Vision and Strategy for Sustainable Development in Lao PDR

 
N
a
t
u
r
a
l
 
R
e
s
o
u
r
c
e
s
 
a
n
d
 
E
n
v
i
r
o
n
m
e
n
t
V
i
s
i
o
n
,
 
S
t
r
a
t
e
g
y
 
a
n
d
 
A
c
t
i
o
n
 
P
l
a
n
 
D
e
p
a
r
t
m
e
n
t
 
o
f
 
P
l
a
n
n
i
n
g
 
a
n
d
 
C
o
o
p
e
r
a
t
i
o
n
M
i
n
i
s
t
r
y
 
o
f
 
N
a
t
u
r
a
l
 
R
e
s
o
u
r
c
e
s
 
a
n
d
 
E
n
v
i
r
o
n
m
e
n
t
V
i
e
n
t
i
a
n
e
,
 
L
a
o
 
P
D
R
 
Overall Goal
 
With 4 vision objectives & 18 target indicators
Note: The indicators are open for discussion
 
Four Vision Objectives
 
1. Make Lao PDR
Green to ensure
peoples livelihood,
biodiversity and
contribute to mitigate
the global warming
from greenhouse gas
emission
 
2. Make Lao PDR
Clean and
Beautiful to ensure
good
environmental
quality for Lao
people
 
3. Contribute to the
green growth
economy to achieve
sustainable
development and
contribute to the
climate change
mitigation
 
4. Prepare Lao PDR
for Climate Change
Adaptation and
Reduction of natural
Disaster impact
 
Vision Target Indicators
 
1.1 
Increase
 forest
area (cover) in the
country by 70%
 
1.2 
Reserve 
50% of
protected and
protection area for
biodiversity
protection and
managed effectively
 
1.3 Streets,
household plots,
public building
areas and office
areas 
greened
 with
trees
 
1. 4 Promote cities
larger than 100,000
people having 
a park
available 
with trees
and effective
management system
for people’s
recreation
 
1. Make Lao PDR Green to ensure peoples livelihood, biodiversity and
contribute to mitigate the global warming from greenhouse gas emission
with 4 milestones
 
Vision Milestones
 
 
2.1 Water
quantity and
quality in 10 river
basins to satisfied
the national water
quality and
quantity standards
to ensure
minimum negative
impact on
ecosystem
 
2.2 Agriculture and
forestry sector has
reduced the use of
hazardous chemicals
by 15%;
_________________
 
2.3 Reduce the waste
generation in the
municipal areas
across the country by
30%
 
2.4 60% of household in
the municipalities in the
six priority provinces and
household along the
national road 13
implement proper waste
separation practise
____________________
2.5 Reduce water and air
pollution for industries
and services by 30%
 
2. Make Lao PDR Clean and Beautiful to ensure good environmental quality
for Lao people with 7 milestones:
 
2.6 Main roads and
public areas in
municipalities and the
important tourist areas
have effective and
efficient clean up waste
collection system
____________________
2.7 Mainstream the ISP
in the development and
improvement of cities
and rural areas
 
Vision Milestones
 
 
3.1 
Increase
 the
green production
satisfying ISO
14001
environmental
management
standards 
every
year
 
3.2 
Reduce 
resource
consumption (water,
energy and raw
materials) 
from
industry and tourist
services and
domestic
households every
year
 
3.3 
Minimise
 the
socio-economic and
environmental impact
from investment
projects (hydropower,
mining,
infrastructure,
industry, industrial
plantation, urban
development etc)
 
3. Contribute to the green growth economy to achieve sustainable
development and contribute to the climate change mitigation
with 4 milestones:
 
3.4 Reduce the
greenhouse gas
emission from
transport of goods
and people by 15%
 
Vision Milestones
 
 
4.1 Lao 
people have
easy and timely access
to updated climate
change and disaster
data and information
to support livelihood
and socio-economic
development planning
 
4.2 The people that
live in 
all
 areas
vulnerable to disaster
have knowledge and
good understanding
and are prepared to
respond and recover
from disasters
 
4.3 
Reduce the risk
and impact
 from
natural disaster to
livelihood, agricultural
products, public and
private investment
 
4. Prepare Lao PDR for Climate Change Adaptation and Reduction of
natural Disaster impact  with 3 milestones:
 
5 results
that 5 themes & 21 strategy statements try to achieve
 
Theme 1 Sustainable Planning and
Management of the Use of Natural Resources
(Land, water, forest and minerals)
 
