Curb and Gutter Construction Details

 
Curb and Gutter
 
Under Construction
 
Completed
 
 
Gutter
Curb
 
Curb and Gutter Formwork
 
http://overmanconcrete.com/concrete-services.html
 
Curb and Gutter Machine
 
http://overmanconcrete.com/concrete-services.html
 
Gutter Flow
 
d
 
T
 
S
x
 
1
 
Q = flow in gutter (cfs)
K
c
 = coefficient (0.56 for US units, 0.376 for SI units
S
L
 = longitudinal slope
T = spread (ft)
S
x
 = transverse slope
 
Ref: Haested p. 99
 
City of Austin Drainage Criteria for
Minimum Clear Width
 
City of Austin, Drainage Criteria Manual, Section 3
 
Flow into a Curb Inlet
 
L
T
 = required length 
to intercept all flow (ft)
Q = flow in gutter (cfs)
K
c
 = coefficient (0.60 for US units, 0.817 for SI units)
S
L
 = longitudinal slope
S
x
 = transverse slope
 
Ref: Haested p. 103
 
E = efficiency (proportion of flow captured
L = actual length (ft)  
(for L < L
T
)
 
 
L
T
Slide Note
Embed
Share

Curb and gutter construction involves various stages such as formwork, machine operations, flow measurements, drainage criteria, and curb inlet details. Referencing manuals and websites, these details provide insights into the process and requirements for efficient construction and management of curbs and gutters in urban areas.

  • Construction
  • Drainage
  • Curb
  • Gutter
  • Urban

Uploaded on Mar 02, 2025 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. Curb and Gutter Under Construction Completed Curb Gutter http://www.ellsworthinc.com/concretework.html http://www.sscsitework.com/Photo-Gallery.html

  2. Curb and Gutter Formwork http://overmanconcrete.com/concrete-services.html

  3. Curb and Gutter Machine http://overmanconcrete.com/concrete-services.html

  4. Gutter Flow 1 2? 5 3?? ? =?? 8 3 ??? T Sx d 1 Q = flow in gutter (cfs) Kc = coefficient (0.56 for US units, 0.376 for SI units SL = longitudinal slope T = spread (ft) Sx = transverse slope Ref: Haested p. 99

  5. City of Austin Drainage Criteria for Minimum Clear Width City of Austin, Drainage Criteria Manual, Section 3

  6. Flow into a Curb Inlet LT 0.6 1 0.3 ??= ???0.42?? ??? LT = required length to intercept all flow (ft) Q = flow in gutter (cfs) Kc = coefficient (0.60 for US units, 0.817 for SI units) SL = longitudinal slope Sx = transverse slope 1.8 ? ? = 1 1 ?? E = efficiency (proportion of flow captured L = actual length (ft) (for L < LT) Ref: Haested p. 103

More Related Content

giItT1WQy@!-/#giItT1WQy@!-/#