Ercot interconnection - PowerPoint PPT Presentation


Safety First and Always: DG Interconnection Seminar Process

Learn how to ensure safety while connecting Distributed Energy Resources. Understand the simplified process for interconnection, including key steps and safety precautions. Join us to enhance your knowledge and protect yourself and your team.

0 views • 26 slides


ERCOT CONE Study: Reference Technology Selection for Thermal Dispatchable Plant

The ERCOT CONE study focuses on selecting a reference technology for a thermal dispatchable plant in ERCOT, providing a basis for Cost of New Entry (CONE) calculations. The study reviews characteristics of existing and upcoming plants to determine the preferred technology. The proposed specification

3 views • 21 slides



Quarterly Stability Assessment Requirements and Planning Guide

This document outlines the requirements and timeline for the Quarterly Stability Assessment (QSA) as part of the ERCOT Resource Integration Working Group. It covers key prerequisites such as completed studies, signed agreements, and model validations needed for a successful QSA process. The Planning

4 views • 7 slides


ERCOT Resource Adequacy Analysis Overview

ERCOT's resource adequacy analysis involves multiple aspects such as Capacity, Demand, and Reserves Report status, NPRR submissions, ELCC definitions, and MORA tabs detailing risk assessment and historical trends. The analysis covers upcoming changes in methodologies, seasonal release schedules, and

1 views • 13 slides


Federal Energy Regulatory Commission Transmission Update - Nov. 3, 2023

FERC, led by Director Rob Thormeyer, regulates natural gas wholesale facilities, interstate pipelines, onshore LNG facilities, wholesale electric market rates, and more. The Commission consists of five appointed Commissioners overseeing key initiatives like transmission planning proposals and interc

0 views • 14 slides


ERCOT Cone Study Draft Overview

The ERCOT Cone Study Draft, prepared by The Brattle Group for ERCOT, presents an in-depth analysis of the Cost of New Entry (CONE) for different energy technologies in the Texas market. The study includes detailed cost estimates, reference technology characteristics, and alternative technology analy

0 views • 28 slides


ERCOT Resource Integration Updates - Planning and Submission Guidelines

Stay updated with important ERCOT resource integration topics including Quarterly Stability Assessment (QSA) guidelines, commissioning checklist submissions, dynamic model reviews, and more for efficient planning and compliance. Ensure timely submission and adherence to requirements outlined by ERCO

0 views • 15 slides


Enhancing ERCOT's Capacity Assessment with Demand Response Monitoring

Demand response in ERCOT has been increasing, with forecasts of continued growth. The system operator can identify MW peaks by analyzing total ERCOT load data. A proposed Demand Response Monitor would assist in predicting future capacity needs based on responses from loads like LMP energy prices and

0 views • 7 slides


Improvements to Generator Interconnection Procedures: ISO New England Response

FERC's Notice of Proposed Rulemaking seeks to enhance generator interconnection procedures to address queue backlogs and promote fairness. ISO New England outlines expansive changes, including a first-ready, first-served process, and discusses trade-offs in project viability and completion expectati

0 views • 36 slides


Proposed Enhancements for Generator Interconnection Process

Enhancements proposed for the generator interconnection process include creating a distinction between large and small generators, establishing tracking processes for small generators, and modifying existing sub-sections to incorporate small and large generators in Sections 5 and 6. The goal is to s

1 views • 12 slides


Understanding Potential Uplift Interpretation in ERCOT Protocols

ERCOT's Potential Uplift Interpretation Protocol defines Potential Uplift as the potential uplift to the Counter-Party based on short payments. The protocol outlines calculations and clarifies language ambiguity to ensure accurate interpretation. ERCOT seeks market feedback for further clarification

0 views • 6 slides


Large Load Interconnection and Modification Guidelines

Ensure new or modified large loads are interconnected in a manner that maintains system reliability and complies with relevant standards and protocols. General provisions, interconnection agreements, procedures, and study processes are outlined to facilitate smooth integration within the ERCOT syste

0 views • 22 slides


Understanding Interconnection Networks in Multiprocessor Systems

Interconnection networks are essential in multiprocessor systems, linking processing elements, memory modules, and I/O units. They enable data exchange between processors and memory units, determining system performance. Fully connected interconnection networks offer high reliability but require ext