Result 1: Sustainable use, management, protection and conservation of natural
resources to support long term sustainable economic development through 4
strategy statement:
1.1 Implement 
sustainable, fair and integrated land use master plan and
administration system to reduce conflict in land use and support environmental
quality management and sustainable use of natural resources
1.2 Implement i
ntegrated water resources management plan to ensure the balance
between the use of water resources
1.3 Implement sustainable and participatory forest and biodiversity administration and
management system to ensure the forest area, access to non-timber forest
products, food security,  improved rural livelihood and biodiversity protection;
1.4 Implement sustainable mineral resources development and management plan to
ensure maximum social benefits and minimum negative environmental impacts
from mining activities in particular in affected communities.
 
Theme 2 Sustainable Environmental Quality
Management for Green, Clean and Beautiful
City and Rural Development
 
Result 2: Healthy environmental quality in Lao Cities and rural areas  to ensure
wellbeing of Lao people through 8 strategy statements:
2.1 
Promote the implementation of land use master planning and ISP in the sustainable
improvement and development of cities and rural areas;
2.2 
Implement legislations, standards, guidelines and mechanisms for effective and efficient
pollution control and management in municipalities across the country (land, water and air)
2.3 Implement mechanisms to promote    green production, initiatives and lifestyle
2.4 
Continue to implement education and awareness programs on environmental protection and
sustainable use of natural resources
2.5 
Promote the implementation of ISO14001/2004 Environmental Management System in
medium and large scale industries across the country
2.6 Promote the implementation of the 3R concept (reduce, reuse and recover) in the tourism
service sector
2.7 Effective and strict implementation of EIA process as an important tools in planning and
decision making, for approval of investment projects and activities
2.8 Engage investment projects and local based business to contribute to develop and improve
the living standard and the local environmental quality
 
Theme 3 Strengthening capacity of Lao PDR on
Climate Change Adaptation and Mitigation and
Disaster Risk Reduction
 
Result 3: Lao PDR and its people is informed and prepared for adapting climate
change, responding to the CC impacts (Natural Disaster) and contributing to
global greenhouse gas emission reduction:
3.1 
Mainstream  climate change adaptation and mitigation and disaster management into
relevant sector policies, program and action plans;
3.2 
Implement research programs to study and disseminate the updates climate change scientific
data and develop maps of vulnerable and high risk disaster areas to support in policy and
strategy planning, national socio-economic development plans of line sectors at central and
local levels and for people livelihood;
3.3 
Implement public awareness raising programs on climate change and related impacts  to
ensure the effective use of local resources, appropriate governance arrangements and
community participation in CC adaptation and disaster management and prevention;
3.4 
Implement effective and efficient disaster protection and prevention measures and
management system including preparedness, warning, protection, rescue, recover and
rehabilitation  systems, to ensure the protection and relocation of people and valuable assets
in time.
 
Theme 4 Maintaining and Enhancing MoNRE
Coordination, Cooperation and Integration with Line
Sectors and Regional and International Initiatives
 
Result 4: Effective and efficient coordination and collaboration with line section and
regional and international partners to ensure the implementation of MEAs
mutual benefits of shared natural resources and minimal cumulative and trans-
boundary impacts through 2 strategy statements:
4.1 Effectively and efficiently coordinate and cooperate with line sectors (at central
and local levels) and regional and international organisations, to ensure
implementation of MoNRE vision, strategy and action plan including MEAs related
to natural resources and environment;
4.2 
Effectively and efficiently report the progress of the implementation of MoNRE
vision, strategy and action plan, including MEAs related to natural resources and
environment, to ensure information and data sharing for better management of
shared natural resources, to reduce cumulative and trans-boundary impacts.
 
Theme 5 Building MONRE Institutional Capacity
effectively, efficiently and sustainably
 
Result 5: MONRE implements its mandate effectively, efficiently and sustainably
through 3 strategy statements:
5.1 
Improve and develop the necessary legislations, guidelines, mechanisms and
procedures for sustainable implementation of the MoNRE mandate
5.2 
Implement short and long term human resource development and management
plans to ensure sufficient, efficient and competent technical staff to fulfil the
MoNRE mandate.
5.3 
To ensure that MoNRE has the  funding sources and sufficient available budget
with easy access and timely  transfer of the budget to ensure fulfilment of the
MoNRE mandate.
 
