Construction Project Execution Guidelines

undefined
 
To be followed by:
1.
Contractor 
2.
Project Implementation Unit 
3.
Project Management Unit
undefined
 
Stages:
1.
Deployment of Manpower 
2.
Deployment of Manpower for Lab 
3.
Deployment of Manpower of
Execution
undefined
 
4. Deployment of Machineries:
i.
Reclaimer
ii.
Cement Spreader & Additive
Spreader
iii.
Pat Foot Roller
iv.
Tandum Roller/Soil Compactor 
v.
Pneumatic Tyre Roller 
vi.
Water Tanker 
vii.
Motor Grader 
undefined
 
5. Arrangement of Additive:
    Details of Additives required to be
submitted by the contractor
i.
Brand Name and Manufacturer Detail 
ii.
IRC Accreditation or Equivalent
Accreditation Certificate  
iii.
Leaching Test Report 
iv.
Procurement Detail of the Material
(submitted to the PIU time to time).
undefined
 
6. Submission of JMF 
Following information is to be submitted
to the PIU:
i.
MDD and OMC 
ii.
7
th
 day and 28
th
 day UCS
iii.
Flexural Strength 
iv.
Durability 
v.
Residual Strength 
undefined
 
7. Stagewise Activities of Work Execution
1. Collection of Material Sample for JMF
Responsible Person -PIU+PMU+Contractor
2. Procurement and Evaluation of JMF
Responsible Person -PIU+PMU
3. Establishment of Information Sign board &
Citizen Information Board
Responsible Person –Contractor
4. Setting of works - Establishment of Bench
Mark (RBM/TBM)/ Reference Pillers
 
Responsible Person –Contractor
undefined
 
5. 
Establishment of Central Laboratry and
Packagewise Laboratories
Responsible Person-Contractor
6. 
Joint Survey of the road and CD structure
Responsible Person -
 PIU & Contractor
7. 
Finalization of Road level
Responsible Person –
PIU & Contractor
8. 
Clearing & Grubbing
 
Responsible Person –Contractor
undefined
 
9. 
Execution of Embankment and Subgrade
Responsible Person-Contractor
10. 
Dismentaling of Existing Pavement &
Spreading in required width
Responsible Person -
 Contractor
11. 
Construction of Trial Patch
Responsible Person –
PIU & Contractor
12. 
Execution of Stabilization work of
remaining length 
 Responsible Person–
PIU, PMU & Contractor
undefined
 
13. 
Prime coat over FDR base
Responsible Person-PIU & Contractor
14. 
Tack Coat
Responsible Person -
 Contractor
15. 
Laying of SAMI Layer
Responsible Person –
PIU, PMU & Contractor
16. 
Laying of Tack coat over SAMI layer
under with BC
 Responsible Person–
PIU, PMU & Contractor
undefined
 
17. 
Laying of BC
Responsible Person-
 PIU, PMU & Contractor
18. 
Speed braker as required
Responsible Person -
 PIU & Contractor
19. 
Construction of Side drain and paneled
concrete pavement in the built up area.
Responsible Person –
PIU & Contractor
20. 
Fixing of Caution Board & Village Boards,
Logo Board, Fixing of Cateyes,. Marking of
Edge Lines.
 Responsible Person–
PIU & Contractor
Slide Note
Embed
Share

This guide outlines the stages and activities involved in the execution of a construction project, including deployment of manpower, machineries, and additives, submission of required information, and establishment of laboratories. It also covers the responsibilities of contractors, project management units, and the implementation unit throughout the project lifecycle.

  • Construction project
  • Execution guidelines
  • Deployment
  • Manpower
  • Machineries

Uploaded on Oct 07, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. To be followed by: 1.Contractor 2.Project Implementation Unit 3.Project Management Unit

  2. Stages: 1.Deployment of Manpower 2.Deployment of Manpower for Lab 3.Deployment Execution of Manpower of

  3. 4. Deployment of Machineries: i. Reclaimer ii. Cement Spreader iii. Pat Foot Roller iv. Tandum Roller/Soil Compactor v. Pneumatic Tyre Roller vi. Water Tanker vii.Motor Grader Spreader & Additive

  4. 5. Arrangement of Additive: Details submitted by the contractor i. Brand Name and Manufacturer Detail ii. IRC Accreditation Certificate iii.Leaching Test Report iv.Procurement (submitted to the PIU time to time). of Additives required to be Accreditation or Equivalent Detail of the Material

  5. 6. Submission of JMF Following information is to be submitted to the PIU: i. MDD and OMC ii.7th day and 28th day UCS iii.Flexural Strength iv.Durability v.Residual Strength

  6. 7. Stagewise Activities of Work Execution 1. Collection of Material Sample for JMF Responsible Person -PIU+PMU+Contractor 2. Procurement and Evaluation of JMF Responsible Person -PIU+PMU 3. Establishment of Information Sign board & Citizen Information Board Responsible Person Contractor 4. Setting of works - Establishment of Bench Mark (RBM/TBM)/ Reference Pillers Responsible Person Contractor

  7. 5. Establishment of Central Laboratry and Packagewise Laboratories Responsible Person-Contractor 6. Joint Survey of the road and CD structure Responsible Person - PIU & Contractor 7. Finalization of Road level Responsible Person PIU & Contractor 8. Clearing & Grubbing Responsible Person Contractor

  8. 9. Execution of Embankment and Subgrade Responsible Person-Contractor 10. Dismentaling of Existing Pavement & Spreading in required width Responsible Person - Contractor 11. Construction of Trial Patch Responsible Person PIU & Contractor 12. remaining length Responsible Person PIU, PMU & Contractor Execution of Stabilization work of

  9. 13. Prime coat over FDR base Responsible Person-PIU & Contractor 14. Tack Coat Responsible Person - Contractor 15. Laying of SAMI Layer Responsible Person PIU, PMU & Contractor 16. Laying of Tack coat over SAMI layer under with BC Responsible Person PIU, PMU & Contractor

  10. 17. Laying of BC Responsible Person- PIU, PMU & Contractor 18. Speed braker as required Responsible Person - PIU & Contractor 19. Construction of Side drain and paneled concrete pavement in the built up area. Responsible Person PIU & Contractor 20. Fixing of Caution Board & Village Boards, Logo Board, Fixing of Cateyes,. Marking of Edge Lines. Responsible Person PIU & Contractor