation, statistics, etc. to support self-assessed score for each criteria For documents that are not convenient for including in presentation, please send the separate files You may send additional supporting documents separately, too For criteria that you deem to be not applicable, please also state reasons why existing parks updated 12 Jan 2023 4

  5. Part 1: Design & Landscape 1.1 Overall Landscape Concept 1.1b Biophilic elements Score Assessors Fair Demonstrated some efforts to include biophilic elements 1 Good Demonstrated strong efforts to include biophilic elements 2 existing parks updated 12 Jan 2023 5

  6. Part 1: Design & Landscape 1.2 User Comfort 1.2a Percentage of paths and open spaces shaded by vegetation Score Assessors <30% 1 30 - 70% 2 >70% 3 existing parks updated 12 Jan 2023 6

  7. Part 1: Design & Landscape 1.2 User Comfort 1.2b Thermal comfort Score Assessors Fair Demonstrated some efforts to improve thermal comfort 1 Good Demonstrated moderate efforts to improve thermal comfort 2 Excellent Demonstrated strong efforts to significantly improve thermal comfort 3 existing parks updated 12 Jan 2023 7

  8. Part 1: Design & Landscape 1.2 User Comfort 1.2c Resting points Score Assessors Fair Provided some rest points 1 Good Provided sufficient number of rest points across park 2 Excellent Provided sufficient number and variety of shaded rest points at purposeful locations 3 existing parks updated 12 Jan 2023 8

  9. Part 1: Design & Landscape 1.3 Unique Park Features 1.3a Unique Features Score Assessors Demonstrated basic efforts to differentiate park e.g. signage, special landscaping intentions to enhance greenery around facilities Fair 1 Good Demonstrated moderate efforts to include some unique features e.g. diversity in trail types 2 Demonstrated great efforts to create strong identity and include unique features e.g. war relics, treetop walk, playground themes Excellent 3 existing parks updated 12 Jan 2023 9

  10. Part 1: Design & Landscape TOTAL APPLICABLE SCORE SELF-ASSESSED SCORE ASSESSORS SCORE S/N CRITERIA 1.1 Overall Landscape Concept and Layout 5 X 1.2 User Comfort 9 X 1.3* Unique Park Features 3 X TOTAL 17 X existing parks updated 12 Jan 2023 10

  11. Part 2: Community Wellbeing & Engagement 2.1 Wayfinding 2.1a Understanding of wayfinding for users Score Assessors Fair Conducted occasional reviews or surveys (e.g. once every 3 years) 1 Good Conducted frequent reviews or surveys to understand users' wayfinding experience (e.g. annually) 2 existing parks updated 12 Jan 2023 11

  12. Part 2: Community Wellbeing & Engagement 2.1 Wayfinding 2.1b Wayfinding tools at transport nodes nearest to site entrances Score Assessors Low Impact Provided some signage and map boards that are moderately effective in directing visitors 1 Provided various signage and map boards that are clear and user-centric to direct visitors from surrounding transport nodes and at unclear site entrances within 400m radius around park. High Impact 2 existing parks updated 12 Jan 2023 12

  13. Part 2: Community Wellbeing & Engagement 2.1 Wayfinding 2.1b Wayfinding from surrounding areas to park Score Assessors Low Impact Some users may experience difficulty in navigating to park from surrounding areas 1 High Impact Most users can navigate to the park easily. Park is well integrated with surrounding areas. 2 existing parks updated 12 Jan 2023 13

  14. Part 2: Community Wellbeing & Engagement 2.1 Wayfinding 2.1b Wayfinding in park Score Assessors Low Impact Some areas of park are tough for users to navigate 1 High Impact Most users can effectively navigate at important transport nodes within park 2 existing parks updated 12 Jan 2023 14

  15. Part 2: Community Wellbeing & Engagement 2.2 Universal Design Score Assessors Getting to and into park Provided ramps, hand-railings, drop-off points, carpark lots 2.2a 1 Within park, circulation and wayfinding inside park Pathways Informational signage for different user groups Unobstructed viewing areas suitable for wheelchair 2.2b 1 Amenities & facilities UD features in toilets, shelters, seats, auto-doors Facilities for different user groups, e.g. nursing rooms, seats of varying heights, adjacent space for wheelchair 2.2c 1 existing parks updated 12 Jan 2023 15

  16. Part 2: Community Wellbeing & Engagement 2.2 Universal Design 2.1d Creative strategies Score Assessors Demonstrated simple efforts to enhance accessibility e.g. Availability of UD features information online, signages Fair 1 Demonstrated strong efforts to enhance accessibility. e.g. Inclusive playgrounds, special routes for different user groups Good 2 existing parks updated 12 Jan 2023 16

