Risk-Based Environmental Assessment Overview

Slide Note
Embed
Share

Risk-Based Environmental Assessment involves evaluating physical, financial, social, political, legal, safety, health, and environmental risks to address potential impacts on the environment. This assessment includes identifying, managing, and mitigating risks and impacts associated with various sectors such as agriculture, mining, energy, water, land use, climate, geology, and seismic hazards among others.


Uploaded on Sep 14, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. RISK BASED ENVIRONMENTAL ASSESSMENT RISK-BASED ENVIRONMENTAL ASSESSMENT Simon Catchpole Porto, May 2012 www.bgcengineering.ca

  2. RISK BASED ENVIRONMENTAL ASSESSMENT AN OVERALL RISK ASSESSMENT ADDRESSES THE UNDERLYING PHYSICAL RISKS, UPON WHICH THE NON-PHYSICAL RISKS DEPEND: Financial Social and Political Legal and Permitting Safety and Human Health Environmental and Geotechnical Risks Operational Risks

  3. RISK BASED ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL IMPACT ASSESSMENT ENVIRONMENTAL RISK ASSESSMENT IMPACT RISK MANAGEMENT COMPENSATION RESIDUAL IMPACTS RESIDUAL RISKS IMPACT MITIGATION RISK MITIGATION POTENTIAL IMPACTS EVENTUAL RISKS SCREENING FOR PROJECT - ENVIRONMENT INTERACTIONS SCREENING FOR PROJECT - ENVIRONMENT INTERACTIONS PROJECT DESCRIPTION PROJECT DESCRIPTION A.I. BASELINE A.I. BASELINE ALTERNATIVES ANALYSIS ALTERNATIVES ANALYSIS REGIONAL BASELINE REGIONAL BASELINE

  4. RISK BASED ENVIRONMENTAL ASSESSMENT AGRICULTURE & MINING SEA FISHING ENERGY USE WATER USE LAND USE CULTURAL CLIMATE STORMS ARCHAEOLOGY SEASONAL WEATHER FAUNA MARINE BIOLOGY AQUATIC BIOLOGY VEGETATION AVALANCHES HYDRO-HAZARDS SOILS SNOW HYDROLOGY LANDSCAPE OCEANOGRAPHY ACCUMULATION GEOMORPHOLOGY TSUNAMI HAZARDS ICE ACCUMULATION WATER CHEMISTRY GEO-HAZARDS COASTAL PROCESSES SURFACE PROCESSES SEISMIC HAZARDS FROZEN GROUND HYDROGEOLOGY GEOLOGY SEISMOLOGY

  5. RISK BASED ENVIRONMENTAL ASSESSMENT RISKS AND IMPACTS INVENTORY PREPARATION WORKS PERMANENT DAM WATER INTAKE COMMISSIONING COMPLEMENTARY TUNNEL ADVANCE SURFACE WATER EXCAVATION TO EXCAVATION OF CONSTRUCTION CONSTRUCTION DISCHARGE OF MANAGEMENT MANAGEMENT DAMMING OF SITE CLEARING FLOOD FLOWS COFFER DAM WASTE ROCK MATERIALS DAM WALL RIVER FLOW ENVIRONMENTAL ASPECT OR HAZARD FILLING OF BASE LEVEL RESERVOIR DIVERSION REMOVAL COMPONENT WATER PORTAL WORKS MODIFICATION OF SLOPES I I I I I GEOMORPHOLOGY MODIFICATION OF WATER COURSES I I I I REMOVAL / DISTURBANCE OF SOIL I I I I I SOIL INCREASED EROSION RATE I R R R R MODIFICATION OF FLOW REGIME I I I I I I MODIFICATION OF SLOPE RUNOFF I I I I INCREASED SEDIMENT LOAD R R I HYDROLOGY MODIFICATION OF RECHARGE TO GROUNDWATER I I I I I I EXPECTED IMPACT ENVIRONMENTAL RISK R

  6. RISK BASED ENVIRONMENTAL ASSESSMENT RISKS AND IMPACTS INVENTORY PREPARATION WORKS PERMANENT DAM WATER INTAKE COMMISSIONING COMPLEMENTARY TUNNEL ADVANCE SURFACE WATER EXCAVATION TO EXCAVATION OF CONSTRUCTION CONSTRUCTION DISCHARGE OF MANAGEMENT MANAGEMENT DAMMING OF SITE CLEARING FLOOD FLOWS COFFER DAM WASTE ROCK MATERIALS DAM WALL RIVER FLOW ENVIRONMENTAL ASPECT OR HAZARD FILLING OF BASE LEVEL RESERVOIR DIVERSION REMOVAL COMPONENT WATER PORTAL WORKS MODIFICATION OF SLOPES I I I I I GEOMORPHOLOGY LANDSLIDE IN CATCHMENT R R R R MODIFICATION OF WATER COURSES I I I I REMOVAL / DISTURBANCE OF SOIL I I I I I SOIL INCREASED EROSION RATE I R R R R MODIFICATION OF FLOW REGIME I I I I I I MODIFICATION OF SLOPE RUNOFF I I I I INCREASED SEDIMENT LOAD R R I HYDROLOGY MODIFICATION OF RECHARGE TO GROUNDWATER I I I I I FLOOD EVENTS IN CATCHMENT R I EXPECTED IMPACT ENVIRONMENTAL RISK EFFECT ON GEOHAZARD RISK R R

  7. RISK BASED ENVIRONMENTAL ASSESSMENT RISKS AND IMPACTS INVENTORY PREPARATION WORKS PERMANENT DAM WATER INTAKE COMMISSIONING COMPLEMENTARY TUNNEL ADVANCE SURFACE WATER EXCAVATION TO EXCAVATION OF CONSTRUCTION CONSTRUCTION DISCHARGE OF MANAGEMENT MANAGEMENT DAMMING OF SITE CLEARING FLOOD FLOWS COFFER DAM WASTE ROCK MATERIALS DAM WALL RIVER FLOW ENVIRONMENTAL ASPECT OR HAZARD FILLING OF BASE LEVEL RESERVOIR DIVERSION REMOVAL COMPONENT WATER PORTAL WORKS MODIFICATION OF SLOPES R R I I I R I R GEOMORPHOLOGY LANDSLIDE IN CATCHMENT R R R R MODIFICATION OF WATER COURSES I I I I REMOVAL / DISTURBANCE OF SOIL R R I R I R SOIL INCREASED EROSION RATE R R R R R R MODIFICATION OF FLOW REGIME I I I I I I MODIFICATION OF SLOPE RUNOFF R R R I R INCREASED SEDIMENT LOAD R R R R R I HYDROLOGY MODIFICATION OF RECHARGE TO GROUNDWATER I I I I I FLOOD EVENTS IN CATCHMENT R R I EXPECTED IMPACT ENVIRONMENTAL RISK EFFECT ON GEOHAZARD RISK ENHANCED ENVIRONMENTAL RISK R R R