Clarification and Updates Regarding ECEII Definition and Document Handling in ERCOT
This presentation delves into Nodal Protocol Revisions NPRR1183 and PGRR108 to clarify the ECEII definition and update rules for posting documents without ECEII. It covers information access, document handling, and the role of different areas like the MIS Certified Area and MIS Secure Area within ER
2 views • 13 slides
ERCOT CONE Study: Reference Technology Selection for Thermal Dispatchable Plant
The ERCOT CONE study focuses on selecting a reference technology for a thermal dispatchable plant in ERCOT, providing a basis for Cost of New Entry (CONE) calculations. The study reviews characteristics of existing and upcoming plants to determine the preferred technology. The proposed specification
3 views • 21 slides
ERCOT Resource Adequacy Analysis Update - February 2023
Reliability Standard Scenario Study focusing on frequency levels, VOLL study progress with upcoming survey rollout, and CONE Study detailing reference technology for ERCOT resource adequacy analysis. Updates on modeling phases, cost estimates, and consultant team activities for comprehensive supply
5 views • 4 slides
ERCOT Resource Integration Recommendations for Quarterly Stability Assessment
ERCOT's Resource Integration Working Group, led by Jenifer Fernandes, outlines important guidelines and deadlines for Quarterly Stability Assessments (QSA) and synchronization of generation resources. The group emphasizes the proper planning and review processes to ensure the reliability of the grid
4 views • 13 slides
Quarterly Stability Assessment Requirements and Planning Guide
This document outlines the requirements and timeline for the Quarterly Stability Assessment (QSA) as part of the ERCOT Resource Integration Working Group. It covers key prerequisites such as completed studies, signed agreements, and model validations needed for a successful QSA process. The Planning
4 views • 7 slides
Improvements for Energy Storage State of Charge Awareness
Updates made to NPRR1186 prior to the RTC+B project aim at enhancing awareness, accounting, and monitoring of Energy Storage Resources (ESRs). ERCOT reviewed and revised constraints related to Ancillary Service awards for ESRs, considering different scenarios. Changes were also implemented to addres
0 views • 35 slides
ERCOT Resource Adequacy Analysis Overview
ERCOT's resource adequacy analysis involves multiple aspects such as Capacity, Demand, and Reserves Report status, NPRR submissions, ELCC definitions, and MORA tabs detailing risk assessment and historical trends. The analysis covers upcoming changes in methodologies, seasonal release schedules, and
1 views • 13 slides
ERCOT Market Trials Approach and Assumptions for RTC+B System
ERCOT is planning a series of market trials to ensure the reliability of transitioning to the RTC+B system. The approach includes closed-loop LFC tests, incremental upgrades, and parallel testing with production data, among other strategies. Detailed handbooks will be provided prior to each trial ph
0 views • 12 slides
ERCOT Cone Study Draft Overview
The ERCOT Cone Study Draft, prepared by The Brattle Group for ERCOT, presents an in-depth analysis of the Cost of New Entry (CONE) for different energy technologies in the Texas market. The study includes detailed cost estimates, reference technology characteristics, and alternative technology analy
0 views • 28 slides
ERCOT Resource Integration Updates - Planning and Submission Guidelines
Stay updated with important ERCOT resource integration topics including Quarterly Stability Assessment (QSA) guidelines, commissioning checklist submissions, dynamic model reviews, and more for efficient planning and compliance. Ensure timely submission and adherence to requirements outlined by ERCO
0 views • 15 slides
Enhancing ERCOT's Capacity Assessment with Demand Response Monitoring
Demand response in ERCOT has been increasing, with forecasts of continued growth. The system operator can identify MW peaks by analyzing total ERCOT load data. A proposed Demand Response Monitor would assist in predicting future capacity needs based on responses from loads like LMP energy prices and
0 views • 7 slides
Understanding Potential Uplift Interpretation in ERCOT Protocols
ERCOT's Potential Uplift Interpretation Protocol defines Potential Uplift as the potential uplift to the Counter-Party based on short payments. The protocol outlines calculations and clarifies language ambiguity to ensure accurate interpretation. ERCOT seeks market feedback for further clarification
0 views • 6 slides
Enhanced Criteria for Valuation of GTC Exit Solutions in ERCOT Transmission Planning
GTC exit solutions in ERCOT are crucial for addressing stability issues. This report suggests improvements in evaluation criteria and modeling changes to enhance the accuracy of assessing GTC exit solutions. Key concepts include utilizing market data for bid prices, modeling transmission outages imp
3 views • 12 slides
Updates and Discussions on ERCOT NPRRs and NOGRRs
