Britain's Smarter, Greener Connectivity Programme Update

GBCS 4.1 Programme
Initial Pallet Validation (IPV)
We believe in making Britain more connected,
so we can all lead smarter, greener lives.
DCC Controlled OPSG
2023
2022
2024
C
P
L
TAB
20
/07
TAG
30
/08
CPL
10/11
 DB UIT
H
o
l
i
d
a
y
EOC
CPA Certification
CPA Certification
PIT - 1
SIT SB. DB
UP
Pilot
(OTA)
In Supply Chain
TAB
Feb
SB  UIT
29/08 – 10/10
O
A
O
A
PPMID Meter
Device Ava.
PIT -2
PPMID
Conf Test
TAG Approval
of TAD
Test Approach Doc
CSP System
Changes. To test
GBCS 4.1 CH FW.
14/06
Start UIT
engagement with
Customers TOSH
PIT -3
 (Prod fix fw
4.1.0.4)
C
P
L
C
P
L
DB. DB-
F UIT
TAB
10
/03
TAG
29/03
CPL
14/07
TAB
23
/05
TAG
 28/06
CPL
15/09
DB UIT
O
A
PIT
(Prod
Fix fw
13.6)
Defect
fix
PIT 
(CPA
related Fix)
Defect Fix
CPA Certification
TAB
Oct
UP
SB UIT
Pilot
(OTA)
In Supply Chain
O
A
SIT SB. DB &
SB  UIT
UP
SIT SB. DB. 
DB-F
O
A
Pilot
(OTA)
O
A
In Supply Chain
PIT -1
TAB
Oct
03/07 – 14/08
PIT -1
PIT -2
22/04
19/02
29
/03 – 15/05
 
ECOS /
June 23
Go Live
GBCS 4.1 Plan on a page – 
Proposed for February 2023, OPSG (88_1402) Meeting
2024
 
2023
2025
H
o
li
d
a
y
C
P
L
CPL
14/07
DB UIT
O
A
SB UIT
Pilot
(OTA)
O
A
1
st
 Pallet Del
1
st
 Pallet
Delivered
1
st
 Pallet
Installed
O
A
GBCS 4.1 – 
IPV Indicative Schedule Impact
1
st
 Pallet Install
(3m)
C
P
L
C
P
L
DB UIT
CPL
15/09
CPL
10/11
 DB UIT
SB  UIT
O
A
Pilot
(OTA)
O
A
In Supply Chain
Pilot
(OTA)
In Supply Chain
SB  UIT
O
A
O
A
14/06
22/04
C
P
L
CPL
15/09
DB UIT
O
A
SB UIT
Pilot
(OTA)
In Supply Chain
O
A
30/10
1
st
 Pallet Manu
1
st
 Pallet
Delivered
1
st
 Pallet
Installed
O
A
1
st
 Pallet Install
(3m)
C
P
L
CPL
10/11
 DB UIT
Pilot
(OTA)
SB  UIT
O
A
O
A
In Supply Chain
30/01
1
st
 Pallet Manu
1
st
 Pallet
Delivered
1
st
 Pallet
Installed
O
A
1
st
 Pallet Install
(3m)
H
o
li
d
a
y
Mass OTA Deployment
Mass OTA Deployment
Mass OTA Deployment
Mass OTA Deployment
Mass OTA Deployment
Mass OTA Deployment
In Supply Chain
30
/09
Comms Hub Manufactures and Variants
DCC Controlled
Overview
2 CSPs
3 CH manufactures
7 CH variants in scope for test:
Single Band x3 (EDMI, WNC & TOSH)
Dual band x3 (EDMI, WNC & TOSH)
Dual Band Fylingdales x1 (EDMI)
Large volume of standard UIT variants are also tested
Arqiva (North)
VMO2 (Central and South)
WNC
EDMI
SB
DB
DB-F
SB
DB
TOSH
SB
DB
CSP
CSP
Supplier
CH
Variants
UIT
Variants
RTL &
Debug
Wireless
ITCH
RTL &
Debug
Wired
ITCH
Wireless
ITCH
RTL &
Debug
RTL &
Debug
RTL &
Debug
Wired
ITCH
Wireless
ITCH
RTL &
Debug
Wireless
ITCH
RTL &
Debug
Wired
ITCH
Wireless
ITCH
Wireless
ITCH
MESH
RTL & Debug
MESH
RTL & Debug
Slide Note
Embed
Share

Making Britain more connected for smarter, greener living with the DCC Public GBCS 4.1 Programme. The programme includes plans, schedules, and impacts related to Initial Pallet Validation and Comms Hub Manufacturers. Various tasks and milestones are outlined, with a focus on engaging customers, system changes, testing, deployments, and certifications.

