Implementation Workflow and Targets in the EU Strategy for the Danube Region

6 Novem
ber 2012 |
Budapest
,
Hungary
 
WORKFLOW FOR IMPLEMENTATION in PA4
(From actions to road-maps)
 
László Perger Co
-co
ordinator of PA4
 
OUTLINE
 
 
The implementation workflow
Targets
Actions
Road-maps
Projects
What are benefits of the EUSDR
 
 
 
 
 
 
EU S
TRATEGY FOR THE 
D
ANUBE
 R
EGION
 (EUSDR)  |  www.danube-region.eu
 
 
EU S
TRATEGY FOR THE 
D
ANUBE
 R
EGION
 (EUSDR)  |  www.danube-region.eu
 
T
A
R
G
E
T
S
 
A
C
T
I
O
N
S
 
R
O
A
D
M
A
P
S
 
P
R
O
J
E
C
T
S
 
I
M
P
L
E
M
E
N
T
A
T
I
O
N
 
P
Y
R
A
M
I
D
 
 
O
F
 
T
H
E
 
E
U
S
D
R
 
F
eedback
 
Annual Reports
 
TARGETS (
with Actions
 concerned
)
 
I.
Reduce the nutrient levels in the Danube River to allow the recovery of the
Black Sea ecosystems to conditions similar to 1960s 
by 2020
1.
Action: “To foster and develop an active process of dialogue and
cooperation between authorities responsible for agriculture and
environment to ensure that measures are taken to address agricultural
pollution”
2.
Action: “To legislate at the appropriate level to limit the presence of
phosphates in detergents”
3.
Action: “To establish buffer strips along the rivers to retain nutrients and to
promote alternative collection and treatment of waste in small rural
settlements”
4.
Action: “To continue boosting major investments in building and upgrading
urban wastewater treatment facilities across the Danube Basin, including
measures to build capacity at the regional and local level for the design of
such infrastructure”
 
EU S
TRATEGY FOR THE 
D
ANUBE
 R
EGION
 (EUSDR)  |  www.danube-region.eu
 
TARGETS (
with
 
 Actions
 concerned
)
 
II.
Achieve the management objectives set out in the Danube River Basin
Management Plan
 
5.
 
Action: “To implement fully the Danube River Basin Management Plan”
6.
 
Action: “To treat hazardous substances and contaminated sludge with the newest and best
available technology and to develop and promote remediation measures for hazardous
producing or abandoned industrial sites and waste deposits”
7.
  
Action: “To promote measures to limit water abstraction”
8.
  
Action: “To assure the proper control and progressive substitution of substances that are
 
considered problematic for Danube Region”
9.
  
Action: “To continue to invest in and support the information collection systems already
 
developed by ICPDR"
10.
  
Action: “To strengthen general awareness and facilitate exchange of good practice in
 
integrated water management issues in the Danube Basin among decision-makers at all
 
levels and among the population of the Region
11.
  
Action: “To promote measures aimed at reducing knowledge deficits, developing and
 
transferring tools, methods and guidelines concerning the safeguarding of drinking water
 
supply”
 
EU S
TRATEGY FOR THE 
D
ANUBE
 R
EGION
 (EUSDR)  |  www.danube-region.eu
 
TARGETS (
with 
 
Actions
 concerned
)
 
III.
 
Elaborate a Danube Delta Analysis Report by 2013 as a step towards
completion of the Delta management Plan, which shall be adopted by 2015
 
12.
  
Action: “To further strengthen Integrated Coastal Zone Management (ICZM) and Maritime
 
Spatial Planning (MSP) practices on the Western shores of the Black Sea
 
IV.
 
Secure viable populations of Danube sturgeon species
 
13.
  
Action: “To reduce existing water continuity interruption for fish migration in the Danube
 
river basin”
V.
 
Elaborate, adopt and implement the sub-basin management plans, such as
Sava, Tisza and Prut sub-basins
 
14.
  
