ERCOT RTCBTF Policy Update and NPRR Incorporation

nprr for rtc b policy issues n.w
1 / 7
Embed
Share

Stay informed about the latest developments in ERCOT's Real-Time Co-optimization and Balancing Task Force (RTCBTF) policy issues. Learn about the challenges, solutions, and upcoming discussions regarding policy parameters that need NPRR incorporation. Stay ahead with key insights into AS Proxy Offer Floors, Scaling Factors, Ramp Rate Sharing, and more.

  • ERCOT
  • Policy Update
  • NPRR
  • RTCBTF
  • Protocol

Uploaded on | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. NPRR for RTC+B policy issues Matt Mereness RTCBTF November 13, 2024

  2. Update on RTCBTF Policy Parameters - When RTCTF developed RTC key principles and protocols in 2019-2020 with MPs there was agreement to focus on mechanics of RTC design and not get stuck on challenging or technical details that could be resolved at a later date and implemented as parameters. ERCOT flagged those items as TAC approved parameters for RTC in protocols: - Example: Grey-boxed Protocol 6.5.7.3 (5) (d) Proxy Ancillary Service Offer price floors shall be approved by TAC and posted on the ERCOT website. This current approach has some issues: - In recent years, ERCOT has been migrating away from Other Binding documents, such as TAC approved processes or values. - It is worth noting these values were not designated as TAC approved so they could be frequently changed, rather they were deferred until they could be settled. - There is a risk that some issues may be controversial and the TAC approved parameter may be appealed with no clear governance to follow to ensure timely resolution. - - 2 2 Public

  3. Parameters/Policy Needing NPRR ERCOT will work with RTCBTF to sponsor a single NPRR to incorporate the TAC- and Board-approved items and values into the Protocols: AS Proxy Offer Floors Ramp Rate Sharing ASDCs for RUC Ancillary Services Duration Requirements (State of Charge) 3 Public

  4. Parameters/Policy Needing NPRR AS Proxy Offer Floors- Dave leading discussion Grey-boxed Protocol 6.5.7.3 (5) (d) Proxy Ancillary Service Offer price floors shall be approved by TAC and posted on the ERCOT website. Targeting Sept-Nov 2024 On agenda today 4 Public

  5. Parameters/Policy Needing NPRR Scaling Factors/Ramp Rate Sharing- Abhi leading discussion Note this was not a TAC-approved item, rather a loose-end to confirm, and RTCBTF provided feedback that protocols would be best. Targeting discussion Sept 2024-Dec 2024 Potentially additional language in grey-boxed Section 6.5.7.3 (12) grey box (12) SCED will enforce Resource-specific Ancillary Service constraints to ensure that Ancillary Service awards are aligned with a Resource s qualifications and telemetered Ancillary Service capabilities. a) A scaling factor of 5/7 shall be used for Regulation Up award when ensuring that the SCED Base Point plus the product of this scaling factor and the Regulation Up award does not exceed HDL b) A scaling factor of 5/7 shall be used for Regulation Down award when ensuring that the SCED Base Point minus the product of this scaling factor and the Regulation Up award does not go below LDL 5 Public

  6. Parameters/Policy Needing NPRR ASDCs for RUC Targeting Dec 2024 Feb 2025 (may move a month later) TBD, likely Protocol section 5.5.2 Ancillary Services Duration Requirements (State of Charge) Targeting Jan-March 2025 Revisit and/or confirm current posture of AS duration requirements NPRR1096- Require Sustained Two-Hour Capability for ECRS and Four-Hour Capability for Non-Spin NPRR1186- Improvements Prior to the RTC+B Project for Better ESR State of Charge Awareness, Accounting, and Monitoring 6 Public

  7. Timeline for NPRR Timeline ERCOT can frame up the applicable sections of protocols and file NPRR in December 2024 or January 2025 In parallel, RTCBTF can be vetting the values and filling in the blanks/values MP can document positions in NPRR formal comments Target completing RTCBTF analysis by March to then move NPRR though stakeholder process. Best before trials start in early May 2025): RTCBTF discussions in meetings (Nov2024-Feb2024) Potentially add a RTCBTF meeting in early March PRS Approval March 12, 2025 (assumes Urgent status) TAC approval March 26, 2025 Board approval April 8, 2025 PUCT consideration May 15, 2025 7 Public