1 views • 19 slides


Updates and Discussions on ERCOT NPRRs and NOGRRs

ERCOT Operations Working Group (OWG) discussed various NPRRs (Nodal Protocol Revision Requests) like NPRR1084, NPRR1085, NPRR1100, NPRR1118, as well as NOGRR (Nodal Operating Guide Revision Requests) NOGRR215 and NOGRR226. The group reviewed comments, concerns, and recommendations related to resourc

5 views • 9 slides


Interconnection Discussion Forum Timeline Review - 01/16/18

Interconnection Discussion Forum held on 01/16/18 discussed safety measures, meeting objectives, and timeline objectives. The agenda covered topics like submitting applications, engineering reviews, design, construction, and commissioning. Safety protocols for emergencies like earthquake and evacuat

0 views • 14 slides


Discover Rwanda: African Peering and Interconnection Forum 2020

Rwanda, the host of the African Peering and Interconnection Forum 2020, offers a remarkable blend of stunning scenery, friendly people, and economic development. With a focus on internet and ICT, the country boasts 4G LTE coverage, a growing MICE industry, investment opportunities, and accessibility

1 views • 8 slides


Evolution of MISO Interconnection Process: Enhancing Certainty and Efficiency

The MISO Interconnection Process has evolved over the years, reflecting improved certainty and efficiency. From historical trends to current statistics, the process highlights challenges, adjustments, and next steps to address issues like project dropouts, uncertainty in timing and costs, and entry

0 views • 11 slides


DGR Interconnection Conditions Overview

Interconnection requirements for Distributed Generation Resources (DGR) include coordination with Distribution Service Providers (DSP), confirmation of operational limitations, and compliance with ERCOT regulations. These conditions ensure safe and efficient integration of DGRs into the electrical g

0 views • 19 slides


Interconnection Discussion Forum Projects Update

Update on interconnection activities, projects over 1MW, and themes discussed in the forum. Includes meeting objectives, agenda topics, inquiry themes, and PG&E interconnection updates on process changes and completed/planned actions.

0 views • 15 slides


Updates on Generator Interconnection Procedures and Agreements Reform

ISO-NE is implementing further compliance reforms in response to FERC Order No. 845 regarding Generator Interconnection Procedures and Agreements. This includes proposed tariff language updates and discussions on surplus interconnection services. The changes aim to enhance the efficiency and effecti

0 views • 14 slides


ERCOT Supply Analysis Working Group February 2022 Update Report

The Supply Analysis Working Group (SAWG) updated the ERCOT committee in February 2022 on various aspects including long-term load forecast discussions, reductions in load forecasts due to COVID impacts, rooftop PV forecasts, and the December 2021 CDR review highlighting a drop in summer 2022 reserve

0 views • 8 slides


Understanding ERCOT Default Uplift and Payment Procedures

ERCOT's default uplift and payment procedures involve handling short-paying invoice recipients, implementing payment plans, and collecting total short pay amounts from QSEs and CRRAHs. Default uplift invoices may be issued after 90 days of a short pay, with a maximum cap of $2.5 million per monthly

0 views • 7 slides


Interconnection Regulation vs. Deregulation Challenges in an Emerging Liberalized Market

Interconnection between telecommunication networks and services plays a vital role in enhancing value for subscribers and facilitating the provision of a wide range of services. Regulation of interconnection is essential to protect competition, achieve social objectives, manage scarce resources, ens

0 views • 22 slides


Global Energy Interconnection and Power Grid Interconnections

Global Energy Interconnection (GEI) envisions globally interconnected power grids supporting clean, renewable energy transmission worldwide. Ultra-high voltage technology enables efficient long-distance power transmission. The concept originated in the 20th century and was endorsed by the United Nat

1 views • 40 slides


Understanding Routing in Interconnection Networks

Routing in interconnection networks involves distributing traffic evenly among paths to avoid hotspots and contention, aiming for balanced throughput. Various routing algorithms, such as greedy, uniform random, and adaptive, are discussed with examples highlighting their impact on network performanc

2 views • 38 slides


ERCOT 2015 Updates and Enhancements

ERCOT implemented changes in the Market System in 2015, including the removal of NPRR568 Phase 2 and adjustments to various pricing elements. The Settlement System also underwent updates throughout the year. These modifications aimed to enhance reliability and efficiency in ERCOT operations.