Action: “To greatly strengthen cooperation at sub-basin level”
 
EU S
TRATEGY FOR THE 
D
ANUBE
 R
EGION
 (EUSDR)  |  www.danube-region.eu
 
ACTION GROUPES (
cloustering of…)
 
1.
Actions 
for implementation of EU Directives & Strategies 
(in case
of Water Quality: Action 1 & 14)
2.
Actions 
for stronger EU by strengthening of cooperation
between 
sub-
regions, sub-basins, region countries and
neighbourhood  countries 
(in case of Water Quality: Action 2 &
6)
3.
Actions 
for region development, innovation and competitiveness
(in case of Water Quality: Action 3, 4, 5, 8 & 10)
4.
Actions 
for sustainability by improvement 
and endorsement 
of
rules and regulations 
(in case of Water Quality: Action 7, 9 & 11)
5.
Actions 
for region-wide knowledge transferring 
(in case of Water
Quality: Action 12 & 13)
 
 
 
 
 
 
EU S
TRATEGY FOR THE 
D
ANUBE
 R
EGION
 (EUSDR)  |  www.danube-region.eu
 
ROAD-MAPS 
(
principles)
 
AIM 
(of road-maps making)
Presenting work-flows for implementation of Actions per PAs by transparent
way and with responsibility for managing and controlling of action concerned
STUCTURE (of road-maps)
Milestones (main steps for implementation with very definite titles)
Works ( detailed but concisely drafted content  of tasks)
Outputs (documents, upgraded technologies, monitoring, investments, etc.)
Responsible  (most relevant groups, institutions, project leaders, etc.)
Deadline  (expected dates to fulfill tasks nominated in works and/or outputs)
Funding (sources, institutions if known or any)
MANDATE
Presented and discussed on SG meetings with members
Approved by SG members with possibility of upgrading
 
 
EU S
TRATEGY FOR THE 
D
ANUBE
 R
EGION
 (EUSDR)  |  www.danube-region.eu
 
ROAD-MAPS
 (briefly summarized by Actions groups)
 
1.
Actions 
for implementation of EU Directives & Strategies 
(in case
of Water Quality: Action 1 & 14)
Milestones
: management planning according to WFD and Coastal Zone
Management & Marine Strategy Framework Directive
Works: 
Developments and updating tasks, planning
Outputs:
 Analysis and interim reports, management plans
Responsible:
 interested countries  with coordination of ICPDR
Project
 example
: 
ICZM project
Deadline:
 201
2
-2015
Funding:
 EU
 
 
 
 
 
EU S
TRATEGY FOR THE 
D
ANUBE
 R
EGION
 (EUSDR)  |  www.danube-region.eu
 
ROAD-MAPS
 (briefly summarized by Actions groups)
 
2.
 
Actions 
for stronger EU by strengthening of cooperation between sub-
regions, sub-basins, region countries and neighbourhood  countries 
(in
case of Water Quality: Action 2 & 6)
Milestones
:
 
Strengthening of cooperation in sub-basins between countries by
development of management plans and between authorities (agricult. & enviro.)
Works:
 Developments and updating tasks, management planning, Action Plan making for
dialog between authorities
Outputs:
 management plans (2nd ITRBMP, Danube Delta,
 
Prut,
 
Sava RBA,2nd Sava
RBMP), Action Plan
Responsible: 
interested countries  with help of ICPDR, ICPDR Tisza Group, Sava Com.
Project
 examples
: 
Case studies on Tisza sub-basin, Pro Tisza, Early warning water
quality monitoring…, Danube Delta Sub-basin Analysis Report, Danube Delta Management
Plan, Prut Management Plan
Deadline:
2012-2020
Funding:
 EU
 
EU S
TRATEGY FOR THE 
D
ANUBE
 R
EGION
 (EUSDR)  |  www.danube-region.eu
 
ROAD-MAPS
 (briefly summarized by Actions groups)
 
3.
 
Actions 
for region development, innovation and competitiveness 
(in case of Water
Quality: Action 3, 4, 5, 8 & 10)
Milestones
: 
Improvement of databases and GIS information systems, JTS3 and JTS1, implementation  of
UWWT and upgrading  by technology development,  
decreasing 
of nutrient contamination by creating buffer
zones and by WWT in less than 2000 PE settlements, treating hazardous substances and contaminated sludge by
implementation of projects and knowledge transferring, reducing existing water continuity interruption in the
Danube River Basin considering sediment management and regime restoration as well
Works:
 as in Milestones
Outputs:
 
