Overview of PED Compliance Requirements for RFD Crab Cavities Fabrication at FNAL

The process of ensuring PED compliance for RFD crab cavities fabricated by FNAL involves a review of EN and ASME Codes, with additional requirements set by CERN HSE. A formal agreement is being finalized, with a document defining essential safety requirements, risk assessment, and more. Additional r

5 views • 13 slides


Enhancing Particle Acceleration in Booster with Permanent Magnet Accumulator Ring

A permanent magnet accumulator ring could revolutionize the Booster facility, benefiting PIP-II/DUNE programs and advancing FNAL toward a large-scale DS program. By integrating the new 1 GeV line within the existing Booster to BNB enclosure, costs and timelines are significantly reduced. The proposa

1 views • 4 slides



Event Classification in Sand with Deep Learning: DUNE-Italia Collaboration

Alessandro Ruggeri presents the collaboration between DUNE-Italia and Nu@FNAL Bologna group on event classification in sand using deep learning. The project involves applying machine learning to digitized STT data for event classification, with a focus on CNNs and processing workflows to extract pri

0 views • 11 slides


Snowmass 2022 Meeting - PIP-II Accumulator Ring (PAR)

Snowmass 2022 Meeting presentation discusses an opportunity for a storage ring utilizing PIP-II capabilities to support DUNE power ramp up and FNAL physics program. The talk outlines the potential benefits and implications of this proposal in the field of particle physics.

0 views • 25 slides


FNAL Global S1 Cavity Plan and Shipment Details

The content discusses the progress and plans related to FNAL Cavities for the S1 Global project. It covers topics such as major components, cavity processing challenges, the developed working plan, and details of cavity shipment to KEK. Various images of cavity plans and processing are included alon

0 views • 17 slides


Director's Review - Mechanics & Cooling Overview

The US will design and build the central portion of the Phase 2 Tracker Barrel Pixel Strip Detector (TBPS), focusing on mechanics and cooling. The project involves three layers of PS modules with specific lengths, utilizing carbon fiber/carbon foam sandwich planks with embedded CO2 cooling. Collabor

0 views • 19 slides


Enhancing Computing Capabilities for DUNE Collaboration

Strengthening the collaboration between BNL and FNAL through advanced computing models led by senior experts. Focus on addressing raw data processing challenges, fostering a federated approach, and optimizing research efforts in the field of particle physics. Doug Benjamin's appointment at BNL has a

0 views • 6 slides


Update on TPC Electronics Activities - July 2019

The upcoming short-term activities for ICARUS WA104 meeting on July 17th, 2019, at TPC Electronics include installation of cables, refurbishment of defective modules, and addressing excess noise issues in mini-crates. Detailed plans for interventions at FNAL from July 24th onwards involve repair act