Enhancing Eco-Mobility in Austro-Hungarian Border Region: EMAH Project

Slide Note
Embed
Share

Initial proposals aim to promote eco-mobility in the Austro-Hungarian border region through improvements in railway lines, such as increasing capacity, electrification, and introducing new schedules. Recommendations include enhancing the public bus network and optimizing train services to accommodate the significant passenger and vehicle traffic between the countries.


Uploaded on Sep 25, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. Kzlekedstudomnyi Intzet Wirtschaftsuniversitaet Wien Initial proposals for the promotion of eco-mobility in the Austro-Hungarian border region EMAH project Home lmos VIR G, project leader

  2. Reasons for improvements On weekdays (Tuesday, Friday), a total of 6300 passengers crossed the border by train (May 2013) 49200 vehicles crossed the border avg. vehicle occupancy (based on the interviews): 1.74 according to this, the number of passengers of individual traffic: 85600 ps. The approximate ratio of the two transport sectors: 7:93

  3. Railway line 512: Deutschkreutz Ebenfurth [Wien] Direct trains towards Eisenstadt At peak hours, every 2nd train goes to Eisenstadt? Direct buses? More frequent trains at off-peak times

  4. Railway line 524: Sopron Wiener Neustadt Increase in capacity Electrification Newer trains with larger capacity Possibility to run direct trains to Gy r or Szombathely

  5. Railway line 530: Szentgotthrd Graz New schedule: design of a zone-based structure (internal endpoint: Feldbach or Gleisdorf) Provided that the electrification and the double- track sections are completed

  6. Railway line 700: Gyr Bruck/Leitha [Wien] Direct connections section between Bruck/Leitha and Wien would get more crowded equalisation of mileages can also cause problems Extension of the operation time

  7. Railway line 731: Fertszentmikls Neusiedl/See More comprehensible and predictable timetables abolition of the complex, seasonal constraints trains getting to Hungary more frequently Refurbishment of the Hungarian tracks track speed from 60 to 100 km/h

  8. Preliminary suggestions for the extension of the public bus network (passenger numbers were calculated for 2x3 hours morning and afternoon peak time by the interviews ) [Szombathely ] K szeg Oberpullendorf Deutschkreutz Sopron Eisenstadt: K szeg: 245 passengers/direction Deutschkreutz: 297 pass./direction Klingenbach: 1425 pass./direction Szombathely Oberwart Friedberg: 768 passengers/direction Szentgotth rd Heiligenkreuz F rstenfeld: 230 passengers/direction

  9. Occurring questions and problems Who will perform the service? Is cabotage possible? Hungary: the transborder traffic can also be ordered as a public service How does it work in Austria? Fares (tariffs structure, discounts) Rate of transport price subsidies? Co-operation of the regional services Managing of differences in mileages Creation of an integrated schedule

  10. Thanks for your attention! Questions?