Presentation on Mineral Resources by Adv. Thabo Mokoena - PPC

Slide Note
Embed
Share

Explore the detailed presentation to PPC on mineral resources by Director General Adv. Thabo Mokoena. Covering topics like Tegeta Mines profile, equipment audits, personal protective gear, blasting equipment, accidents, and more. Discover insights into developments at Shiva Uranium, Optimum, and Lily Mine, along with experiences with business rescue practitioners. Concluding with valuable observations and recommendations for the industry.


Uploaded on Aug 09, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. Presentation To PPC - Mineral Resources Adv Thabo Mokoena Director General 30 May 2018

  2. PRESENTATION OUTLINE 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. Tegeta Mines Profile Audit of Equipment Personal Protective Equipment Blasting Equipment Accidents Enforcement Instructions (Sec 54 and 55) SLPs Audit Developments at Shiva Uranium, Optimum and Lily Mine Experience with Business Rescue Practitioners Conclusion

  3. 1. Tegeta Mines Profile Mines Commodity Type Mpumalanga Brakfontein Coal Opencast Koornfontein Coal Underground Optimum Coal Open cast and underground North West Klerksdorp Shiva Uranium Uranium Underground and Plant

  4. 2. Infrastructure and Operational Equipment Non Compliance Remedial Action Infrastructure The steelwork was dismantled and replaced. Section 54 instruction was issued Deficiencies were rectified and section 55 instruction was issued 1. Mine applied for exemption to regulation and was not granted due to significant risk. Section 54 and 55 instructions 2. TMM were repaired Steelwork at the Gold plant was extremely corroded Lamproom non compliant with COP & OEM requirement 1. Not equipped with Proximity Detection System 2. TMMs were working order (not maintained, braking system not effective, lack of air-conditioners. TMMs (PDS) good not in were issued

  5. 2. Infrastructure and Operational Equipment Non Compliance Two tower cranes at the plant were in poor condition because they were not maintained and load testing was not done. Remedial Action Tower cranes were maintained and load tested. Section 54 instruction was issued. Lifting Equipment Pressure Vessels Section 54 instruction issued 1. Poor state of repair because no routine examination on maintenance done testing and no pressure and

  6. 3. Personal Protective Equipment (PPE) Adequate Inadequate Non-compliance and Remedial Action Inadequate stock and supply problem due mine not be able to pay suppliers (sizes of overall and 2 piece overalls for women, welding work ) Employees not issued with PPE for winter season. Section 55 instruction was issued to order compliance. Inadequate

  7. 4. Blasting Equipment Condition Non-compliance and Remedial Action No explosives delivered since 08 February 2018 Adequate Adequate No blasting operations Not applicable and only processing stockpiles No blasting and use continuous miners (CM)

  8. 4. Safety Performance Injuries for 2017 to 2018 Mine Injuries Description Brakfontein 1 Slipped and fell while climding off ladder Koornfontein 4 Machinery accidents Optimum Opencast General types of accidents: slip & fall, material handling, tools 16 Optimum Underground Shiva General types of accidents: slip & fall, material handling, tools General type of accidents: slip & fall, welding, falling-in, struck by 14 5 Total 40

  9. 5. Enforcement Instructions Instruction Section 54 Number Findings 22 Employees exiting the main gate not wearing safety belts; Corroded steel structures at the gold plant; tower craned not load tested; unlicensed tower crane operators Employees not trained on all mandatory COP; inadequate illumination of working place Section 55 19

  10. Mineral Regulation Section

  11. Situation in Shiva Uranium Shiva Uranium/ Oakbay Resources has 3 mining rights adjacent to each other and its Social and Labour Plans has been integrated into one. Employees have not been paid salaries on time and as such they have been on strike Contractors have not been paid and this affects the payment of contract workers The company has been placed under business rescue proceedings and the region received notification on the 01stof March 2018 The company / BRP still have to respond to s93 order and s 31L of NEMA order issued The company failed to adhere to material terms and conditions of the approved SLP The company failed to honour the rehabilitation plan commitment The employees have issues with the ESSOPs trust inherited from Glencore The rehabilitation funds are with the bank of Baroda According the department records we do not have records of any s11 application received from the company to another entity

  12. SOCIAL AND LABOUR PLAN COMPLIANCE:SHIVA URANIUM The SLP commitment was made on the 26thof October in 2010 when the SLP was approved. Second generation SLP was submitted in 2016 and was approved The inspection was conducted on the 9thof June 2017 but there was no non-compliance issues were identified and a directive was issued. Another inspection was conducted on the 26thof January 2018 and non-compliance was identified and a s93 order issued, the company is still under 60 days period given to respond to the directive. SLP 2 has been submitted ,assessment and approval is pending. An audit / inspection whereby more non-compliance was identified was conducted 02 March 2018 and a section 93 notice was issued 08 March 2018 The company/BRP submitted a Section 93 action plan submitted 14 April 2018 The is in the process of engaging the company on the action plan submitted.

