Change Order Guidelines and Best Practices

Slide Note
Embed
Share

Comprehensive guidelines and best practices for processing change orders efficiently. Includes explanations for addressing minor annoyances, ensuring accurate documentation, and obtaining necessary approvals. Emphasizes the importance of utilizing proper formatting, avoiding errors, and following specific procedures for Federal-funded projects. Stay on top of reviews, signatures, and funding allocations to streamline change order processes effectively.


Uploaded on Sep 29, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. CHANGE ORDER Minor annoyances for Bob Once you start change order get reviewed and processed!

  2. Change Order Explanations Brief but explain the problem and solution. If supplemental item need reference how price obtained (ave. bid cost, breakdown, comparision, etc) Mention item of work in explanation. Do not put simply this item Also run Spell Check if lot of words or only a few! example: [8001] [8002]GUARDRAIL-Material Only these items are for invoice paid for remainder of guardrail quantities on grade contract and will be installed as an "install only" price on the surfacing contract. This will allow for the grade contract to be completed. DRAFT 1-15-15

  3. Change Order Explanations Continued Use Mixed Case NO YELLING Spell Check most Engineers cannot spel ;-) If Federal funded (FD52) and keeping unused items for maintenance need to get NON PARTICIPATING funding category setup! Before sending for review and after any changes run Calculate from Services on Header tab DRAFT 1-15-15

  4. Change Order Explanations Continued Contract may have Multiple funding lines (PO2 Line Number) be aware each is a separate pot of money. When you write a zero sum change but one of PO2 lines will be out of money, it still need to get that fund increased. PLEASE PLEASE after notice of reviews completed PLEASE get signatures from Section and CDE and put in PEND status and apply PEND approval at Section Level. Change order cannot be proceed if PEND approval not applied! FHWA review for PoDI Project of Division Interest (FHWA)contracts. In supplemental description & explanation if inches use IN not , if feet use LF not . For example 20 IN Do use ALL CAPS for supplemental Description. Item Description in database is all CAPS and looks better. DRAFT 1-15-15

  5. CHARGE ORDER Once you start change order get reviewed and processed!

  6. Brownie, you're doing a heckuva job D5 loves to write Change Orders D6 over acheivers