About KEDCO
Coverage States
     Kano, Katsina and Jigawa
Area
 
covered
     67,128
 
km2
MYTO
 
load
 
allocation
     8% (6.7% actual)
Staff Strength
     3293
Regions
     14 Regions
Customer Number
     700,000+
Transmission Sources
     14 Transmission Stations
Assets and Inventory of KEDCO
Kano Electricity Distribution Company (KEDCO) is a utility company licensed to distribute electricity within Kano, Jigawa and
Katsina States. Futures Energy Africa (FEA) is the company core investor with 60% stake while the Bureau of Public Enterprise (BPE)/
MOFI, own 40% stake on behalf of the Federal Government of Nigeria.
 
Reliability
Excellence
68 
33kV Feeders
8850
 Distribution Transformers
42
 Injection Substations
202
 Customer Service Points
61
 Technical Service Points
123 
11kV Feeders
Network
Mission
To be an efficient power distributor focused on customer
satisfaction.
To enable re-industrialization and economic empowerment
through safe and reliable power distribution
Vision
KEDCO’s DER plan will allow the DisCo to
accelerate
 the 
replacement of aging
infrastructure 
and 
increase
 its 
capacity
 to 
meet
growing demand
 by 
integrating centralized 
and
decentralized energy solutions.
KEDCO intends to leverage 
partnerships
 with
Electricity Supply Companies (ESCOs) 
to
resolve the 
energy shortage 
and 
quality issues
faced in the 
franchise area.
KEDCO
KEDCO
The company has undertaken full
clustering
 and 
segmentation
analysis
 of its 
infrastructure
 and
customer
 
networks
 to appropriately
determine and 
allocate
 sites for
distributed energy supply,
embedded generation and
interconnected Mini-grid solutions
.
Kano Electricity Distribution Plc 
(KEDCO)
Tokarawa 11KV
KEDCO
KEDCO
DISTRIBUTION INVESTMENT REQUIREMENT:
 
NGN284 million
LOCATION:
 
Tokarawa Industrial Area, Kano
RESIDENTIAL
14%
86%
COMMERCIAL & INDUSTRIAL
ESTIMATED LOAD DEMAND:
 
20MW
Overview of Tokarawa Industrial Cluster
KEDCO
KEDCO
Infrastructure
GOOD
ROAD ACCESSIBILITY
GOOD
SECURITY STATUS
NO
PIP FOCUSED AREA
Top 3 Economic Activities
1. Manufacturing
2. Processing
3. Packaging & Marketing
Feeder Route
Length
22km
Voltage Level
11KV
Daily Load Profile
4.1 MWh
Network Limitations
There are no transmission bottlenecks
on the feeder
Approx. Installed
Transformer
Capacity
30,000KVA
GOOD
STATE OF NETWORK
KEDCO
KEDCO
BAGAUDA
33KV
KEDCO
KEDCO
DISTRIBUTION INVESTMENT REQUIREMENT:
 
NGN260 million
LOCATION:
 
Kura & Karfi Rice Millers, Kano
RESIDENTIAL
5%
95%
COMMERCIAL & INDUSTRIAL
ESTIMATED LOAD DEMAND:
 
2.5MW
Overview of Kura & Karfi Cluster
KEDCO
KEDCO
Infrastructure
GOOD
ROAD ACCESSIBILITY
GOOD
SECURITY STATUS
NO
PIP FOCUSED AREA
Top 3 Economic Activities
1. Rice Milling
2. Processing & Bagging
3. Trading & Marketing
Feeder Route
Length
487km
Voltage Level
33KV
Daily Load Profile
8.4 MWh
Network Limitations
Lengthy feeder resulting in poor supply.
Installed
Transformer
Capacity
1000KVA
FAIR
STATE OF NETWORK
KEDCO
KEDCO
KARKASARA
11KV
KEDCO
KEDCO
DISTRIBUTION INVESTMENT REQUIREMENT:
 
NGN138 million
LOCATION:
 
Ado Bayero City/ Family House Estate Darmanawa
(Gandun Sarki), Kano
RESIDENTIAL
94%
6%
COMMERCIAL & INDUSTRIAL
ESTIMATED LOAD DEMAND:
 
