Updates to IDNR Floodplain Ordinance and New Definitions

IDNR Floodplain Ordinance
Updates
IAFSM Conference
March 8, 2022
Catalyst
New FEMA
Guidance
2
Additional
Changes
Add Floodplain Manager duties including
substantial damage/improvement procedures
Clarify Critical Facility review
BFE in A Zones
Add CLOMR requirement for fill in Floodway
Add references to Technical Bulletins for flood
openings and building on fill
Link Start of Construction definition to
permitting process
Add Stop Work order to Penalties
Expand variance section to outline process
3
N
e
w
 
o
r
 
A
m
e
n
d
e
d
 
D
e
f
i
n
i
t
i
o
n
s
Accessory Structure
Agricultural Structure
Conditional Letter of Map Revision (CLOMR)
Critical Facility
Dam
Development
IDNR /OWR Jurisdictional Stream
LOMA and LOMR
Start of Construction
Violation
4
N
e
w
 
D
e
f
i
n
i
t
i
o
n
s
Accessory Structure - A non-habitable building, used only for
parking of vehicles or storage, that is on the same parcel of property
as the principal building and which 
is incidental to the use of the
principal building.
Agricultural Structure - A walled and roofed structure used
exclusively for agricultural purposes or uses in connection with the
production, harvesting, storage, raising, or drying of agricultural
commodities and livestock, including aquatic organisms
.  Structures
that house tools or equipment used in connection with these
purposes or uses are also considered to have agricultural purposes
or uses.
5
D
e
f
i
n
i
t
i
o
n
 
C
h
a
n
g
e
 
 
C
r
i
t
i
c
a
l
 
f
a
c
i
l
i
t
y
Critical Facility - Any facility which is critical to the health and welfare of
the population and, if flooded, would create an added dimension to the
disaster.  Damage to these critical facilities can impact the delivery of
vital services, can cause greater damage to other sectors of the
community, or can put special populations at risk.
Examples of critical facilities where flood protection should be required
include:  emergency services facilities (such as fire and police stations),
schools, hospitals retirement homes and senior care facilities, major
roads and bridges, critical utility sites (telephone switching stations or
electrical transformers, and hazardous material storage facilities
(chemicals, petrochemicals, hazardous or toxic substances).
6
D
e
f
i
n
i
t
i
o
n
 
C
h
a
n
g
e
 
-
 
D
e
v
e
l
o
p
m
e
n
t
OLD Exceptions
“Development” does not 
include routine maintenance of existing
buildings and facilities, resurfacing roads
, or gardening, plowing,
and similar practices that do not involve filing, grading, or
construction of levees.
NEW Exceptions
“Development” does not include 
resurfacing of pavement when
there is no increase in elevation
; construction of farm fencing
*
; or
gardening, plowing, and similar practices that do not involve filing,
grading, or construction of levees.
*
 Outside of NE Illinois 6 counties
7
T
e
x
t
 
c
h
a
n
g
e
s
 
 
B
F
E
 
d
e
t
e
r
m
i
n
a
t
i
o
n
Remove references to Illinois State Water Survey as a depository.
Removes record flood plus 3 feet.
8
T
e
x
t
 
c
h
a
n
g
e
s
 
 
D
e
v
e
l
o
p
m
e
n
t
 
P
e
r
m
i
t
Expanded list of what must be submitted
Provides for an overall permit expiration and requires work on new
buildings to start in 180 days or permit expires (Start of
Construction)
As-built documentation expanded, allowing Elevation Certificates,
Floodproofing certificates to be required.
Requires a sign-off on the floodplain development permit before an
occupancy permit can be issued
Expanded to include an optional fees section for communities
without a fee ordinance or a building permit process
Explains that a LOMR-Floodway is required if floodway needs to be
corrected
9
T
e
x
t
 
c
h
a
n
g
e
s
 
-
 
C
r
i
t
i
c
a
l
 
F
a
c
i
l
i
t
y
No “feasible alternative site” language removed.
FPA required to compare a site’s ground elevation for critical facility
to the 0.2% annual chance flood elevation.
Clarifies that 
buildings
 must have lowest floor elevated to 0.2 %
flood elevation or 1% elevation plus 3 feet.
Adequate parking for staffing of facilities must be provided above
the BFE required.
Access routes to be reviewed and “should” be above the BFE.
Critical facilities list in body of the ordinance.
Floodproofing and sealing measures listed as a protection measure.
10
T
e
x
t
 
c
h
a
n
g
e
s
 
 
L
O
M
R
s
/
 
C
L
O
M
R
s
CLOMR required for BFE increases due to floodway.
encroachments or BFE increases in a Zone A.
Clarifies that grading permits may be issued but no permits for
buildings before the LOMR is issued.
Clarifies LOMR-Based on Fill and gives communities opportunity
to outright prohibit basements in any fill used to elevate a site
above the BFE.
If basement allowed, calls out TB 10-01 and explains Reasonably
Safe responsibilities of the local FPA.
11
T
e
x
t
 
