Vme crates - PowerPoint PPT Presentation


Equipment Update and Cable Management Overview

Don Jones provided an update on the status of equipment upgrades and cable management tasks for June 6, 2024. The tech team removed enclosures with Simona's help, worked on soldering connectors, discussed cable layout with colleagues, and had undergraduates assisting on site. Initiatives included de

0 views • 5 slides


Vermitechnology and Composting: Sustainable Waste Management Solutions

Solid waste management is crucial in the face of increasing urbanization. Composting and vermitechnology offer natural and effective ways to treat organic waste, with earthworms playing a key role in bioconversion processes. Utilizing organic wastes like animal manure, crop residues, and food waste,

1 views • 12 slides



Latest Updates on NA62 Straw Electronics and Services

In the latest developments for NA62 straw electronics and services, progress has been made on wiring chambers with HV, LV, and data cables. However, adjustments are still needed for crates and connectors. Installation of VME crates has begun, with relocation plans to compensate for cable lengths. Is

0 views • 21 slides


LTU+TTCex System Status and Installation Overview

Detailed status updates, notes, and images regarding the LTU+TTCex system setup, clock distribution, final partitions, hardware installation, firmware and software updates, and DIM servers running on VME processors. The content covers the system's functionality, issues, to-dos, and upgrades as of Se

0 views • 9 slides


Overview of ICARUS LAr-TPC Installation and Testing

Detailed overview of the installation and testing procedures for the ICARUS Liquid Argon Time Projection Chamber (LAr-TPC) readout electronics. The system comprises front-end amplifiers, ADC systems, optical links for data transmission, mini-crates housing the electronics boards, power supplies, and

0 views • 6 slides


Migration Story: From VME/RTEMS to Industrial PC/LinuxRT

Explore the migration journey from VME/RTEMS to Industrial PC/LinuxRT at the EPICS Collaboration Meeting in May 2015. Highlights include the shift to Linux for controls, building embedded real-time systems, LinuxRT considerations, current status, open issues, and future outlook.

0 views • 20 slides


Engineering Mechanics Overview and Problem-Solving Techniques

Explore the fundamental concepts of Engineering Mechanics with references from "Mechanics of Materials: An Integrated Learning System" by Timothy A. Philpot. Learn about approved calculators, problem-solving documentation, free body diagrams (FBDs), and centroids. Enhance your understanding of coord

0 views • 12 slides


Ancient Maps and Alignments: A Journey Through History

Explore a collection of ancient maps and alignments, from Sumerian maps dating back to 1500 B.C. to the precise compass orientation of the Great Pyramid of Giza. Delve into the mysteries of the underworld as painted on an Egyptian coffin from 2000 B.C. Witness the evolution of cartography with the f

0 views • 6 slides


Moon Buggy Programming Challenge with Variables

Dive into a lunar adventure with the moon buggy simulation. Add crates of rocks to the buggy while using variables to track the collection count. Explore algorithms, main activities, and extension experiments to enhance your coding skills. Test your understanding through a plenary session discussing

0 views • 8 slides


KLM Crate Utilization Belle Crate Configuration Overview

The KLM Crate Utilization Belle Crate Configuration involves reusing locations with specific changes: removal of endcap 6U crates, installation of new 9U (COPPER) crates for endcap and barrel scintillators, and relocation of ARICH and TOP FTSW to 8 crates each. Check out the detailed changes and con

0 views • 5 slides


Update on TPC Electronics Activities - July 2019

The upcoming short-term activities for ICARUS WA104 meeting on July 17th, 2019, at TPC Electronics include installation of cables, refurbishment of defective modules, and addressing excess noise issues in mini-crates. Detailed plans for interventions at FNAL from July 24th onwards involve repair act

0 views • 7 slides