Barbara Bush Middle School - Building Renovations and Upgrades

Slide Note
Embed
Share

Detailed improvements at Barbara Bush Middle School include fine arts classroom enhancements, band, orchestra, choir, theater, and percussion hall renovations, exterior upgrades, interior updates, kitchen renovations, security system upgrades, and promises kept. The school has made significant renovations to its facilities to provide better learning and performance spaces for its students.


Uploaded on Apr 05, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. BARBARA BUSH MIDDLE SCHOOL cfbbond.com

  2. Improvements Fine Arts Classroom and Performance Space Improvements o Band, Orchestra, Choir, Theater, and Percussion Hall Renovations Collaboration Rooms o Practice Rooms in Fine Arts Exterior Upgrades o Roof Replacement and Repair o Parking Lot Restriping Interior Upgrades o Makerspace /Engineering Room Renovation Mechanical, Electrical, and Plumbing Systems Upgrades o New LED Site Lighting and Controls o Water Bottle Fillers Landscape Improvements o Exterior Concrete Replacement o Exterior Benches Kitchen Renovation o New Kitchen Equipment New Marquee Coming Soon o o Access Control o Intercom o Card Readers o Security Alarm Cameras Bollards Fire Sprinkler System Upgrades o o o o o o o Secure Climate Controlled Server Space Cabling Wireless Upgrades Phone System Upgrades o o o o o o o PROMISES MADE PROMISES KEPT PROMISES MADE PROMISES KEPT

  3. Improvements o Fine Arts Classroom and Performance Space Improvements o Band, Orchestra, Choir, Theater, and Percussion Hall Renovations Collaboration Rooms o Practice Rooms in Fine Arts Exterior Upgrades o Roof Replacement and Repair o Parking Lot Restriping Interior Upgrades o Makerspace /Engineering Room Renovation Mechanical, Electrical, and Plumbing Systems Upgrades o New LED Site Lighting and Controls o Water Bottle Fillers Landscape Improvements o Exterior Concrete Replacement o Exterior Benches Kitchen Renovation o New Kitchen Equipment New Marquee Coming Soon o o o New Theater Arts New Practice/Ensemble Room o o o o PROMISES MADE PROMISES KEPT Band Hall Orchestra Hall

  4. Improvements Fine Arts Classroom and Performance Space Improvements o Band, Orchestra, Choir, Theater, and Percussion Hall Renovations Collaboration Rooms o Practice Rooms in Fine Arts Exterior Upgrades o Roof Replacement and Repair o Parking Lot Restriping Interior Upgrades o Makerspace /Engineering Room Renovation Mechanical, Electrical, and Plumbing Systems Upgrades o New LED Site Lighting and Controls o Water Bottle Fillers Landscape Improvements o Exterior Concrete Replacement o Exterior Benches Kitchen Renovation o New Kitchen Equipment New Marquee Coming Soon o o o New Roofing o o o o o PROMISES MADE PROMISES KEPT Parking Lot Re-striping

  5. Improvements Fine Arts Classroom and Performance Space Improvements o Band, Orchestra, Choir, Theater, and Percussion Hall Renovations Collaboration Rooms o Practice Rooms in Fine Arts Exterior Upgrades o Roof Replacement and Repair o Parking Lot Restriping Interior Upgrades o Makerspace /Engineering Room Renovation Mechanical, Electrical, and Plumbing Systems Upgrades o New LED Site Lighting and Controls o Water Bottle Fillers Landscape Improvements o Exterior Concrete Replacement o Exterior Benches Kitchen Renovation o New Kitchen Equipment New Marquee Coming Soon o o o o Before o o o o PROMISES MADE PROMISES KEPT After