With 46 milestones that 81 focused actions try to
achieve under 7 Programmes and 55 priority projects
 
Milestones
Programme
 1
 
Land Administration and
Management
 
1.
Completion of development and implementation of National Master Land Use Plan and
Integrated Land Allocation in 18 provinces and 91 districts and 
3,492 
 villages across the
country with the participation of districts and villages;
2.
Completion of development and lunching of land legislation, such as land policy and land law,
together with completion of development of comprehensive integrated land administration
mechanism and system
3.
Issuing 500,000 land titles across the country;
4.
Completion of issuance of land census of 1.4 million plots across the country and  development
of land database system with registration of  900,000 plots in the database system;
5.
Strive for increasing revenue from technical services by 15 to 20% per year
.
 
Milestone
Programme 2
 
Water Resources, Meteorology and Hydrology
Management
 
1.
Completion of development and implementation of revision and approval of water law and  decree on river
basin committee
2.
Completion of development and implementation of approval of meteorology and hydrology law and
relevant regulations;
3.
Completion of development and implementation of mechanisms and integrated water resources
management plans (IWRMP) in the 10 priority river basins
4.
Completion of development and implementation of mechanisms and infrastructure basis for monitoring and
assessment of  the conditions of surface water and groundwater
5.
Completion of development and implementation of the scope for research on the hydrologic, physical,
chemical and biological characteristics of water bodies and classification of water bodies, watersheds and
aquifer recharge areas in the 7 priority river basins and other potential sub-basins;
6.
Completion of development and implementation of the database and database network system  of water
resources  from central until local level across the country;
7.
Completion of development and implementation of pilot demonstration projects on a national integrated
water park as a resource area for research, study tours, training, and knowledge exchange and, general
public awareness rises;
8.
In cooperation with Water Resource Faculty, National University of Lao PDR, Completion of development
and implementation of curriculums and the capacity building programs in the hydrology and meteorology
sector for bachelor degree.
9.
Completion of National and 3 Regional Water Analysis Laboratories
 
 
Programme 3
: 
Forest Resources and
Biodiversity Management
 
1.
Completion of the design of, and obtaining approval for a new Forest Law and its decrees
(conservation and protection forests) in order to modernize forest and biodiversity
management
2.
Completion of forest survey, allocation and rehabilitation to achieve 70% of forest are of total
area (2020) with 35,000 ha of forest plantation and 1.5 million ha of natural grown forest
3.
Completion of improvement of forest administration system to ensure sustainable and
effective use and management of forest resources;
4.
Completion of d
evelopment and  improvement of registration of biodiversity species in Lao
PDR and endanger biodiversity species.
5.
Completion of development and implementation of baseline study and development of
mechanisms, regulations and guidelines for managing and reducing greenhouse gases from
deforestation and forest degradation;
6.
Completion of development and implementation of two national biodiversity parks: Nam At-
Phou Lauy and Nakhai-Nam Theun Protected Forests
 
Programme 4
 
Mineral Resources Management
 
1.
Completion of development and implementation of integrated database management system to
ensure coordination between line sectors as a basis for sustainable planning and  management of
mineral resources
Development of 1:200,000 map 
of potential mineral resources areas for economic
development in the northern part
Development of 1:200,000 map of the 
mineral resources 
area of 
75,045 
km2 to achieve 50%
of such area
;
Completion and lunching of decree on mineral conservation, together with completion of
the survey and identification of mineral resources and  planning for sustainable
management, conservation and protection of 
12 areas (27,950.82 km2)  across the country
reserved and protected
 for 
long term sustainable development;
2.
Completion of development, implementation and monitoring and evaluation of the
implementation mechanism and regulations for management of mineral prospecting and
exploration and feasibility studies to minimise the social and environmental impacts and
ecological balance and maximize the optimal socio-economic benefits.
3.
Completion of improvement of mineral laboratory and museum
 
Programme 5.1
 
Environmental Quality Promotion
 
1.
Completion of development, approval and lunching of SEA decree and guideline and ISP decree
and guideline
2.
Completion of development and implementation of national, provincial and district ISP and 50%
of the ISP provinces have mainstreamed ISP into the socio-economic development planning;
3.
Completion of development and implementation of the concept frameworks, mechanisms and
guideline for sustainable city development to ensure Green, Clean and Beautiful cities piloted in
cities along road 13 located along Mekong River and at least 10 model project or activities and
five  green, clean and beautiful model schools per province;
4.
Completion of development and implementation of national policies and mechanism to promote
the green initiatives in Lao PDR society including integrating regional and international green
initiatives.;
5.
Completion of development and implementation of environmental education curriculum for all
education levels in corporation with Ministry of Education
6.
Number of Lao people that have knowledge and are aware of environmental pollution and the
possible health impact, proper environmental quality management and sustainable resource
consumption have increased
 