  17. PART 2: COMMUNITY WELLBEING AND ENGAGEMENT TOTAL APPLICABLE SCORE SELF-ASSESSED SCORE ASSESSORS SCORE S/N CRITERIA 8 X 2.1 Wayfinding 2.2* Universal Design 5 X TOTAL 13 X existing parks updated 12 Jan 2023 17

  18. Part 3: Community Wellbeing & Engagement 3.1 Facilities & Amenities 3.1a Understanding of users' usage patterns Score Assessors Fair Conducted basic study or understanding of user groups 1 Conducted comprehensive study or analysis conducted for various factors e.g. user needs, experience, behaviour 2 Good existing parks updated 12 Jan 2023 18

  19. Part 3: Community Wellbeing & Engagement 3.1 Facilities & Amenities 3.1b Provision of amenities and facilities Score Assessors Fair Provided range of amenities and facilities available that are suitable for some users 1 Good Provided range of amenities and facilities available that are suitable for most users 2 Provided comprehensive range of amenities and facilities at appropriate locations that support needs of various user groups Excellent 3 existing parks updated 12 Jan 2023 19

  20. Part 3: Community Wellbeing & Engagement 3.1 Facilities & Amenities 3.1c Design of facilities & amenities Score Assessors Fair Design are user-centric for some user groups 1 Good Design are user-centric for most user groups 2 Design are user-centric, incorporates biophilic design elements to encourage wellbeing, encourages social interaction between users Excellent 3 existing parks updated 12 Jan 2023 20

  21. Part 3: Community Wellbeing & Engagement 3.2 Lighting 3.2a Provision of outdoor lighting Score Assessors Fair Main circulation pathways are well-lit 1 Good Majority of circulation paths, facilities and amenities are well-lit 2 Excellent Majority or all of park are well-lit and meet recommendations, where possible 3 3.2b Lighting design and strategies Score Assessors Fair Demonstrated efforts to enhance lighting design and usage 1 Implemented effective lighting strategies to achieve purposeful objectives e.g. wayfinding, impact on biodiversity, integrate with surrounding landscape Good 2 existing parks updated 12 Jan 2023 21

  22. Part 3: Community Wellbeing & Engagement 3.3 Toilets 3.3a Provision of toilets Score Assessors Fair Provided some toilets, may not be sufficient for volume of visitors and size of park 1 Good Provided sufficient toilets for volume of visitors and size of park, equipped with basic amenities 2 Provided sufficient toilets equipped with comprehensive amenities suited for park user groups. e.g. child seats, wheelchair and child-friendly wash basins, shower stalls, bike stand, vending machines, drinking fountain Excellent 3 existing parks updated 12 Jan 2023 22

  23. Part 3: Community Wellbeing & Engagement 3.3 Toilets 3.3b Design and placement of toilet facilities Score Assessors Fair Toilets are relatively accessible and have basic design features 1 Good Toilets are accessible, well-ventilated and have basic design features 2 Excellent Toilets are accessible, well-ventilated with good user-centric signage, designed with various natural elements 3 existing parks updated 12 Jan 2023 23

  24. Part 3: Community Wellbeing & Engagement 3.4 Community Engagement 3.4a Frequency of activities and events Score Assessors Occasional (e.g. once a year) 1 Moderate (e.g. every 6 months) 2 Frequent (e.g. at least once every 3 months) 3 existing parks updated 12 Jan 2023 24

  25. Part 3: Community Wellbeing & Engagement 3.4 Community Engagement 3.4b Variety of activities Score Assessors Fair Has basic range of activities to engage limited user groups 1 Good Has moderate range of programmes to engage some user groups 2 Has variety of programmes to engage different user groups E.g. volunteer groups, educational trails, corporate programmes, family events Excellent 3 existing parks updated 12 Jan 2023 25

  26. Part 3: Community Wellbeing & Engagement 3.4 Community Engagement 3.4c Opportunities for informal and formal social interaction and cultural events Score Assessors Fair Provided spaces for opportunities for social interaction and/or events 1 Good Designed facilities to maximise and encourage social interaction and formal events 2 existing parks updated 12 Jan 2023 26

  27. Part 3: Environmental Sustainability TOTAL APPLICABLE SCORE SELF-ASSESSED SCORE ASSESSORS SCORE S/N CRITERIA 3.1 Facilities & Amenities 8 X 3.2* Lighting 5 X 3.3* Toilets 6 X 3.4* Community Engagement 8 X TOTAL 27 X existing parks updated 12 Jan 2023 27