  6. Improvements Fine Arts Classroom and Performance Space Improvements o Band, Orchestra, Choir, Theater, and Percussion Hall Renovations Collaboration Rooms o Practice Rooms in Fine Arts Exterior Upgrades o Roof Replacement and Repair o Parking Lot Restriping Interior Upgrades o Makerspace /Engineering Room Renovation Mechanical, Electrical, and Plumbing Systems Upgrades o New LED Site Lighting and Controls o Water Bottle Fillers Landscape Improvements o Exterior Concrete Replacement o Exterior Benches Kitchen Renovation o New Kitchen Equipment New Marquee Coming Soon o o o o Water Bottle Fillers Site Lighting o o o o PROMISES MADE PROMISES KEPT Before - Lighting After - LED Lighting

  7. Improvements Fine Arts Classroom and Performance Space Improvements o Band, Orchestra, Choir, Theater, and Percussion Hall Renovations Collaboration Rooms o Practice Rooms in Fine Arts Exterior Upgrades o Roof Replacement and Repair o Parking Lot Restriping Interior Upgrades o Makerspace /Engineering Room Renovation Mechanical, Electrical, and Plumbing Systems Upgrades o New LED Site Lighting and Controls o Water Bottle Fillers Landscape Improvements o Exterior Concrete Replacement o Exterior Benches Kitchen Renovation o New Kitchen Equipment New Marquee Coming Soon o o o o o Site Concrete Site Concrete Site Concrete o o o PROMISES MADE PROMISES KEPT Exterior Benches

  8. Improvements Fine Arts Classroom and Performance Space Improvements o Band, Orchestra, Choir, Theater, and Percussion Hall Renovations Collaboration Rooms o Practice Rooms in Fine Arts Exterior Upgrades o Roof Replacement and Repair o Parking Lot Restriping Interior Upgrades o Makerspace /Engineering Room Renovation Mechanical, Electrical, and Plumbing Systems Upgrades o New LED Site Lighting and Controls o Water Bottle Fillers Landscape Improvements o Exterior Concrete Replacement o Exterior Benches Kitchen Renovation o New Kitchen Equipment New Marquee Coming Soon o o o New Freezer New Serving Line o o o o o PROMISES MADE PROMISES KEPT New Cooler New Serving Line

  9. Improvements Fine Arts Classroom and Performance Space Improvements o Band, Orchestra, Choir, Theater, and Percussion Hall Renovations Collaboration Rooms o Practice Rooms in Fine Arts Exterior Upgrades o Roof Replacement and Repair o Parking Lot Restriping Interior Upgrades o Makerspace /Engineering Room Renovation Mechanical, Electrical, and Plumbing Systems Upgrades o New LED Site Lighting and Controls o Water Bottle Fillers Landscape Improvements o Exterior Concrete Replacement o Exterior Benches Kitchen Renovation o New Kitchen Equipment New Marquee Coming Soon o o o o o o o o PROMISES MADE PROMISES KEPT

  10. Safety and Security Access Control o Intercom - 2023 o Card Readers- 2023 o Security Alarm Cameras Bollards Fire Sprinkler System Upgrades o o o o Exterior Camera Video Intercom Card Reader Card Readers Cameras Fire Alarm Fire Alarm Panel PROMISES MADE PROMISES KEPT Intercom Bollards/Benches Access Control

  11. Technology Secure Climate Controlled Server Space Cabling Wireless Upgrades Phone System Upgrades o o o o Wireless Upgrades Clocks PROMISES MADE PROMISES KEPT Cabling Secure Climate Controlled Server Space

