“Pet Peeve Bid items”
Items that contractors routinely use to ruin the field
staff’s day.
Volume 1 of ?
390.0303 – Base Patching Concrete
390.0305 – Base Patching Concrete SHES
Used when overlaying concrete with asphalt.
416.1710 – Concrete Pavement Repair
416.1715 – Concrete Pavement Repair SHES
15 feet in length and under.
416.1720 – Concrete Pavement Replacement
416.1725 – Concrete Pavement Replacement SHES
Over 15’ in length to 300’ in length
Used when the concrete repair/replacement is the finished surface
Similarities…..
items include the cost of removal of the existing concrete pavement.
items do not include payment for sawcuts for removal.
m
e
a
s
u
r
e
d
 
f
o
r
 
p
a
y
m
e
n
t
 
b
y
 
t
h
e
 
S
.
Y
.
a
r
e
 
c
o
n
s
i
d
e
r
e
d
 
A
n
c
i
l
l
a
r
y
 
C
o
n
c
r
e
t
e
 
f
o
r
 
m
a
t
e
r
i
a
l
s
 
p
u
r
p
o
s
e
s
.
items do not include payment for Drilled Tie Bars and Drilled Dowel Bars.
i
t
e
m
s
 
h
a
v
e
 
3
 
u
n
i
q
u
e
 
s
t
a
n
d
a
r
d
 
d
e
t
a
i
l
 
d
r
a
w
i
n
g
s
 
t
h
a
t
 
s
h
o
u
l
d
 
b
e
 
i
n
 
y
o
u
r
 
p
l
a
n
s
.
UNIQUE to the bid item.
Differences…..
Materials.
390.0303 – Base Patching Concrete
   
Type B Family Concrete(400 lbs. cement /CY)
390.0305 – Base Patching Concrete SHES
  
Follow 416.2 (846 lbs cement/CY)
Opening Strength 2000 psi.
416.1710 – Concrete Pavement Repair
   
Type C Family Concrete (660 lbs. cement/CY
)
416.1715 – Concrete Pavement Repair SHES
 
Follow 416.2 (846 lbs cement/CY)
416.1720 – Concrete Pavement Replacement
 
Type C Family Concrete (660 lbs. cement/CY
)
416.1725 – Concrete Pavement Replacement SHES
 
Follow 416.2 (846 lbs cement/CY)
Opening Strength 3000 psi
Consolidation and Strike off
390.0303 – Base Patching Concrete   
   
hand methods
390.0305 – Base Patching Concrete SHES
  
hand methods
(You may see the power rolling pin)
416.1710 – Concrete Pavement Repair
   
Vibrator and Vibrating Screed
416.1715 – Concrete Pavement Repair SHES
 
 Vibrator and Vibrating Screed
416.1720 – Concrete Pavement Replacement**
 
 Vibrator and Vibrating Screed
416.1725 – Concrete Pavement Replacement SHES**
 
 Vibrator and Vibrating Screed
** contractor may want to use a concrete paver on longer patches
Surface Finish.
390.0303 – Base Patching Concrete   
   
Strike off flush
390.0305 – Base Patching Concrete SHES
  
Strike off flush
416.1710 – Concrete Pavement Repair
   
Tined or Turf Drag
416.1715 – Concrete Pavement Repair SHES
 
Tined of Turf Drag
416.1720 – Concrete Pavement Replacement
 
Tined or Turf Drag
416.1725 – Concrete Pavement Replacement SHES  Tined or Turf Drag
Field Staff Day is Ruined….
Base Patching/ Concrete Repair projects usually…
Have the contractor show up unannounced with a large workforce.
Plenty of inspectors required.
Lots to measure / keep track of
Full Depth Sawcuts
Patch size.
Usually at least 2 mix designs running and being placed concurrently
Drilled Dowel Bars
Drilled Tie Bars
Quality checks to make sure work is being done according to plan.
Field Staff Day is Ruined….
Contractor will want to be paid for Tie Bars and Dowel Bars,
and will usually challenge the quantity for these items in the
plans.
Contractor usually forgets the word….
Drilled
We only pay for 
Drilled 
tie bars and 
Drilled
 dowel bars.  The rest
are incidental.
Field Staff Day is Ruined….
C
o
n
t
r
a
c
t
o
r
 
w
a
n
t
s
 
t
o
 
a
r
g
u
e
 
t
h
e
 
a
m
o
u
n
t
 
o
f
 
s
a
w
c
u
t
s
 
.
a
f
t
e
r
 
t
h
e
 
f
a
c
t
.
 
See item 690.0250, Sawing Concrete for guidance on measurement
 
Contractor may want to argue the need for additional sawcuts
 
Contractor may want to argue that “everyone else pays for additional sawcuts”
 
Contractor may want to be paid for sawcuts along the asphalt shoulder.
Contractor will want to argue that the quantity of SHES
patches/repairs paid for is wrong based on which type of
patch has the higher price.
Keep good records on all patching/repair quantities
Keep good records on material used for each
patch/repair
Keep records on SHES patches/repairs placed for the
contractor’s convenience
.
 