  28. Part 4: Environmental Sustainability 4.1 Management of Resources 4.1a Percentage of horticultural waste recycled Score Assessors >10% to 30% 1 >30% to 70% 2 >70% 3 4.1b On-site recycling of horticultural waste Score Assessors Fair Recycles some horticultural waste on-site 1 Good Recycles significant amount of horticultural waste on-site 2 4.1c Use of non-potable water used for irrigation Score Assessors Uses 10 to <50% non-potable water for irrigation 1 Uses 50% non-potable water for irrigation 2 Uses 50% non-potable water for irrigation, and requires minimal irrigation for plants to thrive 3 existing parks updated 12 Jan 2023 28

  29. Part 4: Environmental Sustainability 4.1 Management of Resources 4.1d Active energy efficiency Score Assessors Low impact Incorporated basic energy-efficient features, energy usage monitoring 1 Moderate impact Incorporated some energy-efficient features, energy usage monitoring 2 Incorporated energy-efficient features, energy usage monitoring or use renewable energy that significantly reduces energy usage High Impact 3 existing parks updated 12 Jan 2023 29

  30. Part 4: Environmental Sustainability 4.1 Management of Resources 4.1e Use of natural daylight and cross ventilation Score Assessors Fair Demonstrated basic efforts to use natural daylighting and ventilation 1 Good Significant use of natural daylighting and ventilation 2 existing parks updated 12 Jan 2023 30

  31. Part 4: Environmental Sustainability 4.1 Management of Resources 4.1f Water efficiency Score Assessors Demonstrated basic efforts to monitor water consumption and reduce water usage e.g. use of water-efficient taps Fair 1 Demonstrated moderate efforts to monitor water consumption and implementations to reduce water usage Good 2 Demonstrated strong efforts to monitor water consumption and implementations to significantly reduce water usage Excellent 3 existing parks updated 12 Jan 2023 31

  32. Part 4: Environmental Sustainability 4.2 Source of Materials Sco re 4.2a Assessors Acquired plants from nurseries under NParks Nursery Accreditation Scheme (NAS) 1 existing parks updated 12 Jan 2023 32

  33. Part 4: Environmental Sustainability 4.2 Source of Materials 4.2b Sustainable source for construction and landscaping materials Score Assessors <10% of materials of applicable usage 1 10 to 50% of materials of applicable usage 2 >50% of materials of applicable usage 3 existing parks updated 12 Jan 2023 33

  34. Part 4: Environmental Sustainability 4.3 Stormwater Management 4.3a Treatment of run-off through natural hydrological features Score Assessors 10% of total runoff of catchment area conveyed through features 1 11% to 35% of total runoff catchment area conveyed through features 2 >35% of total runoff catchment area conveyed through features 3 4.3b Rainwater harvesting Score Assessors Fair Has basic rainwater harvesting features 1 Good 2 Integrated rainwater harvesting with natural hydrological features and re-using of harvested water Excellent 3 existing parks updated 12 Jan 2023 34

  35. Part 4: Environmental Sustainability 4.3 Stormwater Management 4.3c Creative strategies for sustainable stormwater management Score Assessors Fair Features are aesthetically pleasing 1 Good Use of creative strategies for space-efficiency, maintenance needs, multi-functionality 2 existing parks updated 12 Jan 2023 35

  36. Part 4: Environmental Sustainability TOTAL APPLICABLE SCORE SELF-ASSESSED SCORE ASSESSORS SCORE S/N CRITERIA 16 X 4.1 Management of Resources 4.2 Source of Materials 4 X 4.3* Stormwater Management 8 X TOTAL 28 X existing parks updated 12 Jan 2023 36

  37. Part 5: Biodiversity Conservation 5.1 Native Plants 5.1a Quantity of planted species that are native to Southeast Asia region Score Assessors 10 to 30% 1 >30% to 70% 2 >70% 3 5.1b Efforts to manage exotic invasive species Score Assessors Simple short-term efforts to identify and mange spread of exotic species Fair 1 Demonstrated strong efforts to monitor and document exotic urban biodiversity, conduct impact assessments, and manage spread of exotic species Good 2 existing parks updated 12 Jan 2023 37

  38. Part 5: Biodiversity Conservation 5.2 Biodiversity-sensitive Planting & Design 5.2a Understanding of existing habitats, ecological processes and nearby environments Score Assessors Fair Identified site conditions and features 1 Identified and analysed ecological networks beyond site, connections to off- site habitats, wildlife species expected to utilise connection Good 2 existing parks updated 12 Jan 2023 38

  39. Part 5: Biodiversity Conservation 5.2 Biodiversity-sensitive Planting & Design 5.2b Habitat creation through planting design Score Assessors Created themed trails and plots based on existing planting. E.g. butterfly-attracting shrubs, bee trails Fair 1 Enhanced existing habitats or created new habitats to increase flora and fauna diversity. E.g. grasslands, riverine, dragonfly ponds Good 2 Used holistic design that considers existing surrounding habitats, and emulated native landscapes to preserve or increase biodiversity E.g. varying canopy heights, increasing food plants variety, etc. Excellent 3 existing parks updated 12 Jan 2023 39