  12. FCI Update PROMISES MADE PROMISES KEPT

  13. FCI Update Building Element Type/Material Prior Condition Current Prior Description 2022 Reno Comments On-Site Utilities & Drainage Site Drainage / Erosion Control Site Lighting - Parking Lots Exterior Concrete Pads & Pavement- Around building, mechanical yards Fire Hydrants / Utility Vaults / Misc. Grease Trap Site Parking & Drives Pavement - Roads / Drives / Parking Areas Good Good Good Good Positive slope away from building, no visible signs of erosion or ponding water. Fair Fair Fair Fair Fair Fair Good Good Clean and clear of cracks, heaving, potholes. Joint Sealer is properly in place. Fire lane paint striping in good condition.Clean and clear of cracks, heaving, potholes. Joint Sealer is properly in place. Minor to moderate signs of age and deterioration but still visible. Handicapped spaces incorrectly marked or striped. Good Good Fire Lanes Fair Good Striping - Parking lot and fire lane Parking Lots Re-striped Good Good Curbs Free of cracks, damage and almost new in appearance. Site Lighting Good Good Site Lighting All fixtures are working properly and have no visible damage. Lighting is appropriate for security. Site Security Megapixels of Resolution Security Cameras Chain Link Fencing / Gates 12 93 Updated camera system Good Good No damage to material and poles, gates are working properly. Misc. Stuctures Material:Stone Good Good Site Walls - Retaining / Screen No signs of damage, settling or rotation. Moderate to Minor signs of damage to dumpster walls, may need a refresh of finish paint if applicable and additional bollards. Gates function as required. Fair Fair Dumpster Service Area Bol lar ds Site Signage - Directional / Handicapped Misc. Site work / Site Structures Circulation Sidewalks Sta irs Ra mp s ADA Compliance / Accessiblity Compliant Sidewalks/Curbs Compliant Ramps & Handrails No Scope Material: Good Good Concrete Clearly marked and strongly visible. Almost new in appearance. Good Good Good Good Bleachers Good Good Clean and clear of cracks or heaving. Joint Sealer is properly in place. Clean and clear of cracks or heaving. Joint Sealer is properly in place. Rise and Run is compliant. Handrails (if present) are compliant & finish is in good standing. Good Good Good Good Clean and clear of cracks or heaving. Joint Sealer is properly in place. Slope is compliant. Handrails (if present) are compliant & finish is in good condition. Good Good Good Good 21 21 Scored Categories 16 5 0 0 17 4 0 0 Good Previous Aggregate Score: Reno Aggregate Score: 92 94 Site Fair Poor N/A

  14. FCI Update Building Element Type/Material Prior Condition Current Prior Description 2022 Reno Comments Building Structure/Foundation Foundation Substructure - Slab - on - Grade Basement / Below Grade Exterior Walls Miscellanous Superstruct ure Fireproofing Pre-Engineered Metal building Building Exterior Shell Roofing General Roof Condition (Visual Inspection) Roof Warranty Status Good Good Type: Slab on Grade No signs of cracking or heaving. N/A N/A N/A N/A N/A N/A N/A N/A built up roof Roof is nearing the end of it's expected useful life. Some leaks are reported with areas of ponding. Some sealants and flashings are in need of repair or replacement. Roof replaced. Single Ply Membrane N/A Fair Good New Roofing Manufacturer / Warranty Issuer Years Remaining in Warranty Period UNA-Clad Duro-Last N/A N/A N/A N/A N/A Skylights Roof Curbs / Openings / Misc. Exterior Walls Exterior Wall Material Building Caulking/Sealant Exterior Painting Windows/Glazed Walls Windows Good Fair N/A Good Fair N/A Material: Brick Veneer is free of cracks, signs of settling, rotation or damage. May show minor signs of aging, minor fading or stains. Not in Scope Glazing Type: Single Pane Frame Type: Painted Hollow Metal Addition aluminum double glazed Paint needed at original HM Not in Scope Not in Scope Fair Fair Exterior Doors Systems Exterior Doors Frame Type: Hollow Metal Panel Type: Hollow Metal Minor scratches or signs of wear, may need a refresh of finish, door hardware is compliant and functioning properly. Minor scratches or signs of wear, may need a refresh of finish, door hardware is compliant and functioning properly, motor works as required (if applicable). Fair Fair Not in Scope Fair Fair Exterior Overhead Doors Card Access Reader Door Bell Peep Hole Canopies Type: Manual Not in Scope Replaced with all new card readers Fair Good No visible damage, proper weather coverage, finishes are almost new in appearance. No signs of settling or movement. Good Good Canopy Type: Attached to Building Loading Area N/A Good N/A Good Raised Loading Dock Independent Loading Area Misc. Exterior Exterior Soffit - Material Exterior Louvers / Sunscreens No visible damage, no signs of settling or movement. Good N/A Good N/A Material: Plaster Almost new in appearance, no visible fading or stains. 11 11 Scored Categories 5 6 0 9 7 4 0 9 Good Exterior Previous Aggregate Score: Reno Aggregate Score: 82 88 Fair Poor N/A *Original score didn't review card readers, previous score added to original score to capture condition