0 views • 17 slides


Understanding ERCOT SOL Methodology and NERC Standards

Explore the ERCOT SOL Methodology for Planning and Operations Horizons as outlined by Stephen Solis in 2014. Learn about System Operating Limits, Interconnection Reliability Operating Limits, and the relationship between ERCOT and Transmission Planners/Operators. Discover the purpose, changes made,

0 views • 33 slides


Challenges in ERCOT Transmission Infrastructure & Operations

Poor transmission infrastructure and restrictive interconnect practices in ERCOT are leading to dangerous operations, congestion issues, and generation revenue impacts. Concerns include increased RAS proposals, challenges with GTC management, and minimalist interconnect processes. The need for impro

0 views • 9 slides


ERCOT Congestion Management Working Group Updates

The ERCOT Congestion Management Working Group discussed various topics such as reviewing constraint management processes, implementing the Not-to-Exceed method for efficient control of GTCs, and analyzing congestion at the cap during a recent event. The group aims to improve processes, reduce transm

0 views • 7 slides


Understanding Rules 2, 15, 16, and 21 in Utility Interconnection

This draft provides an overview of rules governing utility interconnection, focusing on Rules 2, 15, 16, and 21. It outlines meeting and learning objectives related to policy questions, mitigation costs, and interconnection timelines. Definitions of Line Extension (Rule 15) and Service Extension (Ru

0 views • 46 slides


Optimizing Firm Fuel Supply Service Deployment in ERCOT

ERCOT is considering a revised approach to providing Firm Fuel Supply Service (FFSS) from individual Generation Resources through an RFP process. The proposal involves setting a minimum Load Serving Limit (LSL) to ensure the deployment of a specific amount of service and allocating FFSS based on sys

0 views • 9 slides


ICE Price Analysis for ERCOT Credit Risk Exposure

CWG/MCWG is exploring the use of ICE futures prices to assess ERCOT's credit risk exposure. This involves analyzing the relationship between ICE prices and actual RTM prices. The data inputs and transformations include calculations of daily average prices, logarithmic adjustments for linear regressi

0 views • 22 slides


A Glimpse into an ERCOT Operator's Role During the January 6, 2014 EEA Event

Amid freezing conditions and generation resource challenges, ERCOT operators responded to an emergency on January 6, 2014, leading to the declaration of Energy Emergency Alerts. This snapshot showcases the critical tasks and decisions made by ERCOT personnel during this event.

0 views • 37 slides


Reduction of Unsecured Credit Limits at ERCOT Board Meeting

ERCOT is considering reducing the unsecured credit limit from $50M to $30M based on recommendations from various committees. This reduction aims to bring down outstanding unsecured credit from $1.4B to $400M. Market participants support this move, which would make ERCOT's limit the lowest among ISO/

0 views • 5 slides


Analysis of NPRR 784 Impact on ERCOT Market Design

NPRR 784 proposes changes to how Reliability Must Run (RMR) units are priced in noncompetitive scenarios due to transmission constraints in ERCOT. This proposal is argued to be inconsistent with the market design, potentially punitive to customers, and limiting ERCOT's ability to maintain reliabilit

0 views • 7 slides


Overview of ERCOT Renewable Regions and Zone Map

ERCOT, managed by Bill Blevins, divides into seven solar and wind regions including North, South, East, West, Panhandle, Coast, and Houston. This division aids operations planning and management. The Renewable Regions Map and Zone Map play key roles in GIS status reporting and meeting presentations,

0 views • 4 slides


Evolution of Generation Deliverability Criteria in ERCOT

ERCOT's journey towards enhancing generation deliverability criteria involves requests for transmission planning considerations, workshops on tool development, and discussions on economic criteria revisions. The focus is on addressing generation constraints at peak load conditions and assessing the

0 views • 7 slides


Comparison of Generator Governor Dead-band Settings in ERCOT Interconnection

This report compares the generator governor dead-band settings in the ERCOT Interconnection for the years 2008 and 2015 from January to November. It outlines the changes in the dead-band settings over the years, including the requirements for proportional response, improvements in primary frequency

0 views • 17 slides


Proposed Changes to ERCOT Credit Forms - Update and Revision Details

Detailed updates and proposed changes to ERCOT credit forms including Letter of Credit, Surety Bond, and Guarantee Agreements discussed by Katherine Gross, Senior Corporate Counsel at ERCOT. The elimination of Guarantee Agreements due to regulatory changes and adjustments to Letter of Credit and Sur

0 views • 5 slides


Understanding Interconnection Networks in Embedded Computer Architecture

Explore the intricacies of interconnection networks in embedded computer architecture, covering topics such as connecting multiple processors, topologies, routing, deadlock, switching, and performance considerations. Learn about parallel computer systems, cache interconnections, network-on-chip, sha

0 views • 43 slides