  13. FINANCIAL PROVISION FOR REHABILITATION:SHIVA URANIUM The financial provision in place is with the Bank of Baroda and the department received a notification from the bank on the 08thof February 2018 informing the department of its intention to leave the country and Nedbank s notification to withdraw the guarantees; Upon receipt of this notifications, the department responded by giving the banks alternatives methods of securing the guarantees which is by cash deposit into the department bank account. The letters to the banks were sent on the 15thof February 2018 and the department still awaits compliance from the bank. The rehabilitation guarantees are however subject of a freezing order granted in favour of OUTA on the 16thof September 2017.

  14. FINANCIAL PROVISION FOR REHABILITATION:SHIVA URANIUM The Financial Provision shortfall amount is still the same amount, R38 594 383.57. A compliance notice was sent to the company dated the 11th April 2018 to instruct the company to provide the shortfall amount. A feedback letter was received from the company on the 09th May 2018 indicating that the company is not in a position to provide such amount based on their current financial status (see feedback letter) Further engagements will still be done with the company/ BRP

  15. Background Tegeta Explorations holds various rights in Mpumalanga Optimum Coal Mine, Brakfontein Mine, Koornfontein Mine and Idwala Crypts. The mines are under business rescue Optimum and Koornfontein were acquired from Glencore in 2016 On the 07/03/2018 PPC directed the department to conduct social and labour plan audits SLP inspections were conducted from the 12-15 March 2018 at Optimum, Koornfontein and Brakfontein Mines 1. Examples of generic causes of job losses 15

  16. Elements of the Social and Labour Plan Human Resource Development The purpose being to address skills development within the mining industry The right holder must commit 5% of the annual payroll towards skills development Employment Equity The purpose thereof is to address the imbalances of the past at the workplace The charter has set the targets of 40% at all management levels. 16

  17. Housing and Living Conditions The purpose thereof is to address the living in conditions of mineworkers through conversion of hostels into single unit and facilitation of homeownership Mine Community Development The purpose of MCD is to ensure that the mining right holders contribute towards socio-economic development of the communities and labor sending areas 17

  18. Procurement Procurement presents opportunities to expand economic growth. The mining charter set out the targets as follows: services 70%, consumables 50% and capital goods 40% Management of Downscaling and Retrenchments The purpose to ensure holders of mining rights provide for mechanisms to save jobs and/or mechanisms to ameliorate the impact of job losses. 18

  19. Financial Provision Mining right holders must make financial provision for SLP 19

  20. Inspection at Optimum mine Social and Labour Plan inspection was conducted on 12/03/2018 at the mine Optimum Coal Mine had SLP approved for the period 2013-2017 Present were Mine Management, National Union of Mineworker, Steve Tshwete Municipality and the supplier of the mine. 20

  21. Human Resource Development Total workforce at the mine is 2488 of 550 are permanent and 1933 are contract workers. The company has not provided for AET despite the target of 114 Company s employees and were never trained since the company took over from Glencore Learnerships (18.1 internal and 18.2 external) were also not implemented There is a backlog of 399 on core business training. 21

  22. - A training budget of R11 million was approved for 2017/18, but same was diverted at the instance of Chief Executive Officer - Workers operating machines with authorization due to lack of training - Career progression, and mentorships and portable skills training were not implemented. - The company could not report on the provision of bursaries - No explanation was provided for reduction of HRD budget from R64 032 000.00 to R1 257 000.00 22

  23. Employment Equity Employment equity targets have been met. However, there is no women representation at Senior Management level. Mine Community Development The community Health Care Centre in KwaZamokuhle inspected on the 15/03/2018 The Health Care Centre is 99.9% complete when Tegeta took over from Glencore. The service provider was not paid hence the facility cannot be handed over to the Community/Department of Health. 23

