Streamlined Mining Application Management System Overview

Slide Note
Embed
Share

The mining department has established a comprehensive management system consisting of guidelines, templates, and monitoring tools to ensure transparent processing of applications and accountability in licensing procedures. The system promotes transparency in decision-making, supports mining activities in South Africa, and manages approved mining rights efficiently. Access to the system is available on weekdays through the SAMRAD system and the department's website, enabling online application submission and profile creation for prospective applicants.


Uploaded on Aug 08, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. PROCESSES UNDERTAKEN AND LINKAGES CREATED IN THE MANAGEMENT SYSTEM: The Department has Developed Guidelines aligned with Act and Regulations Developed standard templates for supporting document submission Developed standard Evaluation Tools Aligned with Guidelines and templates The compliance monitoring system will measure compliance with commitments made in supporting documentation, e.g. PWP s MWP s, NEMA, BEE s, S&LP s etc.

  2. THE SYSTEM IS ABOUT: Transparent processing of applications. It is about accountability for licensing official Transparency in decision making Promotion of Mining in South Africa Project Management of APPROVED rights

  3. SAMRAD SYSTEM IS ONLY AVAILABLE ON WEEKDAYS (Monday Friday) BETWEEN: 08H00 16H00 (CAT)

  4. SAMRAD SYSTEM CAN BE ACCESSED THROUGH DEPARTMENTAL WEBSITE: www.dmr.gov.za

  5. LINK TO ONLINE APPLICATION SYSTEM 6

  6. THE DMR PORTAL IS ACCESSIBLE FROM THE DMR WEBSITE

  7. BEFORE COMMENCEMENT OF APPLICATION, A PROSPECTIVE APPLICANT NEEDS TO CREATE A PROFILE, PROVIDE DETAILS AS SHOWN ABOVE Password must not exceed 10 characters

  8. ONCE THE APPLICANT IS LOGGED IN, THE FOLLOWING SERVICES ARE AVAILABLE

  9. MINING RIGHT

  10. PROSPECTING RIGHT

  11. CLICK ON THE I ACCEPT ICON CLICK ON THE I ACCEPT ICON CLICK CHECK BOX TO ACTIVATE I ACCEPT ICON CLICK CHECK BOX TO ACTIVATE I ACCEPT ICON 12

  12. STEPS CLICK ADD COMMODITY AFTER SELECTION OF EACH COMMODITY ONCE THE GENERAL & COMMODITY INFORMATION HAS BEEN COMPLETED, CLICKS NEXT BUTTON TO GO TO STEP 2

  13. TICK CHECK BOX 14

  14. HELP ICON FOR MAP NAVIGATION TOOLS HELP ICON FOR MAP NAVIGATION TOOLS AND APPLICATION INTERROGATION AND APPLICATION INTERROGATION ENSURE THAT ALL LAYERS ARE CHECKED FOR YOU TO VIEW FARM BOUNDARIES, WATER BODIES, ROADS, ETC. INTEGRATED GIS COMPONENT WILL OPEN AS A SEPARATE BROWSER

  15. CLICK TO UPLOAD COORDINATES ASCII FILE CLICK TO ENTER COORDINATES MANUALLY AS PRESCRIBED SELECT LAND BY UPLOADING COORDINATES

  16. EXTRACT POLYGON TO SHAPEFILE

  17. DRAW RECTANGLE ALWAYS CLICK ADD TO MY SELECTED POLYGONS AFTER SELECTING A FARM DRAW POLYGON CLICK TO SELECT FARM FARM SELECTION

  18. SELECTED FARM YOU CAN EXPAND THE VIEWER USING THE ARROWS EXAMPLE OF THE FARM AFTER BEING SELECTED

  19. CLICK THE VALIDATE BUTTON FOR BUSINESS RULE AND SAVE BEFORE YOU COMPLETE CAPTURE

  20. CLICK COMPLETE CAPTURE TO FINALISE YOUR MAP SELECTION STAGE AND CLOSE THE BROWSER TO CONTINUE

  21. COMPLETE STEP 3 PART A OF THE APPLICATION AND CLICK ON NEXT BUTTON TO PROCEED

  22. COMPLETE STEP 4 HDSA INFORMATION AND CLICK ON NEXT BUTTON TO PROCEED

  23. THE SYSTEM AUTOMATICALLY POPULATES STEP 5 PART C WITH THE CURRENT LOGGED ON USER

  24. THE SYSTEM AUTOMATICALLY POPULATES STEP 6 WITH FARM DETAILS FROM THE SELECTED LAND IN STEP 2

  25. PDF FORMAT UPLOAD ALL REQUIRED DOCUMENTATION NOTE: All documents have to be provided in the prescribed PDF format

  26. THE FINAL STEP IS TO PROVIDE PAYMENT (CREDIT CARD AND EFT HAVE BEEN PROVIDED)

  27. A SEPARATE BROWSER WILL OPEN FOR AN APPLICANT TO CHOOSE RELEVANT OPTION TOTAL AMOUNT INCLUDES MPRDA AND NEMA APPLICATION FEES

  28. AN APPLICANT WILL THEN BE REQUIRED TO CONFIRM THE AMOUNT BEFORE PROCEEDING WITH PAYMENT

  29. DECLARATION IS GIVEN BEFORE THE APPLICATION IS PUBLISHED TO THE WORKFLOW SYSTEM

  30. UPON SUCCESSFUL LODGING OF THE APPLICATION, THE APPLICANT WILL RECEIVE AN ACKNOWLEDGEMENT OF RECEIPT APPLICATION REFERENCE NUMBER TO BE USED FOR FUTURE REFERENCE

  31. THE ACKNOWLEDGEMENT OF RECEIPT WILL INCLUDE A GIS MAP SHOWING THE EXACT PROPERTY THAT HAS BEEN SELECTED. IT IS IMPORTANT TO NOTE THAT, THIS IS NOT AN ACCEPTANCE LETTER

  32. ONCE THE APPLICATION HAS BEEN UPLOADED, AN APPLICATION RECORD IS GENERATED INTERNALLY WITH THE FOLLOWING WORKFLOW.

  33. UPON RECEIPT/ ACKNOWLEDGEMENT OF APPLICATION, REGIONAL MANAGER WILL ACCEPT OR REJECT THE APPLICATION BY E-SIGNING. 34

  34. EACH APPLICATION IS ADJUDICATED USING AN INTERNAL CHECKLIST DRIVEN APPROACH. THESE CHECKLISTS ARE INLINE WITH THE GUIDELINES AND TEMPLATES THAT HAVE BEEN SUBMITTED.

  35. DMR INTERNAL ADJUDICATORS ARE REQUIRED TO SUPPLY CONFIRMATION OF COMPLIANCE OR NON COMPLIANCE, WITH EACH REGULATION

  36. ONLINE INTERNAL GIS VIEWER

  37. VARIOUS LEGENDS DISPLAYED ON THE MAP

  38. FARM/S AND PORTION/S

Related


More Related Content