When doing SHES work, it is becoming state practice to
do this work at night.
Field Staff Day is REALLY Ruined….
The SHES patches don’t set up and you have to open for
traffic!!!
.
undefined
608-469-0456
david.pilon@dot.wi.gov
Slide Note
Embed
Share

Explore different bid items and techniques used for concrete pavement repair and replacement, including base patching with Type B and Type C Family Concretes, consolidation methods, surface finishing options, and key similarities and differences between various materials. Gain insights into contractor practices and standards for ensuring durable and quality concrete surfaces in road construction projects.

  • Concrete pavement
  • Repair techniques
  • Base patching
  • Surface finishing
  • Contractor practices

Uploaded on Sep 16, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. 608-469-0456 david.pilon@dot.wi.gov

  2. Pet Peeve Bid items Items that contractors routinely use to ruin the field staff s day. Volume 1 of ?

  3. 390.0303 Base Patching Concrete 390.0305 Base Patching Concrete SHES Used when overlaying concrete with asphalt. 416.1710 Concrete Pavement Repair 416.1715 Concrete Pavement Repair SHES 15 feet in length and under. 416.1720 Concrete Pavement Replacement 416.1725 Concrete Pavement Replacement SHES Over 15 in length to 300 in length Used when the concrete repair/replacement is the finished surface

  4. Similarities.. items include the cost of removal of the existing concrete pavement. items do not include payment for sawcuts for removal. measured for payment by the S.Y. are considered Ancillary Concrete for materials purposes. items do not include payment for Drilled Tie Bars and Drilled Dowel Bars. items have 3 unique standard detail drawings that should be in your plans. UNIQUE to the bid item.

  5. Differences.. Materials. 390.0303 Base Patching Concrete 390.0305 Base Patching Concrete SHES Type B Family Concrete(400 lbs. cement /CY) Follow 416.2 (846 lbs cement/CY) Opening Strength 2000 psi. 416.1710 Concrete Pavement Repair 416.1715 Concrete Pavement Repair SHES 416.1720 Concrete Pavement Replacement 416.1725 Concrete Pavement Replacement SHES Follow 416.2 (846 lbs cement/CY) Type C Family Concrete (660 lbs. cement/CY) Follow 416.2 (846 lbs cement/CY) Type C Family Concrete (660 lbs. cement/CY) Opening Strength 3000 psi

  6. Consolidation and Strike off 390.0303 Base Patching Concrete 390.0305 Base Patching Concrete SHES (You may see the power rolling pin) hand methods hand methods 416.1710 Concrete Pavement Repair 416.1715 Concrete Pavement Repair SHES 416.1720 Concrete Pavement Replacement** Vibrator and Vibrating Screed 416.1725 Concrete Pavement Replacement SHES** ** contractor may want to use a concrete paver on longer patches Vibrator and Vibrating Screed Vibrator and Vibrating Screed Vibrator and Vibrating Screed

  7. Surface Finish. 390.0303 Base Patching Concrete 390.0305 Base Patching Concrete SHES Strike off flush Strike off flush 416.1710 Concrete Pavement Repair 416.1715 Concrete Pavement Repair SHES 416.1720 Concrete Pavement Replacement 416.1725 Concrete Pavement Replacement SHES Tined or Turf Drag Tined or Turf Drag Tined of Turf Drag Tined or Turf Drag

  8. Field Staff Day is Ruined. Base Patching/ Concrete Repair projects usually Have the contractor show up unannounced with a large workforce. Plenty of inspectors required. Lots to measure / keep track of Full Depth Sawcuts Patch size. Usually at least 2 mix designs running and being placed concurrently Drilled Dowel Bars Drilled Tie Bars Quality checks to make sure work is being done according to plan.

  9. Field Staff Day is Ruined. Contractor will want to be paid for Tie Bars and Dowel Bars, and will usually challenge the quantity for these items in the plans. Contractor usually forgets the word . Drilled We only pay for Drilled tie bars and Drilled dowel bars. The rest are incidental.

  10. Field Staff Day is Ruined. Contractor wants to argue the amount of sawcuts .after the fact. See item 690.0250, Sawing Concrete for guidance on measurement Contractor may want to argue the need for additional sawcuts Contractor may want to argue that everyone else pays for additional sawcuts Contractor may want to be paid for sawcuts along the asphalt shoulder.

  11. Contractor will want to argue that the quantity of SHES patches/repairs paid for is wrong based on which type of patch has the higher price. Keep good records on all patching/repair quantities Keep good records on material used for each patch/repair Keep records on SHES patches/repairs placed for the contractor s convenience.

  12. When doing SHES work, it is becoming state practice to do this work at night.

  13. Field Staff Day is REALLY Ruined. The SHES patches don t set up and you have to open for traffic!!! .