Programme 5.2
 
Pollution Control and Management
 
1.
Completion of the development and implementation of legislations, standards, guidelines and
mechanisms for pollution control and management in municipalities across the country:
-Reduce water and air pollution for industries and services by 10%;
Protect water quality in 10 river basins to satisfy water quality standards to ensure minimum
negative impact
Agriculture and forestry sector has reduced the use of hazardous chemicals by 5%;
Reduce the waste generation in the municipal areas across the country by 10%
20% of household in the municipalities in the six priority provinces and household along the
national road 13 implement proper waste separation practise
2.
Main roads and public areas in municipalities and the important tourist areas have effective and
efficient clean up waste collection system
3.
Completion of development and implementation of a centralized pollution database covering
solid waste, hazardous material, soil pollution, air and noise emission and wastewater in the 6
targeted Cities located along Mekong rivers;
 
Programme 5.3
 
Environmental Impact Assessment,
Management and Monitoring
of Investment Projects
 
1.
Completion of development, improvement and implementation of legislations and technical
guidelines and checklists related to EIA process as an important tools in planning and decision
making, for approval of (concession agreements) investment projects and activities  (hydropower
projects, mineral prospecting and exploration projects, agricultural projects, industrial projects,
and other infrastructure projects)
2.
Completion of the development and implementation of effective and efficient  environmental
management and monitoring systems of the implementation of environmental and mitigation
measure of all investment projects and activities that receive Environmental Compliance
Certificate approving the EIA report to ensure that the project owner fully and adequate comply
with environmental and social obligations
3.
Completion of development and operation of advanced database for effective and efficient data
and information management of environmental compliance certificates and compliance
monitoring of the implementation of environmental and social obligations of all development
projects across the country;
 
Programme 5.4 Climate Change Adaptation and
Disaster Risk Reduction
 
1.
Completion of development and implementation of climate change and disaster laws, strategies and action
plan on disaster reduction 2015 to 2020, NCCC 3, (NAPs) and INDCs report;
2.
Completion of establishment of disaster prevention and management committee and climate change
committee at central and local levels;
3.
Completion of the development and implementation of efficient and effective guidelines and mechanisms for
mainstreaming   disaster protection, prevention and management and climate change adaption line sector
policies, strategies, programs and plans at central and local levels piloting climate change adaptation project in
agriculture and forestry sectors and disaster protection and prevention in public works sector;
4.
Completion of establishment of national disaster prevention and climate change fund as an important
mechanism for climate change scientific research (study of potential impacts on environmental, social and
economic aspects in different sectors) and identification and assessment of vulnerable areas to climate change
and natural disaster risk
5.
Completion of development, implementation and monitoring of disaster protection and prevention measures
and disaster management system  (warning system, emergency response and assistance, rehabitation and
recovery) in all disaster venerable and high risk areas to ensure the protection and relocation of people and
valuable assets in time;
6.
Completion of conducting research programs to study and disseminate the updates climate change scientific
data and develop maps of vulnerable and high risk disaster areas to support in policy and strategy planning,
national socio-economic development plans of line sectors at central and local levels and for people livelihood;
 
Programme 6 Coordination, Cooperation and
Integration with Line Sectors, Regional and
International Initiatives
 
1.
Completion of streamlining and mainstreaming MEAs and regional cooperation frameworks,
including MRC and AEC and commitment related to natural resources and environment  into
national socio-economic development plans, MONRE action plans and line sector plans to ensure
the implementation of committed obligations ;
2.
Development and implementation of effective and efficient mechanism for coordinating,
monitoring, and reporting systems to ensure regular report on the implementation of MEAs, and
regional and international cooperation frameworks.
 
Programme 7 Institutional Capacity Development
 
1.
Completion of improvement, development and implementation of  the necessary legislations,
standards, guidelines, mechanisms and procedures for sustainable implementation of the MoNRE
mandate
2.
Completion of improvement and implementation of the effective and efficient MONRE’s
institutional mechanisms and short and long term human resource development and
management plans to ensure sufficient, efficient and competent technical staff to fulfil the
MoNRE mandate ;
3.
Implementation of sustainable financial mechanism for ensuring sufficient and funding timely
obtaining and transparent utilization of funds for MONRE activities;
4.
Completion of development and Implementation of centralized and integrated database system
for efficient and effective NRE data and information management and sharing  within MONRE and
with line ministries, universities, Medias, private sectors, international organizations, donors and
regional environmental authorities.
 
