Clarification Meeting for TNPA RFP at Port of Ngqura

 
 
                    
Date                      : 22
 March
 2023
Venue                   : Port of 
Ngqura, 
TNPA 
Port Administration Building, eLwandle
Boardroom 
 
    
  
 
CLARIFICATION MEETING
TNPA/2023/02/0009/22520/RFP:
ALTERATIONS AND PARTITIONING OF THE eMENDI
BUILDING INCLUDING DESIGN, SUPPLY, INSTALLATION
AND COMMISSIONING OF ELECTRICAL, MECHANICAL,
CIVIL & STRUCTURAL ENGINEERING WORKS AT THE PORT
OF NGQURA FOR A PERIOD OF FIVE (5) MONTHS
 
AGENDA
CLARIFICATION MEETING  TENDER NUMBER 
TNPA/2022/09/1080/12302/RFP
 
AGENDA
CLARIFICATION MEETING  TENDER NUMBER 
TNPA/2022/08/0892/10015/ RFP
 
HOUSE/ MEETING RULES
Adhere to latest Covid 19 Regulations where you are (Level 1);
Please put cellphone on mute during the presentations;
All questions to be raised after each presentation.
Kindly raise your hand, instead of just speaking out of turn;
TNPA will endeavor to answer all questions in the session, however all answers to be responded to in writing
and issued with briefing session minutes.
Questions to be followed-up by email to 
Mpho.mohapi
@transnet.net
 
by COB, Monday, 27 March 2023
(16:00)
Late comers will be allowed; however nothing will be repeated for their benefit.
 
Welcome and Introduction/Safety Induction
Meeting Purpose and Objective
The purpose of this meeting is to clarify the Request for Proposal: 
RFP No:
TNPA/2023/02/0009/22520/RFPadvertised on the 14 March 2023 
on the National Treasury e-Tender
Portal.
The objective of this meeting is to:
Ensure that the Employer’s objectives are well understood.
Building an environment for business (and projects) success.
To report any fraud, tip-offs anonymous: 
0800 003 056 
or 
transnet@tip-offs.com
CLARIFICATION MEETING  TENDER NUMBER TNPA/2022/09/1080/12302/RFP
 
3. Tender Documentation
3. Tender Documentation
Mpho Mohapi
Mpho Mohapi
 
WELCOME AND INTRODUCTIONS
Client / Employer
 
- 
 
Transnet SOC Ltd
Operation Division
 
- 
 
Transnet National Ports Authority – Port of Ngqura
Employer’s Agent 
 
- 
 
Mpho Mohapi
 
(
Mpho.Mohapi@transnet.net
)
Project Manager 
 
- 
 
Siyabonga Tshaka
undefined
 
AGENDA…
Overview of RFP document
:
   
Mpho Mohapi
Tendering Procedure
Returnable Schedule
The (Draft) Contracts
 
The (Draft) Contract & Contract Data
:
 
 Mpho Mohapi
 
OVERVIEW OF RFP DOCUMENT
Part T1: Tendering Procedure
  
T1.1
 
Tender Notice and Invitation to Tender
T1.2
 
Tender Data 
Part T2: Returnable Documents
  
T2.1
 
List of Returnable Documents 
T2.2
 
Returnable Schedules [31 in total (Excl. Agreements and Contract Data)])
Part C1: Agreement and Contract Data
  
C1.1
 
Form of Offer and Acceptance
C1.2
 
Contract Data (Parts 1 & 2)
C1.3
 
Form of security
Part C2: Tendering Procedure
  
C2.1
 
Pricing Instructions &  C2.2    Activity Schedule
Part C3: Scope of Work
 
 
3.1
 
Works Information
Part C4: Site Information
 
 
 
 
PART T1: TENDERING PROCEDURES
C
l
o
s
i
n
g
 
D
a
t
e
:
 
 
 
:
 
 
1
1
 
M
a
r
c
h
 
2
0
2
3
 
a
t
 
1
6
:
0
0
The Transnet e-Tender Submission Portal
      
 
Log on to the Transnet eTenders management platform website 
   
       
   
 
         (https://www.transnet.net);
         
 
Click on “TENDERS”;
         
 
Scroll towards the bottom right hand side of the page;
         
 
On the blue window click on “register on our new eTender Portal”;
         
 
Click on “ADVERTISED TENDERS” to view advertised tenders;
         
 
 Click on “SIGN IN/REGISTER – for bidder to register their information 
  
 
                                                              
 
           (must fill in all  mandatory information);
         
 
Click on “SIGN IN/REGISTER” - to sign in if already registered;
         
 
Toggle (click to switch) the “Log an Intent” button to submit a bid;
         