Inventories
, surveys, feasibility and preparatory studies, investments,
projects, programmes,
Responsible:
 
interested countries  with help of ICPDR, ICPDR, ICPDR Tisza Group, Sava Com., national
institutions, regional associations
Project
 examples
: 
Development of databases on inventories related to ARS, CS and MS, Further
development of TNMN database, Development of database on inventories on HS, Monitoring survey on the
Danube, Preparation of the JDS3 Report, Monitoring survey on the Tisza, 
Preparation of the JTS1 Report,
Survey and assessment  of hydro-ecology of the Tisza river, Membrane technology for specific
contamination, Blue Danube, Programme for eco-friendly and site specific waste water treatment in
case less then 2000 PE settlements, Survey on buffer zones, Feasibility study for restoring continuity at
the Iron Gate dams, Danube Sediment management, Environmental status of Sediment, Water and
Biota in the Sava River basin,
Deadline
:
2012-2020
Funding:
 EU
 
EU S
TRATEGY FOR THE 
D
ANUBE
 R
EGION
 (EUSDR)  |  www.danube-region.eu
 
ROAD-MAPS
 (briefly summarized by Actions groups)
 
4.
 
Actions 
for sustainability by improvement and endorsement of rules and
regulations 
(in case of Water Quality: Action 7, 9 & 11)
Milestones
: Implementation of Regulation (EU) 259/2012 for detergents decreasing,
testing of the EU Guidance document on EQS Directive, inventory on priority substances
for preparation of national regulations, collection of good water demand and resources
management practices in limitation of water abstraction  considering Water Scarcity and
Droughts
Works: 
Survey on the P-free detergent ban in the Danube countries, implementation of
pilot projects dealing with management of water shortages due to climate change effect
Outputs:
 
Projects, scenarios, analytical reports, inventories, dialogues between
detergent industries  and relevant stakeholders, methodologies for setting new regulation
Responsible:
 interested countries with coordination of ICPDR
Project
 examples
: 
Emission reduction of priority substances in the Danube Basin, CC-
WARE Mitigating vulnerability of Water Resources
Deadline:
 2012-2015
Funding:
 EU
 
EU S
TRATEGY FOR THE 
D
ANUBE
 R
EGION
 (EUSDR)  |  www.danube-region.eu
 
ROAD-MAPS
 (
briefly
 
summarized by Actions group
s
)
 
5.
 
Actions 
for region-wide knowledge transferring 
(in case of Water Quality:
Action 12 & 13)
Milestones
:
 
Danube Days, Danube Watch and other mainly ICPDR relevant information
sources to familiarize people with works doing for the Danube River  Basin, information
exchange on the progress, achievements and events, identify authorities, enterprises,
associations responsible for drinking water supply to develop joint actions to protect the
most valuable resources
Works: 
Coordination of national efforts, promoting of user-friendly solutions, identifying
actors,
 
development of joint actions and implementation
Outputs:
 
Information items, websites, water prize awards, database, guidance
documents for drinking water protection, pilot and safeguarding projects
Responsible:
 ICPDR, interested countries with help of ICPDR, authorities, water works
Projects
 examples
: 
Potential projects on transboundary aquifer/river using for drinking
water with common management and safeguarding zones
Deadline:
 2012-2015
Funding:
 EU
 
EU S
TRATEGY FOR THE 
D
ANUBE
 R
EGION
 (EUSDR)  |  www.danube-region.eu
 
PROJECTS
Key expectation
 
-
 
be of macro-regional importance
 
What kind of projects are of macro-regional importance?
 
-
 
as a many of country as possible to be involved from the region to
 
implementation  region-wide already accepted targets, e.g.:
 
  
- CCWARE - Mitigating Vulnerability of Water Resources  (with 6 countries)
  
- Danube Sediment Management – Assessment for Restoration of
 
Sediment Balance in the Danube River Basin (with 8 countries)
 
-
less country involved in contribution
, 
nevertheless with high definition project
result/effect towards  improvement of the region
, e.g.:
 
- Blue Danube – Improved framework conditions for fast track eco-
 
innovation in waste water treatment  (in cooperation two countries)
 
 
 
 
 
 
 
 
 
 
EU S
TRATEGY FOR THE 
D
ANUBE
 R
EGION
 (EUSDR)  |  www.danube-region.eu
 
WHAT ARE BENEFITS OF THE EUSDR ?
(Contributing for a more competitive Europe)
The EUSDR
can help effectively  the efforts for global economic crisis in sustainable
manner/way in the Region
 can contribute to reach relevant EU acquis/objectives
 can reinforce the major EU policy initiatives (mainly WFD and other
connecting directives, strategies, especially Europe 2020 Strategy) and
promote their implementation through projects
can develop/improve  the Danube Region balancing between protection of the
environment, sustainability and development
can reach targets of the EUSDR by promoted implementation of relevant
directives
can encourage  the non Member States in cooperation and contribution with
having regard their specific circumstances
 