  15. FCI Update Building Element Type/Material Prior Condition Current Condition Prior Description 2022 Reno Comments Interior Finishes Interior Ceiling Finishes Acoustical Ceilings - 2x2 Tiles Fair N/A N/A Fair N/A N/A Good Good N/A N/A Fair N/A N/A Good Scrubbable Finish Yes Minor signs of aging with minimal apparent stains, leaks, sagging or damage. Replaced in Kitchen Renovation Acoustical Ceilings - 2x4 Tiles Plaster Ceilings Scrubbable Finish Painted Gypsum Ceiling Metal Ceilings Exposed / Painted Ceilings Minor signs of aging with minimal apparent stains, leaks, sagging or damage. Soffit / Bulkhead Walls Almost new in appearance, no signs of sagging, damage, leaks, or stains. Good Good Special/Misc. Almost new in appearance, no signs of sagging, damage, leaks, or stains. Interior Floor Finishes Good Good Resilient Flooring - VCT Almost new in appearance, no signs of damage or stains, properly sealed and finished. Good Good Quarry Tile Almost new in appearance, no signs of damage or stains, properly sealed and finished. Good N/A N/A N/A Good N/A N/A N/A Ceramic Tile Terrazzo Poured Resinous Epoxy Finish Concrete - (sealed) Carpet (Classrooms, Library, and Administration) Carpet (Fine Arts Wing) Natural Stone Wo od Special/Misc. Interior Wall Finishes Painted Gypsum Board - Full Height Almost new in appearance, no signs of damage or stains, properly sealed and finished. Fair Fair Minor signs of aging with minimal apparent stains or damage, may need to be resealed. Fair N/A Good N/A Replaced as part of renovation Good Good Almost new in appearance, no signs of damage or stains, properly sealed and finished. Good Good Almost new in appearance, no signs of damage, stains or cracking. Good Good Painted CMU - Full Height Painted Gypsum Board + Tile Wainscot Almost new in appearance, no signs of damage, stains or cracking. Good Good Almost new in appearance, no signs of damage, stains or cracking. Good Good Full Height Tile Almost new in appearance, no signs of damage, stains or cracking. N/A N/A PLAM Good Good FRP Wood Panels Interior Wall Base & Trim Rubber Base (Classrooms, Library, Administration) Rubber Base (Fine Arts Wing) Almost new in appearance, no signs of damage, stains or cracking. N/A N/A Fair Fair Minor signs of aging with minimal damage and properly installed. Fair Good Replaced in Fine Arts Wing Good N/A N/A N/A N/A Good N/A N/A N/A N/A Quarry Tile Ceramic Tile Terrazzo Poured Resinous Epoxy Wood Base Almost new in appearance, no signs of damage and properly installed. 0 0 0 0 Interior