2
MW
Overview of Ado Bayero & FHE Cluster
KEDCO
KEDCO
Infrastructure
GOOD
ROAD ACCESSIBILITY
GOOD
SECURITY STATUS
NO
PIP FOCUSED AREA
Top 3 Economic Activities
1.
Residencial
2.
Petty Trading
Feeder Route
Length
19km
Voltage Level
11KV
Daily Load Profile
6.5 MWh
Network Limitations
There is no transmission bottleneck on
the feeder
Installed
Transformer
Capacity
1500KVA
FAIR
STATE OF NETWORK
KEDCO
KEDCO
NBC/ CERAMIC
11KV
KEDCO
KEDCO
DISTRIBUTION INVESTMENT REQUIREMENT:
 
NGN 140 million
LOCATION:
 
Chalawa Phase 2, Kano
RESIDENTIAL
15%
85%
COMMERCIAL & INDUSTRIAL
ESTIMATED LOAD DEMAND:
 
15
 
MW
Overview of Chalawa Industrial Cluster
KEDCO
KEDCO
Infrastructure
GOOD
ROAD ACCESSIBILITY
GOOD
SECURITY STATUS
NO
PIP FOCUSED AREA
Top 3 Economic Activities
1. Manufacturing
2. Processing & Packaging
3. Trading & Marketing
Feeder Route
Length
8km
Voltage Level
11KV
Daily Load Profile
5 MWh
Network Limitations
There are no transmission bottlenecks
on the feeder.
Approx. Installed
Transformer
Capacity
30,000KVA
FAIR
STATE OF NETWORK
KEDCO
KEDCO
G.R.A 11KV
KEDCO
KEDCO
DISTRIBUTION INVESTMENT REQUIREMENT:
 
NGN137 million
LOCATION:
 
Barhim Estate, Katsina
RESIDENTIAL
92%
8%
COMMERCIAL & INDUSTRIAL
ESTIMATED LOAD DEMAND:
 
3
MW
Overview of Barhim Estate Cluster
KEDCO
KEDCO
Infrastructure
GOOD
ROAD ACCESSIBILITY
GOOD
SECURITY STATUS
NO
PIP FOCUSED AREA
Top 3 Economic Activities
1.
Residential
2.
Petty Trading
Feeder Route
Length
17km
Voltage Level
11KV
Daily Load Profile
6.8 MWh
Network Limitations
Inadequate grid supply resulting in poor
supply.
Installed
Transformer
Capacity
1500KVA
FAIR
STATE OF NETWORK
KEDCO
KEDCO
Summary of KEDCO DER
KEDCO
KEDCO
THANK
YOU
KEDCO
KEDCO
Slide Note
Embed
Share

KEDCO is a utility company licensed to distribute electricity in Kano, Jigawa, and Katsina States with a focus on customer satisfaction and reliability. It is working on a Distributed Energy Resources (DER) plan to enhance infrastructure and meet growing energy demand through partnerships with embedded generation and ESCOs. The company aims to address energy shortages and quality issues in its franchise area, particularly focusing on the Tokarawa Industrial Cluster in Kano. KEDCO's core values include excellence, reliability, and integrity to enable re-industrialization and economic empowerment.

  • KEDCO
  • Electricity Distribution
  • DER Plan
  • Energy Solutions
  • Customer Satisfaction

Uploaded on Sep 23, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. KEDCO ABUJA ELECTRICITY DISTRIBUTION COMPANY DER OPPORTUNITIES KANO ELECTRICITY DISTRIBUTION PLC P R E S E N T A T I O N

  2. KEDCO About KEDCO Kano Electricity Distribution Company (KEDCO) is a utility company licensed to distribute electricity within Kano, Jigawa and Katsina States. Futures Energy Africa (FEA) is the company core investor with 60% stake while the Bureau of Public Enterprise (BPE)/ MOFI, own 40% stake on behalf of the Federal Government of Nigeria. Assets and Inventory of KEDCO Network Coverage States Kano, Katsina and Jigawa Core Values 68 33kV Feeders Area covered 67,128 km2 123 11kV Feeders Excellence Reliability Integrity 42 Injection Substations MYTO load allocation 8% (6.7% actual) 8850 Distribution Transformers 202 Customer Service Points Staff Strength 3293 Equity Innovation 61 Technical Service Points Regions 14 Regions Mission To be an efficient power distributor focused on customer Excellence Reliability satisfaction. Customer Number 700,000+ Vision To enable re-industrialization and economic empowerment through safe and reliable power distribution Transmission Sources 14 Transmission Stations

  3. KEDCO Kano Electricity Distribution Plc (KEDCO) The company has undertaken full KEDCO s DER plan will allow the DisCo to clustering and segmentation accelerate the replacement of aging analysis of its infrastructure and infrastructure and increase its capacity to meet customernetworks to appropriately growing demand by integrating centralized and determine and allocate sites for decentralized energy solutions. distributed energy supply, KEDCO intends to leverage partnerships with embedded generation and Electricity Supply Companies (ESCOs) to interconnected Mini-grid solutions. resolve the energy shortage and quality issues faced in the franchise area.

