Managing Urban Stormwater Runoff: North Hennepin Community College MS4 Plan

Slide Note
Embed
Share

North Hennepin Community College is designated as an MS4 due to its location in an urban area, aiming to treat urban stormwater runoff and improve water quality. The MS4 Plan includes implementing six minimum control measures, such as public education, illicit discharge detection, and construction site runoff control.


Uploaded on Aug 31, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. North Hennepin Community College MS4 Plan October 24, 2014 NHCC Logo

  2. Background First, what does MS4 stand for? Small Municipal Separate Storm Sewer Systems (MS4) Why is North Hennepin Community College an MS4? MnSCU campuses located in an urban area were designated by the Minnesota Pollution Control Agency as an MS4 in 2006 What is the goal of an MS4 Plan? To maintain and improve waters of the state through treatment of urban storm water runoff. NHCC Logo

  3. What is required by an MS4 Plan? Implement six minimum control measures (MCMs) Public education and outreach Public participation and involvement Illicit discharge detection and elimination Construction site runoff control Post construction site runoff control Pollution prevention/good housekeeping NHCC Logo

  4. MCM I Public Education and Outreach Distribute education materials Public participation Education program Annual public meeting NHCC Logo

  5. MCM II Public Participation/ Involvement Public notice of annual meeting Solicit public input Consider public input Annual campus clean-up event NHCC Logo

  6. MCM III Illicit Discharge Detection and Elimination Storm sewer map Regulatory control program Detection plan Public and employee information program NHCC Logo

  7. MCM IV Construction Site Storm water run-off control Construction site erosion and sediment control BMPs Waste control BMPs Site plan reviews Procedure for complaints of storm water non-compliance Site inspection and enforcement NHCC Logo

  8. MCM V Post Construction Site Run-off Control Development of structural and non-structural storm water BMPs Regulatory mechanisms for compliance Long-term O & M of BMPs NHCC Logo

  9. MCM VI Pollution Prevention/Good Housekeeping Maintenance program Street sweeping Annual inspections Record keeping Impaired waters review Annual report NHCC Logo

  10. Questions? Please Contact: Tim Morrell NHCC Safety and Health Officer 763-488-03-132 NHCC Logo