Scintillator Test Results and Experimental Structure

scintillator test results l.w
1 / 10
Embed
Share

Explore the results and structure of a scintillator test experiment, including data, reflectors, and various groups' outcomes with different materials. Gain insights into the process and findings of the study.

  • Scintillator
  • Experiment
  • Results
  • Reflectors
  • Data

Uploaded on | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. Scintillator test results Cunfeng Feng Zhongquan Zhang Ang Li

  2. Structure of the experiment shelf PMT Trigger PMT Group1 PMT Group2 DAQ PMT Group3 PMT Group4 PMT Reference PMT Trigger

  3. Structure of each group Aluminum plate The reflectors are changed everyday, sometimes they are print paper, sometimes they are aluminum, sometimes they are Tyvek, sometimes they are nothing. lead reflector scintillator PMT

  4. Reflectors

  5. Data of reference Reference 2016-04-17

  6. Results Reference 34 32 30 28 NPE 26 24 22 20 DATE

  7. Results without reflector 50 45 40 NPE 35 30 25 20 2/29/2016 3/10/2016 3/14/2016 3/16/2016 3/18/2016 3/20/2016 3/22/2016 3/24/2016 3/26/2016 3/28/2016 3/30/2016 4/11/2016 4/13/2016 4/15/2016 4/17/2016 4/19/2016 3/12/2016 4/7/2016 3/2/2016 3/4/2016 3/6/2016 3/8/2016 4/1/2016 4/3/2016 4/5/2016 4/9/2016 Group1 Group2 Group3 Group4 Reference

  8. Results print paper 50 45 40 NPE 35 30 25 20 2/29/2016 3/10/2016 3/14/2016 3/16/2016 3/18/2016 3/20/2016 3/22/2016 3/24/2016 3/26/2016 3/28/2016 3/30/2016 4/11/2016 4/13/2016 4/17/2016 4/19/2016 3/12/2016 4/15/2016 3/2/2016 3/4/2016 3/6/2016 3/8/2016 4/1/2016 4/3/2016 4/5/2016 4/7/2016 4/9/2016 Group1 Group2 Group3 Group4 Reference

  9. Results Aluminum 50 45 40 NPE 35 30 25 20 2/29/2016 3/10/2016 3/12/2016 3/14/2016 3/16/2016 3/18/2016 3/20/2016 3/22/2016 3/24/2016 3/26/2016 3/28/2016 3/30/2016 4/11/2016 4/13/2016 4/15/2016 4/17/2016 4/19/2016 4/9/2016 3/2/2016 3/4/2016 3/6/2016 3/8/2016 4/1/2016 4/3/2016 4/5/2016 4/7/2016 Group1 Group2 Group3 Group4 Reference

  10. Results tyvek 50 45 40 NPE 35 30 25 20 2/29/2016 3/10/2016 3/12/2016 3/16/2016 3/18/2016 3/20/2016 3/22/2016 3/24/2016 3/26/2016 3/28/2016 3/30/2016 4/11/2016 4/13/2016 4/15/2016 4/17/2016 4/19/2016 3/14/2016 3/2/2016 3/4/2016 3/6/2016 3/8/2016 4/1/2016 4/3/2016 4/5/2016 4/7/2016 4/9/2016 Group1 Group2 Group3 Group4 Reference

Related


More Related Content