 
Submit bid documents by uploading them into the system against each          
 
        
          tender selected.
All queries regarding the e-Tender submission to be addressed to  Kabelo Mafohla, email: 
Kabelo.Mafohla@transnet.net
T
e
n
d
e
r
 
V
a
l
i
d
i
t
y
 
P
e
r
i
o
d
 
 
 
 
 
 
 
:
 
1
2
 
W
e
e
k
s
Stages/Procedure for evaluating responsive tenders
PP2 Competitive Selection Procedure (PP2B open procedure)
Financial 80 - Preference 20
 
PART T1: TENDERING PROCEDURES
Eligibility Criteria (Substantive Responsiveness)
Certificate of Attendance at Tender Clarification Meeting must be submitted with the tender
Only those tenderers who are registered with the CIDB, or are capable of being so prior to the evaluation of
submissions, in a contractor grading designation equal to or higher than a contractor grading designation
determined in accordance with the sum tendered or a value determined in accordance with Regulation 25
(1B) or 25(7A) of the Construction Industry Development Regulations, designation of 4GB or higher class of
construction work, are eligible to have their tenders evaluated.
An authorized representative of the tendering entity or a representative of a tendering entity that intends to
form a Joint Venture (JV) must attend the compulsory clarification meeting in terms C2.7
A tenderer having a stipulated minimum B-BBEE status contributor of level 2.
Local Production and content
Quality/Functionality/Technical  – Minimum threshold of 60points
 
PART T2: RETURNABLE DOCUMENTS
T2.1 List of returnable documents
T2.2 Returnable Documents & Schedules
C1.1 Form of offer and acceptance
C1.2 Contract Data Part 2
C2.2 Activity Schedule
 
PART 
C1: AGREEMENT AND CONTRACT DATA
Part 1 Agreements and Contract Data
C1.1 Form of Offer and Acceptance
C1.2 Contract Data Part 1 & 2
C1.3 Forms of Security
Part 2 Pricing Data
C2.1 Pricing Instruction
C2.2 Bill of Quantity
Part C3 Scope of Work
C3.1 Scope of Work (Project Manager)
Part C4 Site Information
C4.1 Site Information (Project Manager)
 
PART 
C1: AGREEMENT AND CONTRACT DATA…
Conditions of Contract
NEC for Engineering Construction Contract
Contract Data Part 1  - Employer
Main Option – B: Priced contract with Bill of Quantity
W1: Dispute resolution procedure
Secondary Options
X2 Changes in the law
X16: Retention
   
5% on all payments certified
X17: Delay damages
  
               R 2 500 per day
X18: Limitation of liability
Z: Additional conditions of contract
 
PART 
C1: AGREEMENT AND CONTRACT DATA…
Z Clauses – Additional conditions of contract
Z1 – 
Obligations in respect of Termination
Z2 – 
Right Reserved by Transnet to Conduct Vetting through SSA
Z3 – 
Additional clause relating to Collusion in the Construction Industry
Z4 – 
Protection of Personal Information Act
Z5 – Additional obligation in respect of Termination
Z6 – 
Additional clause relating to Performance Bonds and/or Guarantees
 
PART 
C1.2 : CONTRACT DATA - 
Contractor
Part two
10. 1 
 
Contractor 
Details;
11.2 (8)
 
The 
direct fee percentage
  
The 
subcontracted fee percentage
24.1 
  
The 
Contractor's
 key persons
 
 
Transnet’s evaluation methodology
S
t
e
p
 
4
Administrative
responsiveness
Substantive
responsiveness
Weighted scoring
/ 100***
Returnable
documents/
schedules
Pre-qualification
Technical / Functional
criteria & weightings
must be stipulated in
the tender documents
WEIGHTED
SCORE
F
u
n
c
t
i
o
n
a
l
i
t
y
/
t
e
c
h
n
i
c
a
l
6
0
p
o
i
n
t
s
S
t
e
p
 
2
S
t
e
p
 
1
S
t
e
p
 
5
S
T
A
G
E
 
1
:
P
R
E
Q
U
A
L
I
F
I
C
A
T
I
O
N
S
T
A
G
E
 
2
S
T
A
G
E
 
3
Award of
business and
conclusion of
contract
Post tender
negotiation with
preferred bidder
[2
nd
 and 3
rd
ranked bidders
(if required) in a
sequential and
not
simultaneous
manner] if
pricing is not
market-related
Price  (80)
B-BBEE
scorecard
(20)
MINIMUM THRESHOLDS
S
t
e
p
 
6
S
t
e
p
 
7
S
t
e
p
 
8
Step 2:
-
- Attendance of compulsory
Briefing session.
CIDB Grading Designation of 6GB
or Higher
Technical Pre-qualification
:
1. 60points Threshold
Selection of the preferred bidder.
(Objective criterion to justify
award to someone other than the
highest ranked bidder must have
been stated in the bid documents
and can be used at this stage, if
applicable)
S
t
e
p
 
3
 
QUESTIONS & ANSWERS
 
 
THANK
 
YOU
Slide Note
Embed
Share

Clarification meeting scheduled for the TNPA RFP at the Port of Ngqura to discuss alterations, building design, civil and structural engineering works, and other related topics. The meeting aims to ensure a clear understanding of the project objectives and requirements outlined in the RFP.