THANK YOU VERY MUCH
 
Slide Note
Embed
Share

Department of Planning and Cooperation under the Ministry of Natural Resources and Environment in Vientiane, Lao PDR, has set a vision towards 2030 with a strategy for 2025 to make Lao PDR green, clean, and beautiful. The focus is on green economic growth for sustainable development and climate change adaptation. The overall goal includes effective natural resources management to support national economic development. Four vision objectives aim to ensure livelihood, biodiversity conservation, green growth economy, and climate change adaptation. Specific vision target indicators and milestones have been outlined to achieve these objectives.

  • Sustainable Development
  • Lao PDR
  • Natural Resources
  • Environment
  • Climate Change

Uploaded on Jul 29, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. Natural Resources and Environment Natural Resources and Environment Vision, Strategy and Action Plan Vision, Strategy and Action Plan Department of Planning and Cooperation Department of Planning and Cooperation Ministry of Natural Resources and Environment Ministry of Natural Resources and Environment Vientiane, Lao PDR Vientiane, Lao PDR

  2. Overall Goal Vision towards 2030 Strategy towards 2025 Making Lao PDR Green, Clean and Beautiful, based on Green Economic Growth, to ensure Sustainable Resilient Development and Climate Change Adaptation Five Years Action Plan 2016-2020 Ensure and implement an effective and efficient natural resources management system to support the national economic development in the direction of green growth to achieve sustainable development Ensure an effective and efficient natural resources management system to support the national economic development in the direction of green growth to achieve sustainable development

  3. With 4 vision objectives & 18 target indicators Note: The indicators are open for discussion

  4. Four Vision Objectives 1. Make Lao PDR Green to ensure peoples livelihood, biodiversity and contribute to mitigate the global warming from greenhouse gas emission 2. Make Lao PDR Clean and Beautiful to ensure good environmental quality for Lao people 3. Contribute to the green growth economy to achieve sustainable development and contribute to the climate change mitigation 4. Prepare Lao PDR for Climate Change Adaptation and Reduction of natural Disaster impact

  5. Vision Target Indicators 1. Make Lao PDR Green to ensure peoples livelihood, biodiversity and contribute to mitigate the global warming from greenhouse gas emission with 4 milestones 1.1 Increase forest area (cover) in the country by 70% 1.2 Reserve 50% of protected and protection area for biodiversity protection and managed effectively 1.3 Streets, household plots, public building areas and office areas greened with trees 1. 4 Promote cities larger than 100,000 people having a park available with trees and effective management system for people s recreation

  6. Vision Milestones 2. Make Lao PDR Clean and Beautiful to ensure good environmental quality for Lao people with 7 milestones: 2.1 Water quantity and quality in 10 river basins to satisfied the national water quality and quantity standards to ensure minimum negative impact on ecosystem 2.2 Agriculture and forestry sector has reduced the use of hazardous chemicals by 15%; _________________ 2.4 60% of household in the municipalities in the six priority provinces and household along the national road 13 implement proper waste separation practise ____________________ 2.5 Reduce water and air pollution for industries and services by 30% 2.6 Main roads and public areas in municipalities and the important tourist areas have effective and efficient clean up waste collection system ____________________ 2.7 Mainstream the ISP in the development and improvement of cities and rural areas 2.3 Reduce the waste generation in the municipal areas across the country by 30%

  7. Vision Milestones 3. Contribute to the green growth economy to achieve sustainable development and contribute to the climate change mitigation with 4 milestones: 3.1 Increase the green production satisfying ISO 14001 environmental management standards every year 3.2 Reduce resource consumption (water, energy and raw materials) from industry and tourist services and domestic households every year 3.3 Minimise the socio-economic and environmental impact from investment projects (hydropower, mining, infrastructure, industry, industrial plantation, urban development etc) 3.4 Reduce the greenhouse gas emission from transport of goods and people by 15%

  8. Vision Milestones 4. Prepare Lao PDR for Climate Change Adaptation and Reduction of natural Disaster impact with 3 milestones: 4.1 Lao people have easy and timely access to updated climate change and disaster data and information to support livelihood and socio-economic development planning 4.2 The people that live in all areas vulnerable to disaster have knowledge and good understanding and are prepared to respond and recover from disasters 4.3 Reduce the risk and impact from natural disaster to livelihood, agricultural products, public and private investment

