Challenges Faced During Foster Wheeler Steam Boiler Moving Day
During the process of moving a 1200 LB steam boiler by Foster Wheeler, several challenges were encountered. The journey started on 22nd October 2016 and faced obstacles such as overcoming a 4-inch cable hindrance. Despite setbacks, the team persevered and eventually succeeded in transporting the boiler to its destination. The experience highlights the complexities involved in industrial equipment relocation.
Download Presentation
Please find below an Image/Link to download the presentation.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
E N D
Presentation Transcript
20 October 2016 Foster Wheeler 1200 LB Steam Boiler 1
ALL GONE 11
Boiler Moving Day 22 October 2016 Started at 0630 leaving SWOS and arrived at pier 1100 12
4 in. cable 19
Three hours later, approaching pier; Verizon life truck ran out of fuel (can t make this stuff up) and could not get under last set of wires. 22
Closing remarks Towed to Quonset Point (Reagan Construction) awaiting favorable weather. Barge schedule to depart for MMA on Wednesday. Estimate travel time is 12 hours. 32