Utah Dam Safety Regulations for Public Protection

Slide Note
Embed
Share

The State Engineer in Utah holds the authority to regulate dams to safeguard public safety. This involves controlling dam construction, operation, design, maintenance, repair, and removal. Approval from the State Engineer is mandatory for any dam-related activities, and plans must be prepared by licensed and experienced engineers. Regular inspections and maintenance are required to ensure dam safety. Non-compliance could pose risks to human life and property, placing the responsibility on the dam owner for necessary actions.


Uploaded on Sep 29, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. Utah Dam Safety The State Engineer has the authority to regulate dams for the purpose of protecting public safety. To protect life and property, the State Engineer may make rules controlling the construction and operation of dams

  2. Administrative Rules Design Maintenance Repair Removal Abandonment

  3. Design & Construction No person may construct, enlarge, repair, alter, remove, or abandon any dam or reservoir without obtaining written approval from the state engineer.

  4. Submission of Plans Two processes for approval Small Dam Application Reservoir Volume is less than 20 ac-ft Does not constitute a threat to human life Formal submission of plans Design Report(s), Drawings, Specifications Allowed 90 days for review

  5. Qualifications Plans for the construction, enlargement, repair, alteration, or removal shall be prepared by a qualified engineer who is: Licensed in Utah Experienced in dam design and construction

  6. Construction Inspections The state engineer, his staff, or an independent consultant shall make periodic inspections of the work for the purpose of ascertaining compliance with the approved plans and specifications The engineer who is supervising the work is required to submit a report weekly to the state engineer.

  7. Inspection & Maintenance The state engineer shall inspect each dam that if it failed: Poses a threat to human life could cause significant property damage Following an inspection, the state engineer shall specify what maintenance is necessary

  8. Inspection Results Observe the condition of the dam Specify necessary maintenance, repair, or other needs to protect life & property The owner of the dam shall be responsible for that maintenance

  9. Instrument Monitoring Piezometers Drains

  10. Questions?

  11. Utah Stream Alterations A state agency, county, city, corporation, or person may not relocate any natural stream channel or alter the beds and banks of any natural stream without first obtaining the written approval of the state engineer

  12. Application Process An application to relocate any natural stream channel or alter the beds and banks of any natural stream shall be submitted to the state engineer Application may be downloaded from our website Fee based upon the applicant: Non-Commercial .$100 Governmental . $500 Commercial . .$2000 Processing time is approximately 30 days

  13. USACE Joint Application The U.S. Army Corps of Engineers issued Programmatic General Permit 10 (PGP-10) which allows an applicant to obtain both state approval and authorization under Section 404 of the Clean Water Act though a single application process

  14. Failure to Acquire a Permit The state engineer may issue an order for the repair and restoration of the bed and banks of a natural stream channel altered contrary to, or without, a permit issued for that purpose

  15. Emergency Action The state engineer may issue an emergency permit if an emergency situation arises which involves: Immediate or actual flooding or Threatens the health or well-being of a person Contact the state engineer as soon as possible Submit application within 2 days following the emergency The state engineer will inspect the alteration and may impose additional requirements

  16. Questions?

Related


More Related Content