EU Hardwoods Meeting Agenda Highlights
The EU Hardwoods Meeting, held on 25th and 26th June 2016, covered various topics including project extensions, recent results, data analysis, and future steps related to hardwood strength data and grading tools. The agenda featured discussions on project timelines, costs, and testing plans, emphasizing the collaboration among different entities for the advancement of the industry.
Download Presentation
Please find below an Image/Link to download the presentation.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
E N D
Presentation Transcript
EU Hardwoods Meeting FCBA / 25.06.2016
Agenda 25.06.2015 12:00 12:30 12:30 13:00 Lunch WP0 acceptance of last minutes information on project s extension, reporting internal reports presentation of recent results CT scanning of beech outlook next steps discussion status (deadlines, timetable, costs, problems) status lamella data collection testing plan outlook next steps discussion status (deadlines, timetable, costs, problems) analysis of data: requirements and approach outlook next steps discussion status (deadlines, timetable, costs, problems) HFA 13:00 14:30 WP1 FVA 14:30 16:00 WP2 HFA / FCBA 16:00 16:30 WP6 UL 2
Agenda 26.06.2015 09:00 09:30 WP0 Horizon 2020, ERA, strategy 09:30 12:00 WP3 recent results outlook next steps discussion status (deadlines, timetable, costs, problems) any other business date and place for next meeting MPA FCBA MPA ALL WP4 WP5 12:00 12:30 WP0 3
WP0 project extension on 31.03.2015 official request for extension until 31.12.2016 sent to WWN secretariat Germany FNR Slovenia MIZS Austria BMLFUW France ADEME / MAAF FNR and MIZS need official national request getting in contact with BMLFUW and ADEME / MAAF for details is advised 4
WP0 - general contribution to WWN newsletter deadline: 03.08.2015 1stWWN report period: 01.01.2014 - 31.07.2015 submission deadline: 31.08.2015 status reports o basis for WWN reporting o help to keep track of the project s progress o to be prepared and sent to HFA and UL quarterly WWN seminar at EMPA 14./15.09.2015 registration is open (http://www.woodwisdom.net/seminar-14-15-sept-2015/) 5
WP2 HFA (lead), FCBA, Uni LJ, FVA, FVH 2 WP2 - Basic hardwood strength data and grading tools survey on existing lamella data with respect to species and dimensions allocation of hardwood lamellas to strength classes, lamella testing if necessary consolidate visual grading rules, obstacles machine strength grading 2.1 2.2 2.3 6
WP2.1 survey existing data 2014 2015 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 2.1 survey on existing lamella data with respect to species and dimensions pt. 1: existing allocations & visual grading rules & machine grading input data collection data verification and discussion on aspired strength class combinations 7
WP2.1 survey existing data tension European oak (DE/CZ/FR): White oak (US): Sweet chestnut (ES): Birch (N.N.): Beech (DE): n = 300 n = 100 n = 249 n = 40 n = 21 bending edgewise European oak (AT): n = 345 finger joints European oak: White oak: Sweet chestnut: Birch: Beech: bending = 260 bending = 140 bending = 212 bending = 20 tension = 296 tension = 100 tension = 109 tension = 20 tension = 21 8
WP2.2 2015 2016 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 2.2 allocation of hardwood lamellas to strength classes decision on allocation based on report only or report to TG1 for EN1912 allocation based on existing data new data (if necessary) material supply visual grading and tensile testing (who is testing what) allocation based on existing and new data 9
WP2.2 test plan finger-joint data lamella data CLT & glulam data scantling data additional testing? (what / how much / why) 10
WP2.3 2015 2016 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 2.3 consolidate visual grading rules, obstacles machine strength grading pt. 2 (attempt to consolidate visual grading rules, obstacles in machine grading) compendium hardwood usage 11
WP2 outlook fixing allocations realization of test plan 12
WP2 status cost (16.06.2015) 40.000 (22%) 13
WP0 strategy European interest in research related to hardwood pro-active positioning for H2020 / ERA / WWN / ? 14
Standort Arsenal Standort Stetten Dipl.-Forstw. Peter Linsenmann p.linsenmann@holzforschung.at Tel. +43/1/798 26 23-51 www.holzforschung.at