  40. Part 5: Biodiversity Conservation 5.2 Biodiversity-sensitive Planting & Design 5.2c Features to optimise linkages and connectivity between habitats and landscape areas Score Assessors Fair Demonstrated simple efforts to connect different areas and/or habitats in park 1 Good Demonstrated strong efforts to connect to habitats and ecological networks beyond park s boundary 2 existing parks updated 12 Jan 2023 40

  41. Part 5: Biodiversity Conservation 5.3 Conservation of Habitats, Ecological Processes & Wildlife 5.3a Monitoring changes in flora and fauna species composition and numbers Score Assessors Fair Conducted ad-hoc monitoring and recording 1 Good Conducted annual monitoring and recording (e.g. BioBlitz) 2 Excellent Conducted regular (e.g. every 6 months) monitoring and recording, GIS records 3 existing parks updated 12 Jan 2023 41

  42. Part 5: Biodiversity Conservation 5.3 Conservation of Habitats, Ecological Processes & Wildlife 5.3b Conservation management plan Score Assessors Fair Provided simple management plans for identified key flora and fauna 1 Provided management plans for identified key flora and fauna with clear objectives, measures, monitoring protocols Good 2 Provided comprehensive management plan, considers native habitat corridors, buffers adjacent to off-site natural areas, with clear objectives and measures, monitoring protocols and feedback channels Excellent 3 existing parks updated 12 Jan 2023 42

  43. Part 5: Biodiversity Conservation 5.3 Conservation of Habitats, Ecological Processes & Wildlife 5.3c Mitigations for maintenance works to lessen impact on biodiversity Score Assessors Low Impact Demonstrated some efforts 1 High Impact Demonstrated consistent and comprehensive efforts 2 existing parks updated 12 Jan 2023 43

  44. Part 5: Biodiversity Conservation TOTAL APPLICABLE SCORE SELF-ASSESSED SCORE ASSESSORS SCORE S/N CRITERIA 5 X 5.1 Native Plants 5.2 Biodiversity-sensitive Planting & Design 7 X 5.3* Conservation of habitats, ecological processes & wildlife 8 X TOTAL 20 X existing parks updated 12 Jan 2023 44

  45. Part 6: Maintenance 6.1 Design for Landscape Maintainability 6.1a Plant species selection and placement Score Assessors Requires high frequency of softscape maintenance due to placement and choice of plant species Low Impact 1 Moderate Impact Requires moderate frequency of softscape maintenance due to placement and choice of plant species 2 Requires minimal softscape maintenance across different weather conditions due to placement and choice of plant species High Impact 3 existing parks updated 12 Jan 2023 45

  46. Part 6: Maintenance 6.1 Design for Landscape Maintainability 6.1b Hardscape elements Score Assessors Low Impact Requires high frequency of hardscape maintenance due to choice or design of hardscape elements 1 Moderate Impact Requires moderate frequency of hardscape maintenance due to choice or design of hardscape elements 2 High Impact Requires minimal hardscape maintenance due to choice or design of hardscape elements 3 existing parks updated 12 Jan 2023 46

  47. Part 6: Maintenance 6.1 Design for Landscape Maintainability 6.1c Ease of landscape maintenance access Score Assessors Fair <50% of landscaped areas can be easily accessed for inspection and maintenance 1 Good 50 to 80% of landscaped areas can be easily accessed for inspection and maintenance 2 Excellent >80% of landscaped areas can be easily accessed for inspection and maintenance 3 existing parks updated 12 Jan 2023 47

  48. Part 6: Maintenance 6.2 Maintenance Plans and Operations 6.2a Management plans for softscape and hardscape Score Assessors Fair Provided basic documentation 1 Good Provided comprehensive plans and documentation that cover various aspects 2 existing parks updated 12 Jan 2023 48

  49. Part 6: Maintenance 6.2 Maintenance Plans and Operations 6.2b Safety and asset condition inspection reports for hardscape, features and facilities Score Assessors Fair Conducted ad-hoc inspections with documentation of assessments 1 Good Conducted moderate frequency of inspections (e.g. annually) with documentation of assessments 2 Excellent Conducted frequent inspections that are well-documented (e.g. every 6 months) 3 existing parks updated 12 Jan 2023 49

  50. Part 6: Maintenance 6.2 Maintenance Plans and Operations 6.2c Inspection and monitoring plan for softscape Score Assessors Fair Conducted ad-hoc inspections with documentation of assessments 1 Good Conducted moderate frequency of inspections (e.g. annually) with documentation of assessments 2 Excellent Conducted frequent inspections that are well-documented (e.g. every 6 months) 3 existing parks updated 12 Jan 2023 50