  24. There is a court order directing BRP to pay service provider. The invoice remain unpaid and Tegeta in contempt. Tegeta has not continued with the implementation of the project. The Community Health Care Centre was constructed on the community sport field. Tegeta has not honored the commitment as no alternative land identified. During the site visit, the department also visited the temporary clinic. The facility is not cot conducive and too small Those with communicable diseases (TB) infect other as they wait for health services 24

  25. Department is currently engaging other stakeholders (Glencore, Provincial Government, Service provider and BRP to resolve the matter) Housing and Living Conditions The company has failed to facilitate home ownership for the employees The company could not account for the employee s current dwellings Instead, the company provide transport for workers to and from work and living out allowance 25

  26. Management of Downscaling Future forum has been established but not functional The future of the mine and its profitability are not discussed at the meetings Organised labour were not informed about the Business, Rescue and possible sale of the mine. ESOP and Community Shareholding is not discussed at FF meetings. 26

  27. Procurement This aspect was not inspected due to insufficient information from the mine Suppliers were concerned that they provide service to the compny remained unpaid Company continue to rail coal and money not coming back to the company A follow-up inspection was scheduled for the 30 May 2018 27

  28. Summary of the findings by the Department The company s SLP expired in 2017 and the Department has not received revised SLP for 2018-2022 Tegeta has not implemented only of the elements of SLP inspected since it took over from Glencore. 28

  29. Inspection at Koornfontein Mine Social and Labour Plan inspection was conducted on the 13/03/2018 at the Mine The approved SLP expired in October 2016 Present at the inspection was the Mine Management National Union of Mineworkers, representative of Steve Tshwete Municipality and the suppliers of the Mine 29

  30. Human Resource Development Total workforce at the mine is 763 The company has not implemented AET, Learnerships (18.1 and 18.2) and care business training. No career progression and mentorships were implemented Bursaries and internships were not offered Contract workers were not provided for training 30

  31. Employment Equity The company has met the EE targets. However, the Senior Management is still male and white dominated No female representation The Department has still not received EEA report from the company The company has failed to implement mine community development projects Phase 3 of the renovation of Blinkpan school was not implemented 31

  32. Housing and Living Conditions The company has not promoted home ownership at the mine There is no improvement of living conditions of mineworkers. Procurement The information provided could not be used to determine level of compliance Follow-up inspection was scheduled for 31 May 2018 for this element and ownership 32

  33. Management and Downscaling Future forum established but not functional Paste the 1 from Optimum Summary of the findings The company is operating without approved SLP HRD targets reduced to zero (0) Section 102 application not approved by the department 33

  34. Inspection at Brakfontein Colliery The total workforce at the mine is 341 (163 Permanent and 178 contract) Inspection took place on 14 March 2018 at the mine and 15 March 2018 at the DMR office in Witbank. The SLP was approved for the period 2015-2019 Only Management were in attendance on both days Meeting postponed as the company was not prepared 34

  35. Human Resource development The company has failed to implement HRD commitments Employment equity The company is not transformed No female incumbents at senior management level Mine community development The company has not implemented LED project (eradication of bucket system in Delmas) This led to Victor Khanye Local municipality implementing the project The company remains non-compliant 35

  36. Procurement This aspect could not be inspected due to insufficient information provide Follow up inspections is scheduled for the 1st June2018 Housing and living conditions The company has failed to promote home ownership No information on the employees dwelling status The company offers employee R300.00 per month as a living out allowance 36

  37. Management of downscaling The company does not have a functional future forum During the inspection organised labour was not part of the meeting Summary of the Findings There is total disregard of Social and Labour Plan by the company 37

  38. Idwala Crypts The inspection was not conducted as the company is now under care and maintenance. 38

  39. Lily Mine Progress Report Families paid R200 000 each Workers paid R10000 each (Balance R40 000 to paid by new owner) The Inquiry report has been completed Business rescue practioner secured funding from SCC Group and IDC Section 11 application and regulatory approvals Mine to commence operation in November 2018 Mine to develop a new decline of about 300metres and new ventilation shaft Jobs will be saved at Lily and Barbrook mines (at least 600 jobs) Recovery of three missing mine workers to be done concurrently with mining operation

  40. Business Rescue Process The Business Rescue Process takes long to secure funding (Lily mine 2 years) Some mines have been under Business Rescue for more than 2 years

  41. Thank You Siyabulela Nakhensa Ngiyabonga!

More Related Content