  9. 5 results that 5 themes & 21 strategy statements try to achieve

  10. Theme 1 Sustainable Planning and Management of the Use of Natural Resources (Land, water, forest and minerals) Result 1: Sustainable use, management, protection and conservation of natural resources to support long term sustainable economic development through 4 strategy statement: 1.1 Implement sustainable, fair and integrated land use master plan and administration system to reduce conflict in land use and support environmental quality management and sustainable use of natural resources 1.2 Implement integrated water resources management plan to ensure the balance between the use of water resources 1.3 Implement sustainable and participatory forest and biodiversity administration and management system to ensure the forest area, access to non-timber forest products, food security, improved rural livelihood and biodiversity protection; 1.4 Implement sustainable mineral resources development and management plan to ensure maximum social benefits and minimum negative environmental impacts from mining activities in particular in affected communities.

  11. Theme 2 Sustainable Environmental Quality Management for Green, Clean and Beautiful City and Rural Development Result 2: Healthy environmental quality in Lao Cities and rural areas to ensure wellbeing of Lao people through 8 strategy statements: 2.1 Promote the implementation of land use master planning and ISP in the sustainable improvement and development of cities and rural areas; 2.2 Implement legislations, standards, guidelines and mechanisms for effective and efficient pollution control and management in municipalities across the country (land, water and air) 2.3 Implement mechanisms to promote green production, initiatives and lifestyle 2.4 Continue to implement education and awareness programs on environmental protection and sustainable use of natural resources 2.5 Promote the implementation of ISO14001/2004 Environmental Management System in medium and large scale industries across the country 2.6 Promote the implementation of the 3R concept (reduce, reuse and recover) in the tourism service sector 2.7 Effective and strict implementation of EIA process as an important tools in planning and decision making, for approval of investment projects and activities 2.8 Engage investment projects and local based business to contribute to develop and improve the living standard and the local environmental quality

  12. Theme 3 Strengthening capacity of Lao PDR on Climate Change Adaptation and Mitigation and Disaster Risk Reduction Result 3: Lao PDR and its people is informed and prepared for adapting climate change, responding to the CC impacts (Natural Disaster) and contributing to global greenhouse gas emission reduction: 3.1 Mainstream climate change adaptation and mitigation and disaster management into relevant sector policies, program and action plans; 3.2 Implement research programs to study and disseminate the updates climate change scientific data and develop maps of vulnerable and high risk disaster areas to support in policy and strategy planning, national socio-economic development plans of line sectors at central and local levels and for people livelihood; 3.3 Implement public awareness raising programs on climate change and related impacts to ensure the effective use of local resources, appropriate governance arrangements and community participation in CC adaptation and disaster management and prevention; 3.4 Implement effective and efficient disaster protection and prevention measures and management system including preparedness, warning, protection, rescue, recover and rehabilitation systems, to ensure the protection and relocation of people and valuable assets in time.

  13. Theme 4 Maintaining and Enhancing MoNRE Coordination, Cooperation and Integration with Line Sectors and Regional and International Initiatives Result 4: Effective and efficient coordination and collaboration with line section and regional and international partners to ensure the implementation of MEAs mutual benefits of shared natural resources and minimal cumulative and trans- boundary impacts through 2 strategy statements: 4.1 Effectively and efficiently coordinate and cooperate with line sectors (at central and local levels) and regional and international organisations, to ensure implementation of MoNRE vision, strategy and action plan including MEAs related to natural resources and environment; 4.2 Effectively and efficiently report the progress of the implementation of MoNRE vision, strategy and action plan, including MEAs related to natural resources and environment, to ensure information and data sharing for better management of shared natural resources, to reduce cumulative and trans-boundary impacts.

  14. Theme 5 Building MONRE Institutional Capacity effectively, efficiently and sustainably Result 5: MONRE implements its mandate effectively, efficiently and sustainably through 3 strategy statements: 5.1 Improve and develop the necessary legislations, guidelines, mechanisms and procedures for sustainable implementation of the MoNRE mandate 5.2 Implement short and long term human resource development and management plans to ensure sufficient, efficient and competent technical staff to fulfil the MoNRE mandate. 5.3 To ensure that MoNRE has the funding sources and sufficient available budget with easy access and timely transfer of the budget to ensure fulfilment of the MoNRE mandate.