  16. FCI Update Misc. Interior Interior Door Systems Frame Type: Panel Type: Hollow Metal Minor scratches or signs of wear, may need a refresh of finish, door hardware is compliant and functioning properly. No visible damage, proper weatherproofing/threshold installed, door hardware compliant and functioning properly, motor works as required (if applicable). Fair Fair Not in Scope Good Good Interior Overhead Door/Grille Specialty Doors Millwork Cabinets Corner Guards Interior Signage Digital Clocks Operable Partitions Marker & Tack Boards Projection Screens A/V Equipment Type: Manual Type: N/A N/A Good Good Good Fair N/A Good Good Good N/A Good Good Good Good N/A Good Good Good Type: Stainless Steel Almost new in appearance. Upgraded existing clocks to new digital clocks No cracking or warping of the board surface. Replaced in Areas of Renovation Upgraded in Areas of Renovation Required Number of Lockers Lockers: Good Good Provided Number of Lockers: Good Good Fair Good Good Good Good Good Good Good Railings Elevator Cab Finishes Wireless Access Toilet Partitions Toilet Accessories Interior Window Blinds/Shades Upgraded as Part of Renovation Material Type: Plastic Almost new condition, proper installation. Type of Blinds: Metal Type of Shades: N/A Operation: Manual Good Good No visible damage, motor properly functions (if applicable). Food Service Area Equipment Condition Digital Menu Boards Restrooms open to Kitchen? Drinking Fountains in Cafeteria? Good N/A No No Good N/A No No Replaced as Part of Renovation Acces sibility Good Good Good Good Good Fair Good Good Good Good Good Fair Restrooms Drinking Fountains Ramps Signage Doors Millwork Compliant Compliant Compliant Compliant Compliant Few compliance items 43 43 Scored Categories 31 36 Previous Aggregate Score: 88 Good 10 5 Reno Aggregate Score: 92 Fair 0 0 Poor Interior * Separated out Finishes to capture what was replaced in renovation. Provided initial scoring for clocks and 17 17 N/A wireless access as they weren't originally evaluated

  17. FCI Update BARBARA BUSH MIDDLE SCHOOL ITEM OPERATIONAL, SYSTEMS & CODE DEFICIENCIES HVAC AGE: 19 Years 142,000 sf DESCRIPTION DESCRIPTION Assessed Scope Performed Scope No Scope Performed Prior Grade Current Task: Replace 4 ton Carrier split system installed in 2000. 98 98 Task: No Scope Performed EMCS PLUMBING Task: Replace poor condition Oasis electric water coolers. Provide new electric water coolers with bottle fillers. Task: Replace 1997 A.O. Smith electric hot water heater. Task: Provide new electric water coolers with bottle fillers. Scope Completed No Scope Performed Scope Completed 87 95 Task: ELECTRICAL SYSTEM 95 95 INTERIOR LIGHTING Task: Provide tunable lighting for special education classrooms. Task: Replace metal halide fixtures in gym with LED fixtures. No Scope Performed 90 95 Scope Completed EXTERIOR LIGHTING Task: Replace all existing exterior wall packs with LED fixtures. Task: Renovate all exterior parking lot lighting to LED. Scope Completed Scope Completed 85 95 FIRE ALARM SYSTEMS Task: Replace the Honeywell fire alarm system was installed in 2006. 70 95 Scope Completed Task: No Scope FIRE PROTECTION SYSTEM 90 90 OTHER Task: Provide digital marque. Provide power and connectivity. Task: Replace cooler/freezer units. Scope to Be Completed 2023 Scope Completed NA NA TOTALS 91 95 MEP

  18. FCI Update Bush MS Technology and Security Status System Notes Possible Score 10 15 Corgan Score (2018) 8 13 TNCG Score (2022) 9 13 Cabling Infrastructure Local Area Network Small improvements to renovation areas and all new wireless access point cabling No upgrade (that True North is aware of) Wireless could use a refresh in the next few years but in good condition right now. New cabling in place to support refresh. Wireless LAN 15 13 13 Unified Comm (Phone) System 10 10 10 Upgraded prior to renovation project Video Management System Public Address 10 10 7 7 10 10 Complete upgrade to Genetec Complete upgrade to Informacast Premise Access Control (and Intrusion) Intercom System Special Space AV 10 5 5 7 3 4 10 5 4 Complete upgrade to Genetec Added new intercom stations with renovation District item. AV upgrade as part of technology package Instruction Space Presentation Total Score 10 100 8 80 9 New Interactive Displays in renovation areas matching District standard 93 Technology

  19. FCI Update Barbara Bush MS Assessment After Bond Improvements Site : 92 Exterior: 82 Interior: 88 MEP: 91 Technology: 80 Site : 94 Exterior: 88 Interior: 92 MEP: 95 Technology: 93 Score: 87 Score: 92 PROMISES MADE PROMISES KEPT

  20. THANK YOU

More Related Content