  • Connectivity
  • Green Living
  • Programme Update
  • DCC Public
  • Initial Pallet Validation

Uploaded on Oct 09, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. DCC Public GBCS 4.1 Programme Initial Pallet Validation (IPV) We believe in making Britain more connected, so we can all lead smarter, greener lives. DCC Controlled OPSG DCC Public

  2. DCC Public GBCS 4.1 Plan on a page Proposed for February 2023, OPSG (88_1402) Meeting 2024 2022 2023 Release RAG Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun PPMID Meter Device Ava. Dependen cies Start UIT engagement with Customers TOSH CSP System Changes. To test GBCS 4.1 CH FW. ECOS / June 23 Go Live PPMID Conf Test TAG Approval of TAD Test Approach Doc 29/03 15/05 C P L 19/02 SB UIT O A O A PIT (Prod Fix fw 13.6) Pilot (OTA) Defect fix UP SIT SB. DB & PIT -1 DB UIT In Supply Chain 1 TOSH CPL 14/07 TAG 29/03 CPA Certification TAB 10/03 TAB Oct H o l i d a y 03/07 14/08 22/04 C P L SB UIT O A O A Pilot (OTA) PIT (CPA related Fix) UP Defect Fix In Supply Chain SIT SB. DB. DB-F PIT -1 PIT -2 2 EDMI DB. DB- F UIT TAG 28/06 TAB 23/05 TAB Oct CPL 15/09 CPA Certification PIT -3 TAB Feb 29/08 10/10 (Prod fix fw 4.1.0.4) 14/06 C P L CPL 10/11 O A O A Pilot (OTA) SB UIT PIT - 1 PIT -2 UP SIT SB. DB In Supply Chain EOC 3 WNC DB UIT TAB 20/07 TAG 30/08 CPA Certification | 2 DCC Public

  3. GBCS 4.1 IPV Indicative Schedule Impact DCC Public 2025 2023 2024 RA G Release Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun C P L 19/02 SB UIT Mass OTA Deployment O A O A Pilot (OTA) Toshiba Plan without First Pallet DB UIT In Supply Chain CPL 14/07 Mass OTA Deployment 30/09 C P L SB UIT O A O A Pilot (OTA) 1st Pallet Install (3m) O A 1st Pallet Del Toshiba Plan with First Pallet DB UIT In Supply Chain CPL 14/07 1st Pallet Delivered 1st Pallet Installed 22/04 C P L SB UIT O A EDMI Plan without First Pallet Mass OTA Deployment O A Pilot (OTA) In Supply Chain H o li d a y DB UIT H o li d a y CPL 15/09 Mass OTA Deployment C P L EDMI Plan with First Pallet O A SB UIT O A 30/10 Pilot (OTA) 1st Pallet Install (3m) O A 1st Pallet Manu DB UIT In Supply Chain CPL 15/09 1st Pallet Delivered 1st Pallet Installed Mass OTA Deployment 14/06 C P L CPL 10/11 WNC Plan without First Pallet O A O A Pilot (OTA) SB UIT In Supply Chain DB UIT Mass OTA Deployment C P L CPL 10/11 30/01 WNC Plan with First Pallet O A O A O A Pilot (OTA) SB UIT 1st Pallet Install (3m) 1st Pallet Manu DB UIT In Supply Chain 1st Pallet Installed 1st Pallet Delivered | 3 DCC Public

  4. DCC Public Comms Hub Manufactures and Variants Arqiva (North) VMO2 (Central and South) CSP CSP Supplier CH Variants EDMI WNC TOSH SB SB DB DB DB-F SB DB RTL & Debug RTL & Debug Wired ITCH Wireless ITCH RTL & Debug RTL & Debug RTL & Debug Wired ITCH Wireless ITCH RTL & Debug Wired ITCH Wireless ITCH MESH RTL & Debug RTL & Debug UIT Wireless ITCH Variants Wireless ITCH Wireless ITCH Overview MESH 2 CSPs 3 CH manufactures 7 CH variants in scope for test: Single Band x3 (EDMI, WNC & TOSH) Dual band x3 (EDMI, WNC & TOSH) Dual Band Fylingdales x1 (EDMI) Large volume of standard UIT variants are also tested RTL & Debug | 4 DCC Controlled DCC Public