  15. With 46 milestones that 81 focused actions try to achieve under 7 Programmes and 55 priority projects

  16. Milestones Programme 1 1 Land Administration and Management 1. Completion of development and implementation of National Master Land Use Plan and Integrated Land Allocation in 18 provinces and 91 districts and 3,492 villages across the country with the participation of districts and villages; Completion of development and lunching of land legislation, such as land policy and land law, together with completion of development of comprehensive integrated land administration mechanism and system Issuing 500,000 land titles across the country; Completion of issuance of land census of 1.4 million plots across the country and development of land database system with registration of 900,000 plots in the database system; Strive for increasing revenue from technical services by 15 to 20% per year. 2. 3. 4. 5.

  17. Milestone Programme 2 Water Resources, Meteorology and Hydrology Management Completion of development and implementation of revision and approval of water law and decree on river basin committee Completion of development and implementation of approval of meteorology and hydrology law and relevant regulations; Completion of development and implementation of mechanisms and integrated water resources management plans (IWRMP) in the 10 priority river basins Completion of development and implementation of mechanisms and infrastructure basis for monitoring and assessment of the conditions of surface water and groundwater Completion of development and implementation of the scope for research on the hydrologic, physical, chemical and biological characteristics of water bodies and classification of water bodies, watersheds and aquifer recharge areas in the 7 priority river basins and other potential sub-basins; Completion of development and implementation of the database and database network system of water resources from central until local level across the country; Completion of development and implementation of pilot demonstration projects on a national integrated water park as a resource area for research, study tours, training, and knowledge exchange and, general public awareness rises; In cooperation with Water Resource Faculty, National University of Lao PDR, Completion of development and implementation of curriculums and the capacity building programs in the hydrology and meteorology sector for bachelor degree. Completion of National and 3 Regional Water Analysis Laboratories 1. 2. 3. 4. 5. 6. 7. 8. 9.

  18. Programme 3: : Forest Resources and Biodiversity Management 1. Completion of the design of, and obtaining approval for a new Forest Law and its decrees (conservation and protection forests) in order to modernize forest and biodiversity management Completion of forest survey, allocation and rehabilitation to achieve 70% of forest are of total area (2020) with 35,000 ha of forest plantation and 1.5 million ha of natural grown forest Completion of improvement of forest administration system to ensure sustainable and effective use and management of forest resources; Completion of development and improvement of registration of biodiversity species in Lao PDR and endanger biodiversity species. Completion of development and implementation of baseline study and development of mechanisms, regulations and guidelines for managing and reducing greenhouse gases from deforestation and forest degradation; Completion of development and implementation of two national biodiversity parks: Nam At- Phou Lauy and Nakhai-Nam Theun Protected Forests 2. 3. 4. 5. 6.

  19. Programme 4 Mineral Resources Management 1. Completion of development and implementation of integrated database management system to ensure coordination between line sectors as a basis for sustainable planning and management of mineral resources Development of 1:200,000 map of potential mineral resources areas for economic development in the northern part Development of 1:200,000 map of the mineral resources area of 75,045 km2 to achieve 50% of such area; Completion and lunching of decree on mineral conservation, together with completion of the survey and identification of mineral resources and planning for sustainable management, conservation and protection of 12 areas (27,950.82 km2) across the country reserved and protected for long term sustainable development; Completion of development, implementation and monitoring and evaluation of the implementation mechanism and regulations for management of mineral prospecting and exploration and feasibility studies to minimise the social and environmental impacts and ecological balance and maximize the optimal socio-economic benefits. Completion of improvement of mineral laboratory and museum 2. 3.

  20. Programme 5.1 Environmental Quality Promotion 1. Completion of development, approval and lunching of SEA decree and guideline and ISP decree and guideline Completion of development and implementation of national, provincial and district ISP and 50% of the ISP provinces have mainstreamed ISP into the socio-economic development planning; Completion of development and implementation of the concept frameworks, mechanisms and guideline for sustainable city development to ensure Green, Clean and Beautiful cities piloted in cities along road 13 located along Mekong River and at least 10 model project or activities and five green, clean and beautiful model schools per province; Completion of development and implementation of national policies and mechanism to promote the green initiatives in Lao PDR society including integrating regional and international green initiatives.; Completion of development and implementation of environmental education curriculum for all education levels in corporation with Ministry of Education Number of Lao people that have knowledge and are aware of environmental pollution and the possible health impact, proper environmental quality management and sustainable resource consumption have increased 2. 3. 4. 5. 6.

