Overview of EWS Update on Underground Storage Tanks and Solid Waste Disposal Control Board

Slide Note
Embed
Share

Detailed images showcase the management of leachate at the site, including the IWC leachate sump, pre-treatment plant, stormwater pond, and gas sheds. The temporary closure of IWC slopes and on-site soil borrow areas are also highlighted. Aerial views provide an insight into the facility's layout and processes undertaken.


Uploaded on Sep 27, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. EWS Update Underground Storage Tanks and Solid Waste Disposal Control Board May 15, 2018

  2. Aerial View of the Site IWC Leachate Sump IWC Borrow Area APWC IWC Leachate Storage Pre-treatment Plant Storm Water Pond APWC Leachate And Gas Sheds

  3. Management of Leachate (IWC)

  4. Management of Leachate (IWC)

  5. Management of Leachate (IWC)

  6. Management of Leachate (Deposits)

  7. Management of Leachate (Deposits)

  8. Temporary Closure of IWC Existing IWC Slopes April, 2017

  9. On Site Soil Borrow Area

  10. On Site Soil Borrow Area

  11. On Site Soil Borrow Area

  12. On Site Soil Borrow Area

  13. Temporary Closure of IWC

  14. Temporary Closure of IWC

  15. Temporary Closure of IWC

  16. Temporary Closure of IWC

  17. Temporary Closure of IWC

  18. Temporary Closure of IWC

  19. Most Recent Activities Continued to ship Aluminum Processing Waste Cell leachate off-site for disposal Industrial Waste Cell leachate continued to be treated and stored Performed routine daily gas system and cover operation and maintenance activities Performed daily ammonia monitoring

  20. Most Recent Activities Closure Construction Activities Performed: Began Clearing and Grubbing Borrow Area Began Placement of Structural Fill Wedge in Northeast Corner of Aluminum Processing Waste Cell A Limited Shipment of LLDPE Geomembrane Arrived on Site (To Be Used to Extend Geomembrane Over Fill Wedge) Dewatering Pumps Set Up in Preparation of Pond Modification Work Weekly Construction Meeting Held

  21. Contact Email: Phone: Fax: Mail: Nickolaus.Lytle@tn.gov 615-532-8004 615-532-0938 Division of Solid Waste Management William R. Snodgrass Tennessee Tower 312 Rosa L. Parks Avenue, 14th Floor Nashville, TN 37243

Related