Evidence-Based Assurance with Analyst Workbench Overview

 
Evidence-Based Assurance with the
Analyst Workbench
 
Zachary Seamon, Donald Kranz
5
th
 Annual IV&V International Workshop
IV&V Analysis Management
Framework (AMF)
2
Analyst Workbench (AWB
) Overview
3
Analysis Palette
Traceability Graph View
Artifact Property View
Assessment Property View
Search View
Perspectives, Views
 and Preferences
4
Analysis Palette
5
Traceability Graph View
6
Artifact Property View
7
 
Assessment Property View
 
8
 
Search View
 
9
 
Evidence-Based Assurance
 
10
Other Project
Artifacts
Supplemental
Representations
Criteria
IV&V
Analysis
 
Technical Reference
Evidence
 
IV&V
Sources
 
Outside
Sources
Target
Artifacts
Assessment Artifact Traces
 
References to
project
artifacts
Assessment Assessment Traces
 
Here’s My Claim
 
A Claim is a type of Assessment in AWB
Make an initial Claim by creating an assessment.
The claim can be found in the Analysis Palette
Claim details are shown in the Assessment Property
View
 
11
 
Here’s My Argument & Evidence
 
Additional Assessment
records can be made to
record Arguments
Evidence can be linked
to the Claim’s
arguments. Evidence
may be other
Assessments, or Project
Artifacts.
 
12
Discovery – via view traces
13
A completed Claim can be
followed, using traces,
from the top Claim
Assessment.
In addition, the Claim can
be seen as attached when
looking at other Artifacts
or Assessments.
 
Conclusion
 
The AWB’s robust tracing and graphing capabilities
make it the ideal tool to seamlessly integrate
Evidence-Based Assurance into the IV&V Program in
a dynamic, useful, and easy to implement fashion.
The AWB’s advantage over other methods is its ability
to create Assurance Cases and record evidence
dynamically throughout the life of the project,
without requiring extensive additional effort from
analysts to create separate diagrams or documents to
organize and illustrate their evidence.
 
14
 
AMF / AWB Core to
 IV&V Effort
 
assess AWB as a tool for team’s analysis efforts.
The AWB core tool at NASA IV&V going forward.
Requirements, Code, Design, Con Ops, Test Plans, Managing
 
15
Slide Note

The Analyst Workbench is an IVV-developed Eclipse tool that interfaces with the AMF data structure to provide dynamic traceability views between requirements, design documentation, analyst assessments, and other project data. The AWB provides a powerful visual representation of project data and data relationships that other tools lack. This demonstration will provide an overview of the capabilities of the AWB, showing the tool’s ability to capture evidence for assurance cases, and enhance both the quality and quantity of work for analysts and managers. Attendees will see a general overview of the tool, and attain the knowledge necessary to assess if the AWB may be a valuable tool for their team’s analysis efforts. The AWB will become a core tool in the analysis and management efforts of NASA IV&V going forward.

Embed
Share

A detailed look at the IV&V Program's Evidence-Based Assurance with the Analyst Workbench, including Analysis Management Framework, Perspectives, and more. Explore Claims, Arguments, and Evidence within the program.

  • IV&V Program
  • Analyst Workbench
  • Evidence-Based Assurance
  • Analysis Management
  • Claims

Uploaded on Feb 19, 2025 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. IV&V Program Evidence-Based Assurance with the Analyst Workbench Zachary Seamon, Donald Kranz 5thAnnual IV&V International Workshop AMF

  2. IV&V Analysis Management Framework (AMF) IV&V Program AMF 2

  3. Analyst Workbench (AWB) Overview IV&V Program Analysis Palette Traceability Graph View Assessment Property View Search View Artifact Property View AMF 3

  4. Perspectives, Views and Preferences IV&V Program AMF 4

  5. Analysis Palette IV&V Program AMF 5

  6. Traceability Graph View IV&V Program AMF 6

  7. Artifact Property View IV&V Program AMF 7

  8. Assessment Property View IV&V Program AMF 8

  9. Search View IV&V Program AMF 9

  10. Evidence-Based Assurance IV&V Program Other Project Artifacts References to project artifacts Target Artifacts IV&V Analysis Evidence Technical Reference IV&V Supplemental Representations Sources Outside Sources Criteria AMF Assessment Artifact Traces Assessment Assessment Traces 10

  11. Heres My Claim IV&V Program A Claim is a type of Assessment in AWB Make an initial Claim by creating an assessment. The claim can be found in the Analysis Palette Claim details are shown in the Assessment Property View AMF 11

  12. Heres My Argument & Evidence IV&V Program Additional Assessment records can be made to record Arguments Evidence can be linked to the Claim s arguments. Evidence may be other Assessments, or Project Artifacts. AMF 12

  13. Discovery via view traces IV&V Program A completed Claim can be followed, using traces, from the top Claim Assessment. In addition, the Claim can be seen as attached when looking at other Artifacts or Assessments. AMF 13

  14. Conclusion IV&V Program The AWB s robust tracing and graphing capabilities make it the ideal tool to seamlessly integrate Evidence-Based Assurance into the IV&V Program in a dynamic, useful, and easy to implement fashion. The AWB s advantage over other methods is its ability to create Assurance Cases and record evidence dynamically throughout the life of the project, without requiring extensive additional effort from analysts to create separate diagrams or documents to organize and illustrate their evidence. AMF 14

  15. AMF / AWB Core to IV&V Effort IV&V Program assess AWB as a tool for team s analysis efforts. The AWB core tool at NASA IV&V going forward. Requirements, Code, Design, Con Ops, Test Plans, Managing AMF 15

Related


More Related Content

giItT1WQy@!-/#giItT1WQy@!-/#giItT1WQy@!-/#giItT1WQy@!-/#