ERCOT Operations Working Group (OWG) discussed various NPRRs (Nodal Protocol Revision Requests) like NPRR1084, NPRR1085, NPRR1100, NPRR1118, as well as NOGRR (Nodal Operating Guide Revision Requests) NOGRR215 and NOGRR226. The group reviewed comments, concerns, and recommendations related to resourc
5 views • 9 slides
Software Engineering Design Principles and Concepts
The chapter discusses the essential principles and concepts in software design, highlighting the four key design models - data design, architectural design, interface design, and component-level design. It emphasizes the importance of traceability to the analysis model, minimizing the gap between so
0 views • 36 slides
Analysis of Change in EAL Calculation Scenarios
In this analysis, Sanchir Dashnyam, the ERCOT Market Credit Manager, discusses the change in the EAL calculation formula, exploring different scenarios and their impacts on ERCOT markets. The scenarios involve adjustments to the application of RFAF against various parameters, aiming to optimize the
0 views • 7 slides
ERCOT Supply Analysis Working Group February 2022 Update Report
The Supply Analysis Working Group (SAWG) updated the ERCOT committee in February 2022 on various aspects including long-term load forecast discussions, reductions in load forecasts due to COVID impacts, rooftop PV forecasts, and the December 2021 CDR review highlighting a drop in summer 2022 reserve
0 views • 8 slides
Understanding ERCOT Default Uplift and Payment Procedures
ERCOT's default uplift and payment procedures involve handling short-paying invoice recipients, implementing payment plans, and collecting total short pay amounts from QSEs and CRRAHs. Default uplift invoices may be issued after 90 days of a short pay, with a maximum cap of $2.5 million per monthly
0 views • 7 slides
ERCOT 2015 Updates and Enhancements
ERCOT implemented changes in the Market System in 2015, including the removal of NPRR568 Phase 2 and adjustments to various pricing elements. The Settlement System also underwent updates throughout the year. These modifications aimed to enhance reliability and efficiency in ERCOT operations.
0 views • 17 slides
ERCOT Response to Market Questions on Issue #18 AS Demand Curves
ERCOT addresses concerns regarding AS demand curves and operational impacts in the context of current policy. Feedback covers topics like product priorities in scarcity, utilization of IRRs for Ancillary Services, and alignment of ORDC curve with operational needs.
0 views • 5 slides
Understanding ERCOT SOL Methodology and NERC Standards
Explore the ERCOT SOL Methodology for Planning and Operations Horizons as outlined by Stephen Solis in 2014. Learn about System Operating Limits, Interconnection Reliability Operating Limits, and the relationship between ERCOT and Transmission Planners/Operators. Discover the purpose, changes made,
0 views • 33 slides
Challenges in ERCOT Transmission Infrastructure & Operations
Poor transmission infrastructure and restrictive interconnect practices in ERCOT are leading to dangerous operations, congestion issues, and generation revenue impacts. Concerns include increased RAS proposals, challenges with GTC management, and minimalist interconnect processes. The need for impro
0 views • 9 slides
ERCOT Congestion Management Working Group Updates
The ERCOT Congestion Management Working Group discussed various topics such as reviewing constraint management processes, implementing the Not-to-Exceed method for efficient control of GTCs, and analyzing congestion at the cap during a recent event. The group aims to improve processes, reduce transm
0 views • 7 slides
Analysis of ERCOT Issues and Solutions by Luminant Energy
The analysis delves into ERCOT's identified issues and solutions regarding energy scarcity, examining historical data to pinpoint causes behind potential shortages. By reviewing specific time periods and the impact of various factors like Resource Deployment Factors (RDF) and Reserve Response Servic
0 views • 9 slides
ERCOT Passport Update and Real-Time Co-optimization Scope
ERCOT's Passport update outlines milestones and enhancements in compliance and delivery for 2021-2024. The initiative includes real-time co-optimization for energy and ancillary services every five minutes, optimizing battery energy storage resources, and refining market mechanisms to enhance effici
0 views • 14 slides
ERCOT Market Credit Manager Proposal Analysis
This document outlines EAL change proposals scenarios for ERCOT Market Credit Manager, including definitions of invoice exposures, current EAL formulas, and various scenarios affecting the calculation. It covers invoice exposure definitions, current EAL formula versus scenarios #1, #1a, and #1b, as
0 views • 11 slides
ERCOT Panhandle Hub Analysis Recommendations
Analysis of the Panhandle Hub definition under NPRR817 shows options for ERCOT stakeholders. Recommendations include avoiding congestion, testing hub definition using day-ahead market model, and consistent weighting of nodes. Methodology involves using Panhandle GTC, SCED intervals, sorting LMPs, an
