Enhancing Eco-Mobility in Austro-Hungarian Border Region: EMAH Project

 
Initial proposals for the promotion
 of eco-mobility in
the Austro-Hungarian border region
EMAH project
 
Álmos VIRÁG, project leader
Reasons 
for
 improvements
 
6300 passengers crossed
the border by train (May
2013)
 
49200 vehicles crossed
the border
avg. vehicle occupancy
(based on the interviews):
1.74
according to th
is
, the
number of passengers of
individual traffic:
85600 ps.
On weekdays (Tuesday, Friday), a total of
 
T
h
e
 
a
a
p
p
p
p
r
r
o
o
x
x
i
i
m
m
a
a
t
t
e
e
 
r
a
t
i
o
 
o
f
 
t
h
e
 
t
w
o
 
t
r
a
n
s
p
o
r
t
 
s
e
c
t
o
r
s
:
 
7
:
9
3
Railway
 line 
512
: Deutschkreutz 
– Ebenfurth [–Wien]
 
Direct trains towards
Eisenstadt
At peak hours, every 2nd
train goes to Eisenstadt?
Direct buses?
 
More frequent trains at
off-peak times
Railway line 524
: Sopron – Wiener Neustadt
 
Increase in capacity
Electrification
Newer trains with larger
capacity
Possibility to run direct
trains to Győr or
Szombathely
Railway line 530
: Szentgotthárd – Graz
 
New schedule: design of a
zone-based structure
(internal endpoint: Feldbach
or Gleisdorf)
Provided that the
electrification and the double-
track sections are completed
Railway line 700: Győr – Bruck/Leitha [–Wien]
 
Direct connections
section between
Bruck/Leitha and Wien
would get more crowded
equalisation of mileages can
also cause problems
Extension of the operation
time
 
Railway line 731: Fertőszentmiklós – Neusiedl/See
 
More comprehensible and
predictable timetables
abolition of the complex,
seasonal constraints
trains getting to Hungary
more frequently
Refurbishment of the
Hungarian tracks
track speed from 60 to 100 km/h
Preliminary s
uggestions for the extension of
 
the 
public bus network
(passenger numbers were calculated for 2x3 hours
 
morning and afternoon peak time
 
by the interviews )
Szentgotthárd–Heiligenkreuz–Fürstenfeld
:
230 passenger
s
/dir
ec
tion
Szombathely–Oberwart–Friedberg
:
768 passenger
s
/direction
[Szombathely–] Kőszeg–Oberpullendorf–
Deutschkreutz–Sopron–Eisenstadt:
Kőszeg
:
 245 passenger
s
/direction
Deutschkreutz: 297 pass./direction
Klingenbach: 1425 pass./direction
Occur
r
ing
 questions and problems
 
Who will perform 
the service
?
Is 
cabotage
 possible?
Hungary: the transborder traffic can also be ordered as
a 
public service
How does it work in Austria?
Fares
 (tariffs structure, discounts)
Rate of transport price subsidies?
Co-operation of the 
regional services
Managing of differences in mileages
Creation of an integrated schedule
 
Thanks for your attention!
Questions
?
Slide Note
Embed
Share

Initial proposals aim to promote eco-mobility in the Austro-Hungarian border region through improvements in railway lines, such as increasing capacity, electrification, and introducing new schedules. Recommendations include enhancing the public bus network and optimizing train services to accommodate the significant passenger and vehicle traffic between the countries.

  • Eco-mobility
  • Austro-Hungarian border
  • Railway lines
  • Public bus network
  • Transportation

Uploaded on Sep 25, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. Kzlekedstudomnyi Intzet Wirtschaftsuniversitaet Wien Initial proposals for the promotion of eco-mobility in the Austro-Hungarian border region EMAH project Home lmos VIR G, project leader

  2. Reasons for improvements On weekdays (Tuesday, Friday), a total of 6300 passengers crossed the border by train (May 2013) 49200 vehicles crossed the border avg. vehicle occupancy (based on the interviews): 1.74 according to this, the number of passengers of individual traffic: 85600 ps. The approximate ratio of the two transport sectors: 7:93

  3. Railway line 512: Deutschkreutz Ebenfurth [Wien] Direct trains towards Eisenstadt At peak hours, every 2nd train goes to Eisenstadt? Direct buses? More frequent trains at off-peak times

  4. Railway line 524: Sopron Wiener Neustadt Increase in capacity Electrification Newer trains with larger capacity Possibility to run direct trains to Gy r or Szombathely

  5. Railway line 530: Szentgotthrd Graz New schedule: design of a zone-based structure (internal endpoint: Feldbach or Gleisdorf) Provided that the electrification and the double- track sections are completed

  6. Railway line 700: Gyr Bruck/Leitha [Wien] Direct connections section between Bruck/Leitha and Wien would get more crowded equalisation of mileages can also cause problems Extension of the operation time

  7. Railway line 731: Fertszentmikls Neusiedl/See More comprehensible and predictable timetables abolition of the complex, seasonal constraints trains getting to Hungary more frequently Refurbishment of the Hungarian tracks track speed from 60 to 100 km/h

  8. Preliminary suggestions for the extension of the public bus network (passenger numbers were calculated for 2x3 hours morning and afternoon peak time by the interviews ) [Szombathely ] K szeg Oberpullendorf Deutschkreutz Sopron Eisenstadt: K szeg: 245 passengers/direction Deutschkreutz: 297 pass./direction Klingenbach: 1425 pass./direction Szombathely Oberwart Friedberg: 768 passengers/direction Szentgotth rd Heiligenkreuz F rstenfeld: 230 passengers/direction

  9. Occurring questions and problems Who will perform the service? Is cabotage possible? Hungary: the transborder traffic can also be ordered as a public service How does it work in Austria? Fares (tariffs structure, discounts) Rate of transport price subsidies? Co-operation of the regional services Managing of differences in mileages Creation of an integrated schedule

  10. Thanks for your attention! Questions?