 
 
EU S
TRATEGY FOR THE 
D
ANUBE
 R
EGION
 (EUSDR)  |  www.danube-region.eu
 
National 
Institut for Environment HU
 
Márvány u. 1/d
  
László PERGER
10
12
 
Budapest
  
laszlo
.perger
@
neki.gov.
hu
Hungary
 
Visit www.danube-region.eu
 
Thank you for attention
 
www.danube-region.eu
 
 
EU S
TRATEGY FOR THE 
D
ANUBE
 R
EGION
 (EUSDR)  |  www.danube-region.eu
 
 
EU S
TRATEGY FOR THE 
D
ANUBE
 R
EGION
 (EUSDR)  |  www.danube-region.eu
Slide Note
Embed
Share

This document outlines the implementation workflow, targets, actions, and roadmaps in the EU Strategy for the Danube Region. It covers initiatives to reduce nutrient levels in the Danube River, achieve management objectives, and promote sustainable water management practices. The focus is on collaborative efforts to protect the environment and enhance the ecosystem of the Danube River Basin.

  • EU Strategy
  • Danube Region
  • Implementation Workflow
  • Targets
  • Sustainable Water Management

Uploaded on Sep 13, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. WORKFLOW FOR IMPLEMENTATION in PA4 (From actions to road-maps) 6 November 2012 |Budapest, Hungary L szl Perger Co-coordinator of PA4

  2. OUTLINE The implementation workflow Targets Actions Road-maps Projects What are benefits of the EUSDR EU STRATEGY FOR THE DANUBE REGION (EUSDR) | www.danube-region.eu

  3. IMPLEMENTATION PYRAMID OF THE EUSDR TARGETS Feedback Annual Reports PROJECTS ROADMAPS ACTIONS EU STRATEGY FOR THE DANUBE REGION (EUSDR) | www.danube-region.eu

  4. TARGETS (with Actions concerned) I. Reduce the nutrient levels in the Danube River to allow the recovery of the Black Sea ecosystems to conditions similar to 1960s by 2020 1. Action: To foster and develop an active process of dialogue and cooperation between authorities responsible for agriculture and environment to ensure that measures are taken to address agricultural pollution Action: To legislate at the appropriate level to limit the presence of phosphates in detergents Action: To establish buffer strips along the rivers to retain nutrients and to promote alternative collection and treatment of waste in small rural settlements Action: To continue boosting major investments in building and upgrading urban wastewater treatment facilities across the Danube Basin, including measures to build capacity at the regional and local level for the design of such infrastructure 2. 3. 4. EU STRATEGY FOR THE DANUBE REGION (EUSDR) | www.danube-region.eu

  5. TARGETS (with Actions concerned) II. Achieve the management objectives set out in the Danube River Basin Management Plan 5. 6. Action: To implement fully the Danube River Basin Management Plan Action: To treat hazardous substances and contaminated sludge with the newest and best available technology and to develop and promote remediation measures for hazardous producing or abandoned industrial sites and waste deposits Action: To promote measures to limit water abstraction Action: To assure the proper control and progressive substitution of substances that are considered problematic for Danube Region Action: To continue to invest in and support the information collection systems already developed by ICPDR" Action: To strengthen general awareness and facilitate exchange of good practice in integrated water management issues in the Danube Basin among decision-makers at all levels and among the population of the Region Action: To promote measures aimed at reducing knowledge deficits, developing and transferring tools, methods and guidelines concerning the safeguarding of drinking water supply 7. 8. 9. 10. 11. EU STRATEGY FOR THE DANUBE REGION (EUSDR) | www.danube-region.eu

  6. TARGETS (with Actions concerned) III. Elaborate a Danube Delta Analysis Report by 2013 as a step towards completion of the Delta management Plan, which shall be adopted by 2015 12. Action: To further strengthen Integrated Coastal Zone Management (ICZM) and Maritime Spatial Planning (MSP) practices on the Western shores of the Black Sea IV. Secure viable populations of Danube sturgeon species 13. Action: To reduce existing water continuity interruption for fish migration in the Danube river basin V. Elaborate, adopt and implement the sub-basin management plans, such as Sava, Tisza and Prut sub-basins 14. Action: To greatly strengthen cooperation at sub-basin level EU STRATEGY FOR THE DANUBE REGION (EUSDR) | www.danube-region.eu