0 views • 16 slides
Optimizing Firm Fuel Supply Service Deployment in ERCOT
ERCOT is considering a revised approach to providing Firm Fuel Supply Service (FFSS) from individual Generation Resources through an RFP process. The proposal involves setting a minimum Load Serving Limit (LSL) to ensure the deployment of a specific amount of service and allocating FFSS based on sys
0 views • 9 slides
ERCOT Operations Analysis: Impact of Frequency Control During Unit Startup and Shutdown
This presentation by Sandip Sharma discusses ERCOT's expectations regarding resource entities and QSEs during the startup and shutdown of units, emphasizing the importance of proper procedures to avoid performance issues, base point deviation charges, and system-level frequency deviations. The objec
0 views • 28 slides
ICE Price Analysis for ERCOT Credit Risk Exposure
CWG/MCWG is exploring the use of ICE futures prices to assess ERCOT's credit risk exposure. This involves analyzing the relationship between ICE prices and actual RTM prices. The data inputs and transformations include calculations of daily average prices, logarithmic adjustments for linear regressi
0 views • 22 slides
A Glimpse into an ERCOT Operator's Role During the January 6, 2014 EEA Event
Amid freezing conditions and generation resource challenges, ERCOT operators responded to an emergency on January 6, 2014, leading to the declaration of Energy Emergency Alerts. This snapshot showcases the critical tasks and decisions made by ERCOT personnel during this event.
0 views • 37 slides
Reduction of Unsecured Credit Limits at ERCOT Board Meeting
ERCOT is considering reducing the unsecured credit limit from $50M to $30M based on recommendations from various committees. This reduction aims to bring down outstanding unsecured credit from $1.4B to $400M. Market participants support this move, which would make ERCOT's limit the lowest among ISO/
0 views • 5 slides
ERCOT Updates and Recommendations August 2018
The Transmission Advisory Committee (TAC) recommended several revision requests for approval by the Board of Directors (BOD) in August 2018. These requests included updates related to fuel costs, market settlements, wind power forecasting, and more. Additionally, subcommittee updates highlighted pro
0 views • 5 slides
Understanding BCG Matrix: Market Growth and Relative Market Share
BCG Matrix, developed by Bruce Henderson of the Boston Consulting Group, categorizes business units into Question Marks, Stars, Cash Cows, and Dogs based on market growth and relative market share. Market share and market growth are crucial factors in determining a company's position in the market.
0 views • 31 slides
Market Credit Working Group Update: NPRR 1146 Developments
The Market Credit Working Group provides an update to the Wholesale Market Subcommittee regarding NPRR 1146 from Rainbow Energy Marketing Corporation. The update includes information on NPRR reviews, credit impacts, collateral release, and developments related to NPRR 1146. ERCOT's stance on NPRR 11
0 views • 12 slides
Analysis of NPRR 784 Impact on ERCOT Market Design
NPRR 784 proposes changes to how Reliability Must Run (RMR) units are priced in noncompetitive scenarios due to transmission constraints in ERCOT. This proposal is argued to be inconsistent with the market design, potentially punitive to customers, and limiting ERCOT's ability to maintain reliabilit
0 views • 7 slides
Overview of ERCOT Renewable Regions and Zone Map
ERCOT, managed by Bill Blevins, divides into seven solar and wind regions including North, South, East, West, Panhandle, Coast, and Houston. This division aids operations planning and management. The Renewable Regions Map and Zone Map play key roles in GIS status reporting and meeting presentations,
0 views • 4 slides
Evolution of Generation Deliverability Criteria in ERCOT
ERCOT's journey towards enhancing generation deliverability criteria involves requests for transmission planning considerations, workshops on tool development, and discussions on economic criteria revisions. The focus is on addressing generation constraints at peak load conditions and assessing the
0 views • 7 slides
Comparison of Generator Governor Dead-band Settings in ERCOT Interconnection
This report compares the generator governor dead-band settings in the ERCOT Interconnection for the years 2008 and 2015 from January to November. It outlines the changes in the dead-band settings over the years, including the requirements for proportional response, improvements in primary frequency
0 views • 17 slides
Proposed Changes to ERCOT Credit Forms - Update and Revision Details
Detailed updates and proposed changes to ERCOT credit forms including Letter of Credit, Surety Bond, and Guarantee Agreements discussed by Katherine Gross, Senior Corporate Counsel at ERCOT. The elimination of Guarantee Agreements due to regulatory changes and adjustments to Letter of Credit and Sur
0 views • 5 slides