c
h
a
n
g
e
s
 
 
S
t
a
r
t
 
o
f
 
C
o
n
s
t
r
u
c
t
i
o
n
Per the NFIP federal code all permits must expire in 180 days if
the “start of construction” has not begun.
Start of construction definition is concerned with buildings – not
grading or utilities.  Pouring of the slab, installation of piles,
foundations, etc.
To provide for new maps or LOMRs where the BFE increases.
Some communities allow permits to last for 2 or 3 years.
12
S
t
a
r
t
 
o
f
 
C
o
n
s
t
r
u
c
t
i
o
n
 
a
n
d
 
P
e
r
m
i
t
 
E
x
p
i
r
a
t
i
o
n
A development permit or approval shall become invalid unless the actual Start
of Construction, as defined, for work authorized by such permit, is
commenced within 180 days after its issuance,
 or if the work authorized is
suspended or abandoned for a period of 180 days after the work commences.
All permitted work shall be completed within (*Insert twelve (12) months,
eighteen (18) months or a local permit expiration period) after the date of
issuance of the permit or the permit shall expire. 
Time extensions, of not
more than 180 days each, may be granted, in writing, by the _____________.
Time extensions shall be granted only if the original permit is compliant with
this ordinance and the FIRM and FIS in effect at the time the extension is
granted.
13
T
e
x
t
 
c
h
a
n
g
e
s
 
 
A
c
c
e
s
s
o
r
y
 
S
t
r
u
c
t
u
r
e
s
Maximum size 600 sq. ft. in keeping with FEMA guidance.
No value limit listed, difficult with inflation and differences across
the state in construction costs
Permanent openings on at least 2 walls instead of all 4 walls, in
keeping with TB 1.
Does not restrict to residential properties
14
T
e
x
t
 
c
h
a
n
g
e
s
 
 
A
g
r
i
c
u
l
t
u
r
a
l
 
S
t
r
u
c
t
u
r
e
s
Entire subsection under Variances.
Must be exclusive for agriculture production, harvesting ,storage,
etc. No farm stands, wedding venues, or wine tasting rooms.
State floodway permit required if in the floodway.
Permanent openings on at least 2 walls, in keeping with TB 1.
Restricts manure storage or livestock confinement.
15
T
e
x
t
 
c
h
a
n
g
e
s
 
 
V
a
r
i
a
n
c
e
s
Specifies that all records must be maintained:
Technical justifications submitted by the applicant.
Staff report and recommendations submitted by the floodplain
administrator.
The notification to property owner for increases in flood insurance.
16
T
e
x
t
 
c
h
a
n
g
e
s
 
 
P
e
n
a
l
t
i
e
s
Provides for a stop work order to suspend the development and
provides for a hearing.
Requires the notice of violation to be recorded.
17
 
Q
u
e
s
t
i
o
n
s
?
Marilyn Sucoe
NE Illinois Floodplain Advisor
(847) 608-3181
Marilyn.sucoe@Illinois.gov
Ashley Reimann
FEMA Regional Specialist
(312) 408-5563
Ashley.reimann@fema.dhs.gov
18
Slide Note
Embed
Share

This content provides information on the updates to the IDNR Floodplain Ordinance including new responsibilities for Floodplain Managers, clarification on Critical Facility reviews, and the addition of new definitions such as Accessory Structure and Agricultural Structure. It also emphasizes the importance of protecting Critical Facilities during flooding events to ensure the health and welfare of the community.

  • IDNR
  • Floodplain
  • Ordinance
  • Updates
  • Definitions

Uploaded on Sep 29, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. IDNR Floodplain Ordinance Updates IAFSM Conference March 8, 2022

  2. Catalyst New FEMA Guidance 2

  3. Add Floodplain Manager duties including substantial damage/improvement procedures Clarify Critical Facility review BFE in A Zones Add CLOMR requirement for fill in Floodway Add references to Technical Bulletins for flood openings and building on fill Link Start of Construction definition to permitting process Add Stop Work order to Penalties Expand variance section to outline process Additional Changes 3

  4. New or Amended Definitions New or Amended Definitions Accessory Structure Agricultural Structure Conditional Letter of Map Revision (CLOMR) Critical Facility Dam Development IDNR /OWR Jurisdictional Stream LOMA and LOMR Start of Construction Violation 4

  5. New Definitions New Definitions Accessory Structure - A non-habitable building, used only for parking of vehicles or storage, that is on the same parcel of property as the principal building and which is incidental to the use of the principal building. Agricultural Structure - A walled and roofed structure used exclusively for agricultural purposes or uses in connection with the production, harvesting, storage, raising, or drying of agricultural commodities and livestock, including aquatic organisms. Structures that house tools or equipment used in connection with these purposes or uses are also considered to have agricultural purposes or uses. 5

