FUA Restrictions Flight Plan Buffer Zones

FUA Restrictions Flight Plan Buffer Zones
Slide Note
Embed
Share

Switzerland is transitioning from route-based to airspace-based airspace management, affecting flight planning procedures. Updates include restrictions, buffer zones, and collaboration efforts with stakeholders to ensure smooth transitions and mitigate risks.

  • Switzerland
  • Airspace Management
  • Flight Planning
  • Restrictions
  • Buffer Zones

Uploaded on Feb 19, 2025 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. FUA Restrictions Flight Plan Buffer Zones

  2. Introduction Within the frame of the Free Route activities, Switzerland is moving from a route-based airspace management philosophy to an airspace-based one. This change will have consequences for flight planning. A step-by-step approach has been chosen for this change 1

  3. FUA Restrictions FUA Restrictions for the central / west part of Switzerland are already published in RAD Appendix 7 As soon as relevant training is completed, AMC Switzerland will start to activate those restrictions in AUP / UUP This is expected for spring 2018 RESTRICTION RSA ID Number Not available for traffic during the times and within the vertical limits allocated at EAUP/EUUP Except ARR LSGS/MS, DEP LSGS/MS LST21 LST21R 2

  4. FUA Restrictions Apart from the FUA restriction in RAD Appendix 7, skyguide will use the following type of restriction in RAD Appendix 4 referencing TRA activations from AUP / UUP This is in response to an airline request to improve the availability of this DCT segment CFSPs are (again) invited to give feedback on the codeability in their flight planning software 3

  5. Flight Plan Buffer Zones (FBZ) With effect from 1stFebruray 2018, Switzerland has published Flight Plan Buffer Zones for all Temporary Reserved Areas (TRAs). However, FBZs will not be activated via AUP/UUP until validation activities have been completed. FBZ publication is currently limited to national territory only. Skyguide is open for cross-border publication of FBZs when and where needed. 4

  6. Flight Plan Buffer Zones (FBZ) Issue: As the FBZs must cover the total volume of airspace to be avoided at flight planning level, those buffer zones come very close to permanent ATS routes (and permanently available DCT segments) 5

  7. Flight Plan Buffer Zones (FBZ) Because of this proximity, a certain risk exists that permanently available trajectories are blocked (SESAR FREE Solutions Live Trial) To avoid this, skyguide is planning a series of validation and testing activities and is kindly asking CFSPs / AOs and Eurocontrol for support: - Validation of FBZ boundaries against ATS Routes and DCTs in flight planning software and in CACD / EAD - Prevalidation session in NMOC with participation of CFSPs Timeline: The aim is to conduct all preparations during the course of spring / summer and to finally activate FBZs and corresponding restrictions in AUP / UUP at the latest end of 2018. 6

  8. Questions / Discussion 7

  9. 8

More Related Content