  4. KEDCO Tokarawa 11KV

  5. KEDCO Overview of Tokarawa Industrial Cluster S/N S/N DESCRIPTION DESCRIPTION VALUE VALUE 1. 1. Average Hours of Supply Average Hours of Supply 20.28 Hours 2. 2. Number of Connections Number of Connections 220 3. 3. Estimated Customer Population Estimated Customer Population 1,000 4. 4. ATC&C Loss ATC&C Loss 25% 5. 5. Metering Penetration Metering Penetration 85% 6. 6. Average Monthly Collections Average Monthly Collections NGN57.5 million LOCATION: Tokarawa Industrial Area, Kano ESTIMATED LOAD DEMAND: 20MW 20MW DISTRIBUTION INVESTMENT REQUIREMENT: NGN284 million 14% 86% RESIDENTIAL COMMERCIAL & INDUSTRIAL

  6. KEDCO Infrastructure Top 3 Economic Activities GOOD STATE OF NETWORK 1. Manufacturing 2. Processing 3. Packaging & Marketing GOOD ROAD ACCESSIBILITY Feeder Route Length Voltage Level Daily Load Profile Approx. Installed Transformer Capacity 30,000KVA 30,000KVA 11KV 11KV GOOD 22km 22km 4.1 MWh 4.1 MWh SECURITY STATUS Network Limitations There are no transmission bottlenecks on the feeder Business Model Embedded Generation/ IPP Solar Hybrid NO PIP FOCUSED AREA

  7. KEDCO BAGAUDA 33KV

  8. KEDCO Overview of Kura & Karfi Cluster S/N S/N DESCRIPTION DESCRIPTION VALUE VALUE 1. 1. Average Hours of Supply Average Hours of Supply 12.23 Hours 2. 2. Number of Connections Number of Connections 100 3. 3. Estimated Customer Population Estimated Customer Population 300 4. 4. ATC&C Loss ATC&C Loss 57% 5. 5. Metering Penetration Metering Penetration 10% 6. 6. Average Monthly Collections Average Monthly Collections NGN13.3 million LOCATION: Kura & Karfi Rice Millers, Kano ESTIMATED LOAD DEMAND: 2.5MW 2.5MW DISTRIBUTION INVESTMENT REQUIREMENT: NGN260 million 5% 95% RESIDENTIAL COMMERCIAL & INDUSTRIAL

  9. KEDCO Infrastructure Top 3 Economic Activities FAIR STATE OF NETWORK 1. Rice Milling 2. Processing & Bagging 3. Trading & Marketing GOOD ROAD ACCESSIBILITY Feeder Route Length Voltage Level Daily Load Profile Installed Transformer Capacity 1000KVA 1000KVA GOOD 487km 487km 33KV 33KV 8.4 MWh 8.4 MWh SECURITY STATUS Network Limitations Lengthy feeder resulting in poor supply. Business Model Interconnected Mini-grid NO PIP FOCUSED AREA

  10. KEDCO KARKASARA 11KV

  11. KEDCO Overview of Ado Bayero & FHE Cluster S/N S/N DESCRIPTION DESCRIPTION VALUE VALUE 1. 1. Average Hours of Supply Average Hours of Supply 8.05 Hours 2. 2. Number of Connections Number of Connections 70 3. 3. Estimated Customer Population Estimated Customer Population 280 4. 4. ATC&C Loss ATC&C Loss 67% 5. 5. Metering Penetration Metering Penetration 88.57% 6. 6. Average Monthly Collections Average Monthly Collections NGN18 million LOCATION: Ado Bayero City/ Family House Estate Darmanawa (Gandun Sarki), Kano ESTIMATED LOAD DEMAND: 2MW MW DISTRIBUTION INVESTMENT REQUIREMENT: NGN138 million 94% 6% RESIDENTIAL COMMERCIAL & INDUSTRIAL

