FHWA Assignments and Initiatives Overview

Slide Note
Embed
Share

This detailed content provides information on various FHWA staff assignments, division assignments, planning and environment assignments, as well as an overview of EDC-4 initiatives being considered. It includes key personnel names, contact information, and district allocations. The EDC-4 initiatives encompass a range of projects such as Automated Traffic Signal Performance Measures, Data-Driven Safety Analysis, and Safe Transportation for Every Pedestrian, among others.


Uploaded on Sep 18, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. FHWA Steve Mills Assistant Division Administrator

  2. Topics FHWA staff assignments FHWA Process reviews EDC-4 initiatives being considered Status of Transportation Performance Management / Measures

  3. FHWA Design Assignments David Whitworth (502) 223-6741 Project Delivery Team Leader & ROW Officer Duane Thomas (502) 223-6749 Districts 1 and 2 Ryan Tenges (502) 223-6750 Districts 3, 7, 8, and 9 Dana Robbins (502) 223-6757 Districts 4, 10, and 12 Michael Loyselle (502) 223-6748 Districts 5, 6, and 11

  4. FHWA Division Assignments

  5. FHWA Planning & Environment Assignments John Ballantyne (502) 223-6747 Program Delivery Team Leader Bernadette Dupont (502) 223-6729 MPOs: Cincinnati, Elizabethtown, Henderson, Owensboro, Lexington Greg Rawlings (502) 223-6728 MPOs: Louisville, Bowling Green, Ashland, Clarksville Eric Rothermel Environmental: Statewide

  6. Topics FHWA staff assignments FHWA Process reviews EDC-4 initiatives being considered Status of Transportation Performance Management / Measures

  7. FHWA Process Reviews FHWA Process Reviews for 2016/2017 Project Closeout DBE Commercially Useful Function (CUF) LPA Construction Authorization Process KYTC encroachment Permit Process HSIP Pavement Life

  8. Topics FHWA staff assignments FHWA Process reviews EDC-4 initiatives being considered Status of Transportation Performance Management / Measures

  9. EDC-4 Initiatives Being Considered KYTC considering new round of EDC-4 initiatives Automated Traffic Signal Performance Measures (ATSPMs) Collaborative Hydraulics Community Connections Data-Driven Safety Analysis (DDSA) e-Construction and Partnering Integrating NEPA and Permitting Pavement Preservation Road Weather Management Safe Transportation for Every Pedestrian (STEP) Ultra-High Performance Concrete Connections Using Data to Improve Traffic Incident Management

  10. Topics FHWA staff assignments EDC-4 initiatives being considered Status of Transportation Performance Management / Measures

  11. Transportation Performance Measures

  12. FHWA PM Rulemaking Schedule Performance Area Safety Performance Measures Highway Safety Improvement Program Statewide and Metro Planning; Non-Metro Planning Pavement and Bridge Performance Measures Highway Asset Management Plan 2015 Performance of the NHS, Freight, and CMAQ Measures NPRM Comments Due Closed June 30, 2014 Final Rule Published March 15, 2016 March 11, 2014 Closed June 30, 2014 Published March 15, 2016 March 28, 2014 Closed October 2, 2014 Published May 27, 2016 June 2, 2014 Closed May 8, 2015 Anticipated November 2016 January 5, 2015 February 20, Closed May 29, 2015 Anticipated November 2016 Closed August 2016 April 22, 2016 TBD

  13. QUESTIONS? Steve Mills US Department of Transportation Federal Highway Administration KY 330 West Broadway Frankfort, KY 40601-1981 Steve.Mills@dot.gov (502) 223-6723

Related