Along the historic Silk Road, the implementation of Joint Border Control Posts (JBCPs) is a strategic move to streamline processes, reduce duplication, and enhance efficiency in cross-border trade. By consolidating control efforts, leveraging technology, and optimizing infrastructure, the initiative aims to facilitate smoother transit for goods and vehicles, particularly at key points like the Silk Road Joint BCP. The adoption of integrated measures, such as joint procedures, automated systems, and risk management principles, underscores the commitment to secure and expedite international trade along this significant corridor.


Uploaded on Jul 16, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. Joint Road BCPs: Joint Road BCPs: Silk Road JBCP (AZ Silk Road JBCP (AZ- -GE) GE) Radomir Djuric Radomir Djuric ADB Consultant

  2. Why Joint BCPs & How They Work (Or Not) One Stop & Joint Procedure instead of Two The GOAL = efficiency Automated, Risk Management-based, and Technology-driven One-Stop could be National or Bilateral (International) Instead of Duplication Integration Multiple, Consecutive, Complex, Duplicative Control Procedures To achieve it in practice, it is not enough just to put Border Agencies in one place (=Collocated BCP), but to complete a series of measures WCO SMART = Secure, Measurable,

  3. Key Measures Minimize and optimize the workload at Road BCPs 1. Only Customs and Border Police should be permanently working at the Control Line (or even only one unified agency) 2. Electronic documents, filed in advance securely via the Single Window (ideally, simultaneously to all BCPs on the itinerary) 3. Control completed at the points of origin and destination, whereas at the intermediary BCPs a quick verification is performed 4. Use the WCO/Kyoto ConventionRisk Management principles 5. Simultaneous joint controls, based on the One-Stop system

  4. Infrastructure & Equipment Changes One Stop mean ONE, not two, three or more stops For trucks, high-level truck cabins (at 1,80 meters) should be installed Automated Number Plate Recognition (ANPR) system + CCTV + Automated Container Number Recognition (ACRN) - connected to ICT systems of both Border Agencies, that automatically triggers the respective files connected with the approaching vehicle please see the next slide Primary Control and Secondary Inspection Building Possible tracking system, such as GPS/GLONASS, RFID, e-seals

  5. Video Control Systems 5

  6. Four Typesof Joint BCPs 6

  7. Silk Road Joint BCP Reasons: 1) growing international transit via the Middle Corridor + bilateral trade (Total trucks in 2021: 264, 442, 2022: 292, 935 2) constrained space at the Red Bridge, the only convenient Road BCP Joint BCP (JBCP) named Abreshumis Gza- Ipek Yolu Silk Road. This was formalized by a Baku Agreement of 29 September 2021. The location was agreed and both countries published the relevant decisions in their respective official gazettes. The midpoint coordinates were 410 23 33 North and 450 09 03 East. Accepted by Georgia Azerbaijan s agreement expected. It will operate as a JOINT BCP, firstly only for trucks, then also cars & buses 7

  8. 8

  9. Future Operations 1. Bilateral Legal Agreement 2. 2. Joint Joint Operational Operational Procedures Agreement the most important and the most complex document Procedures, as Annex 1 of the Bilateral Legal 3. List of Equipment 4. Design Inputs 5. Blueprints and 2D models qClassical Classical Island Island Configuration: six per direction six per direction Configuration: Twelve Twelve control control lanes lanes planned, planned, 9

  10. Joint Control Cabins Joint Control Cabins 10

  11. Renewable Energy Renewable Energy at BCP at BCP Should be a standard: qEconomic and Environmental Benefits qRain Harvesting Photovoltaic, third-generation high efficiency Heat pump with COP of 5.0 or higher, with A+++ label, rated by the European Heat Pump Association (EHPA) and use R- 290 or another environmentally friendly refrigerant 11

  12. General Plan General Plan 12

  13. Thank you! Thank you! ! ! Mr. Radomir Djuric Mr. Radomir Djuric ADB Consultant