  6. Definition Change Definition Change Critical facility Critical facility Critical Facility - Any facility which is critical to the health and welfare of the population and, if flooded, would create an added dimension to the disaster. Damage to these critical facilities can impact the delivery of vital services, can cause greater damage to other sectors of the community, or can put special populations at risk. Examples of critical facilities where flood protection should be required include: emergency services facilities (such as fire and police stations), schools, hospitals retirement homes and senior care facilities, major roads and bridges, critical utility sites (telephone switching stations or electrical transformers, and hazardous material storage facilities (chemicals, petrochemicals, hazardous or toxic substances). 6

  7. Definition Change Definition Change - - Development Development OLD Exceptions Development does not include routine maintenance of existing buildings and facilities, resurfacing roads, or gardening, plowing, and similar practices that do not involve filing, grading, or construction of levees. NEW Exceptions Development does not include resurfacing of pavement when there is no increase in elevation; construction of farm fencing*; or gardening, plowing, and similar practices that do not involve filing, grading, or construction of levees. * Outside of NE Illinois 6 counties 7

  8. Text changes Text changes BFE determination BFE determination Remove references to Illinois State Water Survey as a depository. Removes record flood plus 3 feet. 8

  9. Text changes Text changes Development Permit Development Permit Expanded list of what must be submitted Provides for an overall permit expiration and requires work on new buildings to start in 180 days or permit expires (Start of Construction) As-built documentation expanded, allowing Elevation Certificates, Floodproofing certificates to be required. Requires a sign-off on the floodplain development permit before an occupancy permit can be issued Expanded to include an optional fees section for communities without a fee ordinance or a building permit process Explains that a LOMR-Floodway is required if floodway needs to be corrected 9

  10. Text changes Text changes - - Critical Facility Critical Facility No feasible alternative site language removed. FPA required to compare a site s ground elevation for critical facility to the 0.2% annual chance flood elevation. Clarifies that buildings must have lowest floor elevated to 0.2 % flood elevation or 1% elevation plus 3 feet. Adequate parking for staffing of facilities must be provided above the BFE required. Access routes to be reviewed and should be above the BFE. Critical facilities list in body of the ordinance. Floodproofing and sealing measures listed as a protection measure. 10

  11. Text changes Text changes LOMRs/ CLOMRs LOMRs/ CLOMRs CLOMR required for BFE increases due to floodway. encroachments or BFE increases in a Zone A. Clarifies that grading permits may be issued but no permits for buildings before the LOMR is issued. Clarifies LOMR-Based on Fill and gives communities opportunity to outright prohibit basements in any fill used to elevate a site above the BFE. If basement allowed, calls out TB 10-01 and explains Reasonably Safe responsibilities of the local FPA. 11

  12. Text changes Text changes Start of Construction Start of Construction Per the NFIP federal code all permits must expire in 180 days if the start of construction has not begun. Start of construction definition is concerned with buildings not grading or utilities. Pouring of the slab, installation of piles, foundations, etc. To provide for new maps or LOMRs where the BFE increases. Some communities allow permits to last for 2 or 3 years. 12

  13. Start of Construction and Permit Expiration Start of Construction and Permit Expiration A development permit or approval shall become invalid unless the actual Start of Construction, as defined, for work authorized by such permit, is commenced within 180 days after its issuance, or if the work authorized is suspended or abandoned for a period of 180 days after the work commences. All permitted work shall be completed within (*Insert twelve (12) months, eighteen (18) months or a local permit expiration period) after the date of issuance of the permit or the permit shall expire. Time extensions, of not more than 180 days each, may be granted, in writing, by the _____________. Time extensions shall be granted only if the original permit is compliant with this ordinance and the FIRM and FIS in effect at the time the extension is granted. 13

  14. Text changes Text changes Accessory Structures Accessory Structures Maximum size 600 sq. ft. in keeping with FEMA guidance. No value limit listed, difficult with inflation and differences across the state in construction costs Permanent openings on at least 2 walls instead of all 4 walls, in keeping with TB 1. Does not restrict to residential properties 14

  15. Text changes Text changes Agricultural Structures Agricultural Structures Entire subsection under Variances. Must be exclusive for agriculture production, harvesting ,storage, etc. No farm stands, wedding venues, or wine tasting rooms. State floodway permit required if in the floodway. Permanent openings on at least 2 walls, in keeping with TB 1. Restricts manure storage or livestock confinement. 15

  16. Text changes Text changes Variances Variances Specifies that all records must be maintained: Technical justifications submitted by the applicant. Staff report and recommendations submitted by the floodplain administrator. The notification to property owner for increases in flood insurance. 16

  17. Text changes Text changes Penalties Penalties Provides for a stop work order to suspend the development and provides for a hearing. Requires the notice of violation to be recorded. 17

  18. Questions? Marilyn Sucoe NE Illinois Floodplain Advisor (847) 608-3181 Marilyn.sucoe@Illinois.gov Ashley Reimann FEMA Regional Specialist (312) 408-5563 Ashley.reimann@fema.dhs.gov 18