Pennsylvania Turnpike Commission Public Officials Meeting - Total Reconstruction and Widening Project

Slide Note
Embed
Share

The Pennsylvania Turnpike Commission presents the Total Reconstruction and Widening Project for Milepost A53 to A57 in Lehigh County, PA. The project includes stages for construction, stormwater management, and public involvement. Key elements such as side road coordination, project schedule, and typical sections are highlighted. The presentation showcases the progress and future plans for the infrastructure improvements along the turnpike.


Uploaded on Sep 26, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. Pennsylvania Turnpike Commission Welcome to the Public Officials Meeting Welcome to the Public Officials Meeting PRESENTATION TITLE Total Reconstruction and Widening Project Total Reconstruction and Widening Project Milepost A53 to A57 Milepost A53 to A57 Presentation Date April 10, 2017 Lehigh County, PA

  2. Agenda I. I. II. II. III. III. Side Road Coordination Side Road Coordination IV. IV. Stormwater Management Stormwater Management V. V. Project Schedule Project Schedule VI. VI. Public Involvement Public Involvement VII. VII. Open Discussion Open Discussion Welcome and Introductions Welcome and Introductions Project Overview Project Overview TOTAL RECONSTRUCTION AND WIDENING PROJECT MILEPOST A53 TO A57

  3. Project Location TOTAL RECONSTRUCTION AND WIDENING PROJECT MILEPOST A53 TO A57

  4. Typical Section TOTAL RECONSTRUCTION AND WIDENING PROJECT MILEPOST A53 TO A57

  5. Stage 1 Construction While Widening to the Outside Keep Traffic in Existing Lanes TOTAL RECONSTRUCTION AND WIDENING PROJECT MILEPOST A53 TO A57

  6. Stage 2 Construction Reconstruct Original Roadway TOTAL RECONSTRUCTION AND WIDENING PROJECT MILEPOST A53 TO A57

  7. Construction Completed 122 Typical Section TOTAL RECONSTRUCTION AND WIDENING PROJECT MILEPOST A53 TO A57

  8. SR 2012 (Lower Macungie Road) over Mainline Bridge No. NB336, MPA53.38 NB-336 MP A-53.38 Little Spur Little Spur Mill Race Road TOTAL RECONSTRUCTION AND WIDENING PROJECT MILEPOST A53 TO A57

  9. SR 2012 (Lower Macungie Road) over Mainline Bridge No. NB336, MPA53.38 Thru Plate Girder Span 114.67 feet Thru Plate Girder Bridge Span = 114.67 feet TOTAL RECONSTRUCTION AND WIDENING PROJECT MILEPOST A53 TO A57

  10. T471 (East Texas Road) over Mainline Bridge No. NB338, MP A54.29 NB-338 MP A-54.29 TOTAL RECONSTRUCTION AND WIDENING PROJECT MILEPOST A53 TO A57

  11. T-471 (East Texas Road) over Mainline Bridge No. NB338, MP A54.29 Three Span Cantilever Deck I-Beam Bridge Span = 154 feet 3 Span Cantilever Deck I-Beam Span 154 feet TOTAL RECONSTRUCTION AND WIDENING PROJECT MILEPOST A53 TO A57

  12. SR 6222 (Hamilton Boulevard) over Mainline Bridge No. NB341, MP A55.31 NB-341 MP A-55.31 TOTAL RECONSTRUCTION AND WIDENING PROJECT MILEPOST A53 TO A57

  13. SR 6222 (Hamilton Boulevard) over Mainline Bridge No. NB341, MP A55.31 Deck I-Beam Bridge Span = 74.64 feet Deck I-Beam Span 74.64 feet TOTAL RECONSTRUCTION AND WIDENING PROJECT MILEPOST A53 TO A57

  14. Interstate 78 over Mainline and Plaza Ramp Bridge No. S-23021, MP A56.18 S-23021 MP A-56.18 TOTAL RECONSTRUCTION AND WIDENING PROJECT MILEPOST A53 TO A57

  15. Interstate 78 over Mainline and Plaza Ramp Bridge No. S-23021, MP A56.18 Deck Welded I-Beam Bridge Span = 150 feet Steel Welded I- Beam Span 150 feet TOTAL RECONSTRUCTION AND WIDENING PROJECT MILEPOST A53 TO A57

  16. Mainline over SR 3008 (Cetronia Road) Bridge No. NB346, MP A56.28 NB-346 MP A-56.28 TOTAL RECONSTRUCTION AND WIDENING PROJECT MILEPOST A53 TO A57

  17. Mainline over SR 3008 (Cetronia Road) Bridge No. NB346, MP A56.28 Three Span Continuous Deck I-Beam 3 Span Continuous Deck I-Beam Span 127 feet Bridge Span = 127 feet TOTAL RECONSTRUCTION AND WIDENING PROJECT MILEPOST A53 TO A57

  18. SR 1002 (Tilghman Street) over Mainline Bridge No. NB349, MP A57.06 NB-349 MP A-57.06 TOTAL RECONSTRUCTION AND WIDENING PROJECT MILEPOST A53 TO A57

  19. SR 1002 (Tilghman Street) over Mainline Bridge No. NB349, MP A57.06 Three Span Cantilever Deck I-Beam Bridge Span = 217.5 feet 3 Span Cantilever Deck I-Beam Span 217.5 feet Post and Panel Retaining Wall TOTAL RECONSTRUCTION AND WIDENING PROJECT MILEPOST A53 TO A57

  20. Lehigh Valley Interchange Mainline Bridge over SR 0022 Ramp Bridge over SR 0022 Interchange Ramp Bridge TOTAL RECONSTRUCTION AND WIDENING PROJECT MILEPOST A53 TO A57

  21. Stormwater Management Approved Act 167 Plans Little Lehigh Creek Act 167 Township Ordinances South Whitehall Township Upper Macungie Township Lower Macungie Township PaDEP Chapter 102 TOTAL RECONSTRUCTION AND WIDENING PROJECT MILEPOST A53 TO A57

  22. Project Schedule Preliminary Design Side Road Coordination Field Surveys Traffic Data Collection Environmental Studies Geotechnical Studies Utilities Locating Roadway and Bridge Design Drainage and Stormwater Management Design Advanced Overhead Bridge Replacements Mainline Turnpike Reconstruction Right-of-Way Acquisition Process TOTAL RECONSTRUCTION AND WIDENING PROJECT MILEPOST A53 TO A57

  23. Public Involvement Notice of Intent to Enter Letters Mailed to residents north of SR 222 on October 14, 2015 Mailed to residents south of SR 222 on February 15, 2016 Advanced Overhead Bridge Replacements Public Meeting in Final Design Mainline Turnpike Reconstruction Public Meeting in Final Design Contact Information Brian F. Mostek, PE Engineer Project Manager Pennsylvania Turnpike Commission (717) 831-7101 bmostek@paturnpike.com TOTAL RECONSTRUCTION AND WIDENING PROJECT MILEPOST A53 TO A57

  24. Open Discussion Questions? Thank you for attending. Contact Information Brian F. Mostek, PE Engineer Project Manager Pennsylvania Turnpike Commission (717) 831-7101 bmostek@paturnpike.com TOTAL RECONSTRUCTION AND WIDENING PROJECT MILEPOST A53 TO A57