  • Clarification Meeting
  • TNPA RFP
  • Port of Ngqura
  • Engineering Works
  • Construction

Uploaded on Mar 03, 2025 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. CLARIFICATION MEETING TNPA/2023/02/0009/22520/RFP: ALTERATIONS AND BUILDING INCLUDING DESIGN, SUPPLY, INSTALLATION AND COMMISSIONING OF CIVIL & STRUCTURAL ENGINEERING WORKS AT THE PORT OF NGQURA FOR A PERIOD OF FIVE (5) MONTHS PARTITIONING OF THE eMENDI ELECTRICAL, MECHANICAL, Date : 22 March 2023 Venue : Port of Ngqura, TNPA Port Administration Building, eLwandle Boardroom 1

  2. AGENDA Agenda Item 1. Welcome and Introduction 2. Safety Induction Responsible Person 3. Tender Documentation 3.1 Tendering Process and Tender Evaluation procedure 3.2 CIDB: Eligibility Criteria Schedule 3.3 Pre-Qualification Criteria 3.4 Local Production and Content Criteria Schedule 4. Tender Evaluation 6. Tender Evaluation Quality (Functionality) Criteria 6.1 T2.2-03 Previous experience 6.2 T2.2-04 Project Organogram, Management & CV s 6.3 T2.2-05 Method Statement 6.4 T2.2-06 Programme 6.5 T2.2-07 Quality Management 6.6 T2.2-08 Environment 6.7 T2.2-09 Health and Safety 2 CLARIFICATION MEETING TENDER NUMBER TNPA/2022/09/1080/12302/RFP

  3. AGENDA Agenda Item Responsible Person 7. Background on Project and Executive Summaryng Information 8. Scope of Work 9. Conclusion/Signing of T2.2.01 Certificate of Attendance 10. Site Walkabout 3 CLARIFICATION MEETING TENDER NUMBER TNPA/2022/08/0892/10015/ RFP

  4. HOUSE/ MEETING RULES Adhere to latest Covid 19 Regulations where you are (Level 1); Please put cellphone on mute during the presentations; All questions to be raised after each presentation. Kindly raise your hand, instead of just speaking out of turn; TNPA will endeavor to answer all questions in the session, however all answers to be responded to in writing and issued with briefing session minutes. Questions to be followed-up by email to Mpho.mohapi@transnet.net by COB, Monday, 27 March 2023 (16:00) Late comers will be allowed; however nothing will be repeated for their benefit. 4

  5. Welcome and Introduction/Safety Induction Meeting Purpose and Objective The purpose of this meeting is to clarify the Request for Proposal: RFP No: TNPA/2023/02/0009/22520/RFPadvertised on the 14 March 2023 on the National Treasury e-Tender Portal. The objective of this meeting is to: Ensure that the Employer s objectives are well understood. Building an environment for business (and projects) success. To report any fraud, tip-offs anonymous: 0800 003 056 or transnet@tip-offs.com 5 CLARIFICATION MEETING TENDER NUMBER TNPA/2022/09/1080/12302/RFP

  6. 3. Tender Documentation Mpho Mohapi 6

  7. WELCOME AND INTRODUCTIONS Client / Employer - Transnet SOC Ltd Operation Division - Transnet National Ports Authority Port of Ngqura Employer s Agent - Mpho Mohapi(Mpho.Mohapi@transnet.net) Project Manager - Siyabonga Tshaka 7

  8. AGENDA Overview of RFP document: Mpho Mohapi Tendering Procedure Returnable Schedule The (Draft) Contracts The (Draft) Contract & Contract Data: Mpho Mohapi

  9. OVERVIEW OF RFP DOCUMENT Part T1: Tendering Procedure T1.1 Tender Notice and Invitation to Tender T1.2 Tender Data Part T2: Returnable Documents T2.1 List of Returnable Documents T2.2 Returnable Schedules [31 in total (Excl. Agreements and Contract Data)]) Part C1: Agreement and Contract Data C1.1 Form of Offer and Acceptance C1.2 Contract Data (Parts 1 & 2) C1.3 Form of security Part C2: Tendering Procedure C2.1 Pricing Instructions & C2.2 Activity Schedule Part C3: Scope of Work 3.1 Works Information Part C4: Site Information 9

