Optimization Strategies for Nuclear Plant Cost Reduction
Strategies for cost-saving in nuclear plants include reducing capital costs, optimizing maintenance programs, improving procurement efficiency, solving obsolescence issues, and streamlining processes for increased operational efficiency.
Download Presentation
Please find below an Image/Link to download the presentation.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
E N D
Presentation Transcript
10CFR50.69 Implementation 10CFR50.69 Implementation Carrie Gilbreath Southern Nuclear 1 1
CATEGORIZATION PROCESS CATEGORIZATION PROCESS 2
10 CFR 50.69 IMPACTS 10 CFR 50.69 IMPACTS 3
Where do savings come from? Where do savings come from? Reduce capital costs Examples: Vogtle MSIV Actuators, Hatch Plant Service Water Piping Projects Remove components from special treatment programs and extend or eliminate PMs Example: Equipment Qualification Program, In- Service Testing Right Work at the Right Time! Programs Procurement - Daily and Outage Reduce parts cost by 80% Solve obsolesce issues Cut lead time in half or more 4
Vogtle Categorized Systems Vogtle Categorized Systems System System RISC RISC- -1 1 247 RISC RISC- -2 2 16 RISC RISC- -3 3 2541 2541 RISC RISC- -4 4 644 Total Total 3448 Nuclear Service Cooling Water Nuclear Service Cooling Water Component Cooling Water Component Cooling Water 84 12 539 539 422 1057 Containment Spray Containment Spray Chemical & Volume Control Chemical & Volume Control System System Essential Chilled Water System Essential Chilled Water System (Mechanical) (Mechanical) Nuclear Instrumentation System Nuclear Instrumentation System (Electrical / I&C) (Electrical / I&C) 97 822 0 91 202 202 1739 1739 80 1197 379 3849 4 0 1344 1344 242 1590 20 0 16 16 68 104 Radiation Monitor System Radiation Monitor System (Electrical/I&C) (Electrical/I&C) 0 0 364 364 755 1119 Post Post- -Accident Monitoring System Accident Monitoring System (Electrical / I&C) (Electrical / I&C) Main Steam Main Steam Emergency Diesel Generators Emergency Diesel Generators Nuclear Sampling Nuclear Sampling Liquid 22 2 0 0 0 24 232 297 0 8 8 0 3205 3205 2224 2224 111 111 0 3445 3937 1761 1408 1650 Liquid 5
Farley and Hatch Categorized Systems Farley and Hatch Categorized Systems System System RISC RISC- -1 1 RISC RISC- -2 2 RISC RISC- -3 3 RISC RISC- -4 4 Total Total Farley Containment Spray Farley Containment Spray 123 0 217 217 114 454 Farley Radiation Monitors Farley Radiation Monitors 0 0 73 73 854 927 Farley Penetration Room Filtration Farley Penetration Room Filtration 0 0 338 338 40 378 676 0 2158 2158 301 3135 Farley Emergency Diesel Generator Farley Emergency Diesel Generator 0 0 180 180 1412 1592 Farley Main Feedwater Farley Main Feedwater 326 118 714 714 1355 2513 Farley Main Steam Farley Main Steam Hatch Plant Service Water Hatch Plant Service Water 195 18 2830 2830 1904 4947 Hatch Emergency Diesel Generator Hatch Emergency Diesel Generator 155 11 1095 1095 210 1471 6
Implementation Approach at SNC and Goal Implementation Approach at SNC and Goal O&M funded, level of effort, with contract support Categorize 2-3 Systems categorized per station per year, as funding is available Goal will be 30 at each station 17 for Vogtle 25 for Farley 29 for Hatch Proactive use of 50.69 in Design process MSIV Project Example Maximize Preventative Maintenance Benefits Seamless proactive RISC3 procurement in Outage and Daily activities 7
Programs Alternative Treatment Examples Programs Alternative Treatment Examples 8
50.69 Alternative Treatments 50.69 Alternative Treatments Programs Programs Programmatic Progress and Savings Plant Plant # of Systems Approved Vogtle Vogtle 1&2 1&2 # of Components Removed EQ: 426 IST: 332 Appendix J: 20 MOV: 26 ISI Pres. Test: 5719 ISI Supports: 2900 Snubbers: 336 EQ: 124 IST: 8 EQ: 16 IST: 24 Approximate PM Savings (Life of Plant) $20,415,751 13 Farley Farley $861,778 6 Hatch Hatch $109,423 2 9
50.69 Alternative Treatments 50.69 Alternative Treatments Procurement Procurement Procurement Savings Plant Plant # of Systems Approved Approximate Procurement Savings for Installed Parts Approximate Procurement Savings Opportunity (Life of Plant) $6,258,360 Vogtle 1&2 Vogtle 1&2 13 $2,483,980 Farley Farley 6 $240,978 $4,182,280 Hatch Hatch 2 $149,046 $2,000,000 10
Implementation Tips and Lessons Learned Implementation Tips and Lessons Learned Think 50.69 early and often, especially in Design space. Salvaging Opportunities vs. Maximizing Benefits Include all affected departments in change management for 50.69 Team Sport Align PRA model updates with 50.69 Periodic Review Make it easy!! Use what is in place Do not add more process than what is needed Ensure easy reinstatement of special treatments if needed 11
50.69 Industry Groups and Events 50.69 Industry Groups and Events NEI 50.69 Implementation Task Force Collaboration requested with DOWG on 50.69 in SDP NEI 50.69 Licensing Task Force BWROG 50.69 Subcommittee PWROG Risk Management Committee Key Dates: EPRI 50.69 Workshop in Charlotte, NC - September 13-14. 2023 PWROG/BWROG 50.69 Summit in Scottsdale, AZ December 3-4, 2023 12
Questions? Questions? Descope me! Descope me! Descope me! 13