  21. Programme 5.2 Pollution Control and Management 1. Completion of the development and implementation of legislations, standards, guidelines and mechanisms for pollution control and management in municipalities across the country: -Reduce water and air pollution for industries and services by 10%; Protect water quality in 10 river basins to satisfy water quality standards to ensure minimum negative impact Agriculture and forestry sector has reduced the use of hazardous chemicals by 5%; Reduce the waste generation in the municipal areas across the country by 10% 20% of household in the municipalities in the six priority provinces and household along the national road 13 implement proper waste separation practise Main roads and public areas in municipalities and the important tourist areas have effective and efficient clean up waste collection system Completion of development and implementation of a centralized pollution database covering solid waste, hazardous material, soil pollution, air and noise emission and wastewater in the 6 targeted Cities located along Mekong rivers; 2. 3.

  22. Programme 5.3 Environmental Impact Assessment, Management and Monitoring of Investment Projects 1. Completion of development, improvement and implementation of legislations and technical guidelines and checklists related to EIA process as an important tools in planning and decision making, for approval of (concession agreements) investment projects and activities (hydropower projects, mineral prospecting and exploration projects, agricultural projects, industrial projects, and other infrastructure projects) Completion of the development and implementation of effective and efficient environmental management and monitoring systems of the implementation of environmental and mitigation measure of all investment projects and activities that receive Environmental Compliance Certificate approving the EIA report to ensure that the project owner fully and adequate comply with environmental and social obligations Completion of development and operation of advanced database for effective and efficient data and information management of environmental compliance certificates and compliance monitoring of the implementation of environmental and social obligations of all development projects across the country; 2. 3.

  23. Programme 5.4 Climate Change Adaptation and Disaster Risk Reduction 1. Completion of development and implementation of climate change and disaster laws, strategies and action plan on disaster reduction 2015 to 2020, NCCC 3, (NAPs) and INDCs report; Completion of establishment of disaster prevention and management committee and climate change committee at central and local levels; Completion of the development and implementation of efficient and effective guidelines and mechanisms for mainstreaming disaster protection, prevention and management and climate change adaption line sector policies, strategies, programs and plans at central and local levels piloting climate change adaptation project in agriculture and forestry sectors and disaster protection and prevention in public works sector; Completion of establishment of national disaster prevention and climate change fund as an important mechanism for climate change scientific research (study of potential impacts on environmental, social and economic aspects in different sectors) and identification and assessment of vulnerable areas to climate change and natural disaster risk Completion of development, implementation and monitoring of disaster protection and prevention measures and disaster management system (warning system, emergency response and assistance, rehabitation and recovery) in all disaster venerable and high risk areas to ensure the protection and relocation of people and valuable assets in time; Completion of conducting research programs to study and disseminate the updates climate change scientific data and develop maps of vulnerable and high risk disaster areas to support in policy and strategy planning, national socio-economic development plans of line sectors at central and local levels and for people livelihood; 2. 3. 4. 5. 6.

  24. Programme 6 Coordination, Cooperation and Integration with Line Sectors, Regional and International Initiatives 1. Completion of streamlining and mainstreaming MEAs and regional cooperation frameworks, including MRC and AEC and commitment related to natural resources and environment into national socio-economic development plans, MONRE action plans and line sector plans to ensure the implementation of committed obligations ; Development and implementation of effective and efficient mechanism for coordinating, monitoring, and reporting systems to ensure regular report on the implementation of MEAs, and regional and international cooperation frameworks. 2.

  25. Programme 7 Institutional Capacity Development 1. Completion of improvement, development and implementation of the necessary legislations, standards, guidelines, mechanisms and procedures for sustainable implementation of the MoNRE mandate Completion of improvement and implementation of the effective and efficient MONRE s institutional mechanisms and short and long term human resource development and management plans to ensure sufficient, efficient and competent technical staff to fulfil the MoNRE mandate ; Implementation of sustainable financial mechanism for ensuring sufficient and funding timely obtaining and transparent utilization of funds for MONRE activities; Completion of development and Implementation of centralized and integrated database system for efficient and effective NRE data and information management and sharing within MONRE and with line ministries, universities, Medias, private sectors, international organizations, donors and regional environmental authorities. 2. 3. 4.

  26. THANK YOU VERY MUCH

Related


More Related Content

giItT1WQy@!-/#giItT1WQy@!-/#giItT1WQy@!-/#giItT1WQy@!-/#giItT1WQy@!-/#giItT1WQy@!-/#giItT1WQy@!-/#giItT1WQy@!-/#giItT1WQy@!-/#