  10. PART T1: TENDERING PROCEDURES Closing Date: : 11 March 2023 at 16:00 The Transnet e-Tender Submission Portal Log on to the Transnet eTenders management platform website (https://www.transnet.net); Click on TENDERS ; Scroll towards the bottom right hand side of the page; On the blue window click on register on our new eTender Portal ; Click on ADVERTISEDTENDERS to view advertised tenders; Click on SIGN IN/REGISTER for bidder to register their information (must fill in all mandatory information); Click on SIGNIN/REGISTER - to sign in if already registered; Toggle (click to switch) the Log an Intent button to submit a bid; Submit bid documents by uploading them into the system against each tender selected. All queries regarding the e-Tender submission to be addressed to Kabelo Mafohla, email: Kabelo.Mafohla@transnet.net Tender Validity Period :12 Weeks Stages/Procedure for evaluating responsive tenders PP2 Competitive Selection Procedure (PP2B open procedure) 10 Financial 80 - Preference 20

  11. PART T1: TENDERING PROCEDURES Eligibility Criteria (Substantive Responsiveness) Certificate of Attendance at Tender Clarification Meeting must be submitted with the tender Only those tenderers who are registered with the CIDB, or are capable of being so prior to the evaluation of submissions, in a contractor grading designation equal to or higher than a contractor grading designation determined in accordance with the sum tendered or a value determined in accordance with Regulation 25 (1B) or 25(7A) of the Construction Industry Development Regulations, designation of 4GB or higher class of construction work, are eligible to have their tenders evaluated. An authorized representative of the tendering entity or a representative of a tendering entity that intends to form a Joint Venture (JV) must attend the compulsory clarification meeting in terms C2.7 A tenderer having a stipulated minimum B-BBEE status contributor of level 2. Local Production and content Quality/Functionality/Technical Minimum threshold of 60points 11

  12. PART T2: RETURNABLE DOCUMENTS T2.1 List of returnable documents T2.2 Returnable Documents & Schedules C1.1 Form of offer and acceptance C1.2 Contract Data Part 2 C2.2 Activity Schedule 12

  13. PART C1: AGREEMENT AND CONTRACT DATA Part 1 Agreements and Contract Data C1.1 Form of Offer and Acceptance C1.2 Contract Data Part 1 & 2 C1.3 Forms of Security Part 2 Pricing Data C2.1 Pricing Instruction C2.2 Bill of Quantity Part C3 Scope of Work C3.1 Scope of Work (Project Manager) Part C4 Site Information C4.1 Site Information (Project Manager) 13

  14. PART C1: AGREEMENT AND CONTRACT DATA Conditions of Contract NEC for Engineering Construction Contract Contract Data Part 1 - Employer Main Option B: Priced contract with Bill of Quantity W1: Dispute resolution procedure Secondary Options X2 Changes in the law X16: Retention 5% on all payments certified X17: Delay damages R 2 500 per day X18: Limitation of liability Z: Additional conditions of contract 14

  15. PART C1: AGREEMENT AND CONTRACT DATA Z Clauses Additional conditions of contract Z1 Obligations in respect of Termination Z2 Right Reserved by Transnet to Conduct Vetting through SSA Z3 Additional clause relating to Collusion in the Construction Industry Z4 Protection of Personal Information Act Z5 Additional obligation in respect of Termination Z6 Additional clause relating to Performance Bonds and/or Guarantees 15

  16. PART C1.2 : CONTRACT DATA - Contractor Part two 10. 1 Contractor Details; 11.2 (8) The direct fee percentage The subcontracted fee percentage 24.1 The Contractor's key persons 16

  17. Transnets evaluation methodology STAGE 1: STAGE 2 STAGE 3 PREQUALIFICATION Step 2 Step 1 Step 4 Step 3 Step 5 Step 8 Step 6 Step 7 Administrative responsiveness Substantive responsiveness MINIMUM THRESHOLDS Weighted scoring / 100*** Functionality/ technical 60points Returnable documents/ schedules Pre-qualification Award of business and conclusion of contract Post tender negotiation with preferred bidder [2nd and 3rd ranked bidders (if required) in a sequential and not simultaneous manner] if pricing is not market-related Price (80) Selection of the preferred bidder. B-BBEE scorecard (20) (Objective criterion to justify award to someone other than the highest ranked bidder must have been stated in the bid documents and can be used at this stage, if applicable) Step 2: -- Attendance of compulsory Briefing session. CIDB Grading Designation of 6GB or Higher Technical / Functional criteria & weightings must be stipulated in the tender documents WEIGHTED SCORE Technical Pre-qualification: 1. 60points Threshold 17

  18. QUESTIONS & ANSWERS 18

  19. THANK YOU 19