SRF Cryomodule Assembly Working Group Technical Workshop

Slide Note
Embed
Share

Partnership between US/DOE, India/DAE, Italy/INFN, UK/UKRI-STFC, France/CEA, CNRS/IN2P3, Poland/WUST for the SRF cryomodule assembly working group. The workshop agenda includes topics like vacuum sealing, staffing, maintenance, production, alignment, instrumentation, and magnetic hygiene with esteemed speakers and registrants from various affiliations.


Uploaded on Sep 28, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. SRF cryomodule assembly Working Group A Partnership of: US/DOE India/DAE Italy/INFN UK/UKRI-STFC France/CEA, CNRS/IN2P3 Poland/WUST C. SIMON & S.BERRY (CEA) / C. GRIMM (FNAL) PIP-II Technical Workshop December 1stto 4th, 2020

  2. List of topics SRF Cryomodule Assembly Working Group Tuesday 01/12/20 Topic 1: Clean and leak tight beam vacuum Topic 2: High-skill staffing Topic 3: Pressure code and welds certification Topic 4: Alignment process Topic 5: Instrumentation of the cryomodule Wednesday 02/12/20 Topic 6: Maintenance and transportation preparation Topic 7: Production of the cryomodule Topic 8: Magnetic hygiene 12/1-4/2020 S. BERRY| PIP-II Technical Workshop 2

  3. Registrants / Speakers Name Affiliation Adrien Bouygues CEA SACLAY C. Grimm Catherine MADEC CEA Chair Charles Grimm FNAL K. Middleman Organizing Committee Claire Simon CEA Saclay T. Trublet Fabien EOZENOU CEA Saclay Irfu/DACM Genfa Wu FNAL/TD R. Cubizolles KUMUD SINGH BHABHA ATOMIC RESEARCH CENTRE D. Passarelli Kumud Singh Bhabha Atomic Research Centre Nicolas BAZIN CEA V. Roger peter mcintosh STFC Daresbury Laboratory J. Holzbauer Robin Cubizolles CEA sebastien ladegaillerie CEA O. Napoly SHRIKANT Pattalwar STFC Daresbury Laboratory Chair St phane BERRY CEA/Irfu N. Bazin Thierry TRUBLET CEA more if Secondary Working Group Choice taken into account thomas plaisant CEA Vincent Roger FNAL/TD 12/1-4/2020 S. BERRY| PIP-II Technical Workshop 3 Yi Xie FNAL/TD

  4. Agenda (1) Tuesday 01/12/20 Chicago Time Duration Title Cryomodule Production Presenter Institute 9:10 AM 0:05 Welcome - Introduction Sealing surfaces and bellows protection (over all the life cycle of the part) Discussion RGA - Vacuum requirements - Permitted materials Discussion High-skill staffing training (cleanroom, assembly, chemical technicians) Discussion Break Cryomodule Production Berry/Grimm 9:15 AM 0:10 C. Grimm C. Grimm K. Middleman S. Berry FNAL 9:25 AM 9:35 AM 9:45 AM 0:10 0:10 0:10 STFC CEA 9:55 AM 0:10 T. Trublet 10:05 AM 10:15 AM 0:10 0:10 S. Berry 10:25 AM 10:40 AM 0:15 0:15 Weld certification Discussion R. Cubizolles C. Grimm CEA 10:55 AM 0:15 Geodesic strategy - fiducials, alignment - Alignment Process FNAL D. Passarelli S. Berry 11:10 AM 0:15 Discussion Instrumentation interfaces, interfacing of sub-systems to accelerator Discussion 11:25 AM 0:15 V. Roger S. Berry FNAL 11:40 AM 11:55 AM 0:15 0:00 12/1-4/2020 S. BERRY| PIP-II Technical Workshop 4

  5. Agenda (2) Wednesday 02/12/20 Time Duration Title Presenter Institute Cryomodule Production 7:30 AM 0:05 Welcome - Introduction The care, maintenance (issue of access to the CM for maintenance / repairs) and final preparation of the CM prior to shipping Discussion Production / industrialization : how to organize the production line? Moving parts or moving team? Standardization: Tooling Discussion Berry/Grimm 7:35 AM 0:20 J.Holzbauer S. Berry FNAL 7:55 AM 0:20 8:15 AM 0:20 O. Napoly CEA 8:35 AM 0:20 C. Grimm 8:55 AM 0:10 Magnetic Hygiene - Permitted materials CEA N. Bazin C. Grimm Berry/Grimm 9:05 AM 9:15 AM 9:30 AM 0:10 0:15 0:15 Discussion Discussion/Close Out/Report Summary Break CEA/FNAL 12/1-4/2020 S. BERRY| PIP-II Technical Workshop 5

Related


More Related Content