2013 Construction & Material Specifications Training Overview

Slide Note
Embed
Share

This document provides an overview of the training session conducted for the 2013 Construction and Material Specifications. It covers the significant changes introduced, the publication dates of associated documents, key topics discussed in the training sessions, conversion guidelines, and the schedule for implementation. The training agenda, including topics on administration, earthwork, pavements, structures, environmental aspects, hydraulics, traffic, and a final review, is detailed with respective time allocations.


Uploaded on Dec 09, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. Training for the 2013 Construction and Material Specifications Office of Construction Administration Gary Angles, Administrator

  2. Introduction, Overview and Implementation Schedule Focus of this training will be to: Introduce the 2013 C&MS Describe the significant changes with a focus on the changes that may require design consideration

  3. Introduction, Overview and Implementation Schedule o The 2013 C&MS was published 12/31/2012 o Associated documents published 12/31/2012: Proposal Notes Supplemental Specifications Supplements o Associated documents published 1/18/2013: Standard Construction Drawings L&D Manual updates

  4. Introduction, Overview and Implementation Schedule The most significant changes were made in: Items 603, 604 were replaced by Item 611 (To be covered by Becky, and Gary) with QC-1, QC-2, QC-Misc (To be covered by Craig, and Jim) For all Concrete items, replace Class C, S, F

  5. Introduction, Overview and Implementation Schedule Currently all documents, including the Item Master are available on the internet Conversion guidelines: www.dot.state.oh.us/Divisions/Engineering/CaddMapping/cms_conversion/Pages/2013_CMS_Conversion_Page.aspx Item Master: www.dot.state.oh.us/Divisions/ContractAdmin/Contracts/Construction/Forms/ItemMaster.aspx C&MS, PN, SS, S: www.dot.state.oh.us/Divisions/ConstructionMgt/OnlineDocs/Pages/ProposalNotesSupplementalSpecificationsandSupplements.aspx Please note that all projects with an award date of 12/23/2013 (sale date of 12/12/2013) or after must be converted to the 2013 C&MS with no exceptions. The first SS800 for the 2013 C&MS will be dated 4/19/2013 The last SS800 for the 2010 C&MS will be dated 7/19/2013

  6. Introduction, Overview and Implementation Schedule 9:00 am 0.25 hr 2013 C&MS Introduction, Overview, and Implementation Gary Angles, P.E. Todays Agenda: 9:15 am 0.75 hr Clint Bishop, P.E. Administration Issues, CPM Schedules, and Partnering 10:00 am 0.5 hr Stephen Slomski, P.E. Earthwork and MSE changes 10:30 am Break 10:45 am 0.75 hr Craig Landefeld, P.E. Pavements and QC/QA Concrete changes 11:30 am on your own Lunch 12:30 pm 0.5 hr Structures changes Jim Welter, P.E. 1:00 pm 0.25 hr Gary Angles, P.E. Environmental changes 1:15 am 0.5 hr Becky Humphreys, P.E. Hydraulics and the New Item 611 1:45 pm Break 2:00 pm 0.50 hr Dan Groh, P.E. Traffic, Signing, and Pavement Marking changes 2:30pm 0.50 hr Gary Angles, P.E. Review, Summary and Questions 3:00 pm 4.5 hr total End of Training

  7. Questions Gary Angles, Administrator Office of Construction Administration Gary.Angles@dot.state.oh.us www.dot.state.oh.us/Divisions/ConstructionMgt/Pages/default.aspx 614-466-7075

Related


More Related Content