Emergency Bridge Repair Program Overview

Slide Note
Embed
Share

This document provides an overview of the 4SR7 Emergency Bridge Repair Program, funded by the Central Office for annual allocations. It covers eligible costs, points of contact, and the process for establishing accounts receivable. The program specifically addresses structural damage to bridges caused by accidents, providing 100% coverage of contract costs within 18 months of the incident date. Contacts include Brenna Smathers, the program manager, and various finance and engineering personnel. The process involves submitting necessary information for approval before project initiation.


Uploaded on Sep 28, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. 4SR7 Emergency Bridge Repair Program Overview Division of Finance October 2017

  2. Overview Program Overview Eligible Costs Program Points of Contact Process Establishing Accounts Receivable 4SR7 Funded Bridge Hits 2

  3. Program Overview

  4. 4SR7 Program Overview Central Office funded program for emergency bridge damage repairs. Estimated $1M new allocation annually Alleviates districts from using district allocations for these types of repairs. Damages that affect structural integrity & unsafe for motoring public. 4

  5. Eligible Costs

  6. Eligible 4SR7 Costs 100% of contract cost only. Structural damage to bridges by accidents. Not eligible for graffiti, guardrail hits Program covers costs if repairs completed within 18 months from accident date. Extensions upon program manager approval 6

  7. Program Points of Contact

  8. 4SR7 Points of Contact Brenna Smathers, 4SR7 Program Manager, Central Office Finance/Accounts Receivable. Sara Downs, Budget Administrator Tim Keller, Mike Loeffler, Mike Brokaw, CO Structural Engineering. 8

  9. 4SR7 Process

  10. 4SR7 Process Email CO Finance program manager Brenna Smathers and CO Structural Engineering, include the following information: Accident report Bridge inspection report Estimate amount Pictures Bridge Number & Location Date of accident Approximate Sale Date-Quarter/Year (within 18 months of accident date) Was the bridge already scheduled for maintenance or repair? 10

  11. 4SR7 Process If 4SR7 funds are being requested, Brenna Smathers will email with approval/disapproval for use of the program based on the criteria sent. Upon approval the district can enter the project into Ellis Programming using the Bridge Damage SAC 4SR7. The District will need to email the PID and estimated completion date to CO, Brenna Smathers. 11

  12. 4SR7 Process If additional 4SR7 funds are needed at a later date: Email CO Brenna Smathers requesting additional funds before making any changes in ELLIS. This is to ensure 4SR7 funds are available for the fiscal year. Once approved, the district will receive a reply to confirm the increase in 4SR7 is available and approved. 12

  13. Establishing Accounts Receivable

  14. Establish Accounts Receivable When project is complete, within 45 days the district will collect the billing documentation needed to bill the driver and company/owner of vehicle: Copy of all bids received for project Contractor costs Any ODOT labor, daily dairies, equipment and/or materials used If a lump sum bid such as heat straightening, a copy of the bid Include the Bridge Damage Invoice Checklist (provided by CO), summarizing the costs with a grand total for billing. 2 copies of the costs package should be sent to Brenna Smathers to bill. 14

  15. Establish Accounts Receivable When the district is NOT using or approved for 4SR7 funds, the district accounting office will invoice the driver for the damages. Once repairs are completed, all documentation will go to the district accounting personnel to create an invoice in the receivables system (ARS) using the appropriate damage coding (452500B). 15

  16. 4SR7 Funded Bridge Hits

  17. Funded 4SR7 Bridge Hits Examples: FRA-I-270/I-70 Tanker Fire - $2.2M (7/15) WAY-US30-16.61 Bridge Hit $384,780 (10/15) FRA-US23/SR104 Removal & Rebuild-$632,000 (1/16) FRA-270/33 Bridge Fire, Estimate $675,000 (1/17) FAI-33-11.59 Bridge Hit, Estimate $380,000 (3/17) 17

  18. Questions? 18

More Related Content