  7. ACTION GROUPES (cloustering of) 1. Actions for implementation of EU Directives & Strategies (in case of Water Quality: Action 1 & 14) 2. Actions for stronger EU by strengthening of cooperation between sub-regions, sub-basins, region countries and neighbourhood countries (in case of Water Quality: Action 2 & 6) 3. Actions for region development, innovation and competitiveness (in case of Water Quality: Action 3, 4, 5, 8 & 10) 4. Actions for sustainability by improvement and endorsement of rules and regulations (in case of Water Quality: Action 7, 9 & 11) 5. Actions for region-wide knowledge transferring (in case of Water Quality: Action 12 & 13) EU STRATEGY FOR THE DANUBE REGION (EUSDR) | www.danube-region.eu

  8. ROAD-MAPS (principles) AIM (of road-maps making) Presenting work-flows for implementation of Actions per PAs by transparent way and with responsibility for managing and controlling of action concerned STUCTURE (of road-maps) Milestones (main steps for implementation with very definite titles) Works ( detailed but concisely drafted content of tasks) Outputs (documents, upgraded technologies, monitoring, investments, etc.) Responsible (most relevant groups, institutions, project leaders, etc.) Deadline (expected dates to fulfill tasks nominated in works and/or outputs) Funding (sources, institutions if known or any) MANDATE Presented and discussed on SG meetings with members Approved by SG members with possibility of upgrading EU STRATEGY FOR THE DANUBE REGION (EUSDR) | www.danube-region.eu

  9. ROAD-MAPS (briefly summarized by Actions groups) 1. Actions for implementation of EU Directives & Strategies (in case of Water Quality: Action 1 & 14) Milestones: management planning according to WFD and Coastal Zone Management & Marine Strategy Framework Directive Works: Developments and updating tasks, planning Outputs: Analysis and interim reports, management plans Responsible: interested countries with coordination of ICPDR Project example: ICZM project Deadline: 2012-2015 Funding: EU EU STRATEGY FOR THE DANUBE REGION (EUSDR) | www.danube-region.eu

  10. ROAD-MAPS (briefly summarized by Actions groups) 2. Actions for stronger EU by strengthening of cooperation between sub- regions, sub-basins, region countries and neighbourhood countries (in case of Water Quality: Action 2 & 6) Milestones: Strengthening of cooperation in sub-basins between countries by development of management plans and between authorities (agricult. & enviro.) Works: Developments and updating tasks, management planning, Action Plan making for dialog between authorities Outputs: management plans (2nd ITRBMP, Danube Delta, Prut, Sava RBA,2nd Sava RBMP), Action Plan Responsible: interested countries with help of ICPDR, ICPDR Tisza Group, Sava Com. Project examples: Case studies on Tisza sub-basin, Pro Tisza, Early warning water quality monitoring , Danube Delta Sub-basin Analysis Report, Danube Delta Management Plan, Prut Management Plan Deadline:2012-2020 Funding: EU EU STRATEGY FOR THE DANUBE REGION (EUSDR) | www.danube-region.eu

  11. ROAD-MAPS (briefly summarized by Actions groups) 3. Actions for region development, innovation and competitiveness (in case of Water Quality: Action 3, 4, 5, 8 & 10) Milestones: Improvement of databases and GIS information systems, JTS3 and JTS1, implementation of UWWT and upgrading by technology development, decreasing of nutrient contamination by creating buffer zones and by WWT in less than 2000 PE settlements, treating hazardous substances and contaminated sludge by implementation of projects and knowledge transferring, reducing existing water continuity interruption in the Danube River Basin considering sediment management and regime restoration as well Works: as in Milestones Outputs: Inventories, surveys, feasibility and preparatory studies, investments, projects, programmes, Responsible: interested countries with help of ICPDR, ICPDR, ICPDR Tisza Group, Sava Com., national institutions, regional associations Project examples: Development of databases on inventories related to ARS, CS and MS, Further development of TNMN database, Development of database on inventories on HS, Monitoring survey on the Danube, Preparation of the JDS3 Report, Monitoring survey on the Tisza, Preparation of the JTS1 Report, Survey and assessment of hydro-ecology of the Tisza river, Membrane technology for specific contamination, Blue Danube, Programme for eco-friendly and site specific waste water treatment in case less then 2000 PE settlements, Survey on buffer zones, Feasibility study for restoring continuity at the Iron Gate dams, Danube Sediment management, Environmental status of Sediment, Water and Biota in the Sava River basin, Deadline:2012-2020 Funding: EU EU STRATEGY FOR THE DANUBE REGION (EUSDR) | www.danube-region.eu

