Public Design Meeting for State Route 115 Corridor Improvement Project
Presentation of preliminary design plans to improve safety and operations along State Route 115 (US 129/Alcoa Highway) from Woodson Drive to Cherokee Trail Interchange in Knox County. Open house format with project information, feedback collection, and project team details provided. Attendees encouraged to submit written or verbal comments for project development. Contact details of project leaders included for further inquiries.
Download Presentation
Please find below an Image/Link to download the presentation.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
E N D
Presentation Transcript
Public Design Meeting State Route 115 (US 129/Alcoa Highway) From Woodson Drive to Cherokee Trail Interchange Knox County County December 6, 2016
MEETING PURPOSE/FORMAT/PROJECT GOAL Presentation to provide up-to-date proposed project information Open House Format: Staff located at displays to answer questions Complete comment cards and/or provide verbal comments to court reporter Preliminary Design Plans for: State Route 115 (US 129/Alcoa Highway) From Woodson Drive to Cherokee Trail Interchange Project Goal: Improve safety and operations along State Route 115 (US 129/Alcoa Highway)
PROJECT TEAM TDOT Region 1 Project Development and
State Route 115 (US 129/Alcoa Highway) Corridor Improvement Projects
Woodson Drive to Cherokee Trail Cross-Section 12 ft. travel lanes, 3 in each direction 12 ft. shoulders Center Median Barrier Wall
PROJECT DEVELOPMENT PROCESS Planning Environmental Project is currently in the Design Phase Design Right-of-Way Construction
COMMENTS Your comments are important to us! Submit Written Comments on the Provided Comment Sheets Mail Comment Sheets within 21 days, Tuesday, December 27th, 2016 Provide Verbal Comments to the Court Reporter
Thank You Thank You For your attendance and participation in the State Route 115 (US 129/Alcoa Highway) From Woodson Drive to Cherokee Trail Interchange Daniel Oliver, P.E., R.L.S. | Director TDOT Region 1, Project Development Admin Bldg., 1st Floor 7345 Region Lane Knoxville, TN 37914 p. 865-594-2400 daniel.oliver@tn.gov Eric Wilson, P.E. | Civil Engineering Manager 1 TDOT Region 1, Project Development Admin Bldg., 2nd Floor 7345 Region Lane Knoxville, TN 37914 p. 865-594-0742 eric.wilson@tn.gov