  12. KEDCO Infrastructure Top 3 Economic Activities FAIR STATE OF NETWORK 1. Residencial 2. Petty Trading GOOD ROAD ACCESSIBILITY Feeder Route Length Voltage Level Daily Load Profile Installed Transformer Capacity 1500KVA 1500KVA GOOD 19km 19km 11KV 11KV 6.5 MWh 6.5 MWh SECURITY STATUS Network Limitations There is no transmission bottleneck on the feeder Business Model Interconnected Mini-grid NO PIP FOCUSED AREA

  13. KEDCO NBC/ CERAMIC 11KV

  14. KEDCO Overview of Chalawa Industrial Cluster S/N S/N DESCRIPTION DESCRIPTION VALUE VALUE 1. 1. Average Hours of Supply Average Hours of Supply 22.55 Hours 2. 2. Number of Connections Number of Connections 100 3. 3. Estimated Customer Population Estimated Customer Population 200 4. 4. ATC&C Loss ATC&C Loss 24% 5. 5. Metering Penetration Metering Penetration 75% 6. 6. Average Monthly Collections Average Monthly Collections NGN123.5 million LOCATION: Chalawa Phase 2, Kano ESTIMATED LOAD DEMAND: 15 MW MW DISTRIBUTION INVESTMENT REQUIREMENT: NGN 140 million 15% 85% RESIDENTIAL COMMERCIAL & INDUSTRIAL

  15. KEDCO Infrastructure Top 3 Economic Activities FAIR STATE OF NETWORK 1. Manufacturing 2. Processing & Packaging 3. Trading & Marketing GOOD ROAD ACCESSIBILITY Feeder Route Length Voltage Level Daily Load Profile Approx. Installed Transformer Capacity 30,000KVA 30,000KVA GOOD 8km 8km 11KV 11KV 5 MWh 5 MWh SECURITY STATUS Network Limitations There are no transmission bottlenecks on the feeder. Business Model Embedded Generation/ IPP Solar Hybrid NO PIP FOCUSED AREA

  16. KEDCO G.R.A 11KV

  17. KEDCO Overview of Barhim Estate Cluster S/N S/N DESCRIPTION DESCRIPTION VALUE VALUE 1. 1. Average Hours of Supply Average Hours of Supply 11.03 Hours 2. 2. Number of Connections Number of Connections 500 4. 4. Estimated Customer Population Estimated Customer Population 600 5. 5. ATC&C Loss ATC&C Loss 22.3% 6. 6. Metering Penetration Metering Penetration 85% 7. 7. Average Monthly Collections Average Monthly Collections NGN 31.4 million LOCATION: Barhim Estate, Katsina ESTIMATED LOAD DEMAND: 3MW MW DISTRIBUTION INVESTMENT REQUIREMENT: NGN137 million 92% 8% RESIDENTIAL COMMERCIAL & INDUSTRIAL

  18. KEDCO Infrastructure Top 3 Economic Activities FAIR STATE OF NETWORK 1. Residential 2. Petty Trading GOOD ROAD ACCESSIBILITY Feeder Route Length Voltage Level Daily Load Profile Installed Transformer Capacity 1500KVA 1500KVA GOOD 17km 17km 11KV 11KV 6.8 MWh 6.8 MWh SECURITY STATUS Network Limitations Inadequate grid supply resulting in poor supply. Business Model Interconnected Mini-grid NO PIP FOCUSED AREA

  19. KEDCO Summary of KEDCO DER Average Monthly Collections (NGN) m Distribution Investment Required (NGN) m Installed Distribition Transformer Capacity (kVA) Estimated Load Demand (MW) Number of Connections Proposed Business Model S/N Project Embedded Generation/ IPP Solar Hybrid 1 20 220 57.5 284 30,000 Tokarawa 11KV Interconnected Mini- grid 2 Bagauda 33KV 2.5 100 13.3 260 1000kVA Interconnected Mini- grid 3 Karkasara 11KV 2 70 18 138 1500kVA Embedded Generation/ IPP Solar Hybrid 4 NBC/Ceramic 11KV 15 100 123.5 140 30,000KVA Interconnected Mini- grid 5 G.R.A. 11KV 3 500 31.3 137 1500kVA

  20. KEDCO THANK YOU

More Related Content

giItT1WQy@!-/#giItT1WQy@!-/#giItT1WQy@!-/#giItT1WQy@!-/#giItT1WQy@!-/#giItT1WQy@!-/#giItT1WQy@!-/#giItT1WQy@!-/#giItT1WQy@!-/#giItT1WQy@!-/#giItT1WQy@!-/#giItT1WQy@!-/#