  12. ROAD-MAPS (briefly summarized by Actions groups) 4. Actions for sustainability by improvement and endorsement of rules and regulations (in case of Water Quality: Action 7, 9 & 11) Milestones: Implementation of Regulation (EU) 259/2012 for detergents decreasing, testing of the EU Guidance document on EQS Directive, inventory on priority substances for preparation of national regulations, collection of good water demand and resources management practices in limitation of water abstraction considering Water Scarcity and Droughts Works: Survey on the P-free detergent ban in the Danube countries, implementation of pilot projects dealing with management of water shortages due to climate change effect Outputs: Projects, scenarios, analytical reports, inventories, dialogues between detergent industries and relevant stakeholders, methodologies for setting new regulation Responsible: interested countries with coordination of ICPDR Project examples: Emission reduction of priority substances in the Danube Basin, CC- WARE Mitigating vulnerability of Water Resources Deadline: 2012-2015 Funding: EU EU STRATEGY FOR THE DANUBE REGION (EUSDR) | www.danube-region.eu

  13. ROAD-MAPS (briefly summarized by Actions groups) 5. Actions for region-wide knowledge transferring (in case of Water Quality: Action 12 & 13) Milestones: Danube Days, Danube Watch and other mainly ICPDR relevant information sources to familiarize people with works doing for the Danube River Basin, information exchange on the progress, achievements and events, identify authorities, enterprises, associations responsible for drinking water supply to develop joint actions to protect the most valuable resources Works: Coordination of national efforts, promoting of user-friendly solutions, identifying actors, development of joint actions and implementation Outputs: Information items, websites, water prize awards, database, guidance documents for drinking water protection, pilot and safeguarding projects Responsible: ICPDR, interested countries with help of ICPDR, authorities, water works Projects examples: Potential projects on transboundary aquifer/river using for drinking water with common management and safeguarding zones Deadline: 2012-2015 Funding: EU EU STRATEGY FOR THE DANUBE REGION (EUSDR) | www.danube-region.eu

  14. PROJECTS Key expectation - be of macro-regional importance What kind of projects are of macro-regional importance? as a many of country as possible to be involved from the region to implementation region-wide already accepted targets, e.g.: - - CCWARE - Mitigating Vulnerability of Water Resources (with 6 countries) - Danube Sediment Management Assessment for Restoration of Sediment Balance in the Danube River Basin (with 8 countries) - less country involved in contribution, nevertheless with high definition project result/effect towards improvement of the region, e.g.: - Blue Danube Improved framework conditions for fast track eco- innovation in waste water treatment (in cooperation two countries) EU STRATEGY FOR THE DANUBE REGION (EUSDR) | www.danube-region.eu

  15. WHAT ARE BENEFITS OF THE EUSDR ? (Contributing for a more competitive Europe) The EUSDR can help effectively the efforts for global economic crisis in sustainable manner/way in the Region can contribute to reach relevant EU acquis/objectives can reinforce the major EU policy initiatives (mainly WFD and other connecting directives, strategies, especially Europe 2020 Strategy) and promote their implementation through projects can develop/improve the Danube Region balancing between protection of the environment, sustainability and development can reach targets of the EUSDR by promoted implementation of relevant directives can encourage the non Member States in cooperation and contribution with having regard their specific circumstances EU STRATEGY FOR THE DANUBE REGION (EUSDR) | www.danube-region.eu

  16. Thank you for attention www.danube-region.eu National Institut for Environment HU M rv ny u. 1/d 1012 Budapest Hungary L szl PERGER laszlo.perger@neki.gov.hu Visit www.danube-region.eu

  17. EU STRATEGY FOR THE DANUBE REGION (EUSDR) | www.danube-region.eu

  18. EU STRATEGY FOR THE DANUBE REGION (EUSDR) | www.danube-region.eu

Related


More Related Content

giItT1WQy@!-/#giItT1WQy@!-/#giItT1WQy@!-/#giItT1WQy@!-/#giItT1WQy@!-/#giItT1WQy@!-/#giItT1WQy@!-/#giItT1WQy@!-/#giItT1WQy@!-/#giItT1WQy@!-/#